Abstract

Abstract An elastomeric pavement repair composition for pavement failure and a method of preparation thereof comprising of paving grade asphalt and rubber. The asphalt is heated to an elevated temperature and the rubber is combined therewith. The resulting composition is mixed to form a hot jellied composition which can be applied to cracked or distressed pavements to repair the same.

Inventors

  • 👤 Charles H. McDonald

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 12:56
CPC Classifications
E; E01; E01C; E01C7/00; E01C7/08; E01C7/18; E01C7/26; E01C7/265; C; C08; C08L; C08L95/00; E01C7/187

Claims Analysis

Total Claims: 24
Claim 1
Independent Claim 71 words
An elastomeric material consisting essentially of paving grade asphalt and non-oil resistant asphalt-soluble rubber; the material being prepared by heating paving grade asphalt to a temperature of from about 300° F to about 500° F to yield hot liquid asphalt; mixing between about one part and about five parts by weight of the hot asphalt with about one part by weight particulate non-oil resistant asphalt-soluble rubber to form a jellied composition.
Claim 2
Dependent Claim 71 words
An elastomeric material consisting essentially of paving grade asphalt and non-oil resistant asphalt-soluble rubber; the material being prepared by heating paving grade asphalt to a temperature of from about 300° F to about 500° F to yield hot liquid asphalt; mixing between about one part and about five parts by weight of the hot asphalt with about one part by weight particulate non-oil resistant asphalt-soluble rubber to form a jellied composition.
Claim 3
Dependent Claim 24 words
The material as defined in claim 1 wherein the asphalt is heated to a temperature of from about 350° F to about 425° F.
Claim 4
Dependent Claim 22 words
The material as defined in claim 1 wherein the asphalt is paving grade asphalt having a penetration range of 10 through 300.
Claim 5
Dependent Claim 22 words
The material as defined in claim 1 wherein the particulate rubber has a mesh size of from about -#4 to about +#200.
Claim 6
Dependent Claim 27 words
The material as defined in claim 1 wherein the asphalt is selected from paving grade asphalts having a penetration grade of from about 10-10 to about 200-300.
Claim 7
Dependent Claim 38 words
The material as defined in claim 1 wherein the rubber is unvulcanized, vulcanized or reclaimed rubber selected from the group consisting of natural rubbers, isoprene rubber, butadiene rubber, butadiene-styrene rubber, butyl rubber, ethylene propylene rubber and mixtures thereof.
Claim 8
Dependent Claim 49 words
The material as defined in claim 1 wherein the rubber is selected from the group consisting of ground whole tire rubber, tire rubber buffings, ground rubber innertubes, asphalt soluble rubber, reclaimed rubber and partially devulcanized reclaimed rubber prepared from whole tire rubber, tire rubber buffings and ground rubber innertube.
Claim 9
Dependent Claim 22 words
The material as defined in claim 1 wherein the particulate rubber has a mesh size of from about -#16 to about +#25.
Claim 10
Dependent Claim 36 words
The material as defined in claim 1 wherein the rubber is selected from the group consisting of reclaimed rubber and partially devulcanized reclaimed rubber prepared from whole tire rubber, tire rubber buffings and ground rubber innertubes.
Claim 11
Dependent Claim 25 words
The material as defined in claim 9 wherein the asphalt is paving grade asphalt having a penetration grade of from about 10-10 to about 200-300.
Claim 12
Independent Claim 115 words
A method of sealing joints and cracks in structures which comprises the steps of: a. preparing a hot elastomeric material consisting essentially of paving grade asphalt and non-oil resistant asphalt-soluble rubber by heating paving grade asphalt to a temperature of from about 300° F to about 500° F to form hot liquid asphalt, and mixing from about one part to about five parts by weight of the hot asphalt with about one part by weight of particulate non-oil resistant asphalt-soluble rubber to form a jellied composition; b. injecting the hot elastomeric material into the crevice of a joint or crack to seal and fill the same; and c. allowing the injected elastomeric material to cool.
Claim 13
Independent Claim 115 words
A method of sealing joints and cracks in structures which comprises the steps of: a. preparing a hot elastomeric material consisting essentially of paving grade asphalt and non-oil resistant asphalt-soluble rubber by heating paving grade asphalt to a temperature of from about 300° F to about 500° F to form hot liquid asphalt, and mixing from about one part to about five parts by weight of the hot asphalt with about one part by weight of particulate non-oil resistant asphalt-soluble rubber to form a jellied composition; b. injecting the hot elastomeric material into the crevice of a joint or crack to seal and fill the same; and c. allowing the injected elastomeric material to cool.
Claim 14
Dependent Claim 30 words
The method as defined in claim 11 including the additional step of dressing the exposed surface of the injected material with aggregate chips or sand before the injected material cools.
Claim 15
Dependent Claim 31 words
The method as defined in claim 11 including the step of dressing the exposed surface of the injected material with a plastic, rubber or felt sheet before the injected material cools.
Claim 16
Dependent Claim 24 words
The method as defined in claim 11 including the additional step of cleaning the crevice before injecting the hot elastomeric material into the crevice.
Claim 17
Dependent Claim 29 words
The method as defined in claim 11 including the additional step of routing or chiseling the surfaces of the crevice before injecting the hot elastomeric material into the crevice.
Claim 18
Dependent Claim 24 words
The method according to claim 11 wherein the asphalt is paving grade asphalt having a penetration grade of from about 10-10 to about 200-300.
Claim 19
Dependent Claim 23 words
The method according to claim 11 where the asphalt is heated to a temperature of from about 350° F to about 425° F.
Claim 20
Dependent Claim 20 words
The method according to claim 11 wherein the mesh size of the particulate rubber is about -#4 to about +#200.
Claim 21
Dependent Claim 37 words
The method according to claim 11 wherein the rubber is unvulcanized, vulcanized or reclaimed rubber selected from the group consisting of natural rubbers, isoprene rubber, butadiene rubber, butadiene-styrene rubber, butyl rubber, ethylene propylene rubber and mixtures thereof.
Claim 22
Dependent Claim 48 words
The method according to claim 11 wherein the rubber is selected from the group consisting of ground whole tire rubber, tire rubber buffings, ground rubber innertubes, asphalt soluble rubber, reclaimed rubber and partially devulcanized reclaimed rubber prepared from whole tire rubber, tire rubber buffings and ground rubber innertubes.
Claim 23
Dependent Claim 31 words
The method as defined in claim 11 including the step of dressing the exposed surface of the injected material with a plastic, rubber or felt film before the injected material cools.
Claim 24
Dependent Claim 27 words
The method as defined in claim 11 including the additional step of chiseling the surfaces of the crevice before injecting the hot elastomeric material into the crevice.

References Cited (Backward Citations)

US2408297A Cited
US2728734A Cited
US2690418A Cited
US2688005A Cited
US2802798A Cited
US3891585A Cited
US3891585B1 Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-01-16 1981-07-18 1982-01-17 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-01-16 1985-07-18 1986-01-17 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-01-16 1989-07-18 1990-01-17 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags