Roadway barrier structure and method of making

Assignee: Phillips Petroleum Co
•
Filing: 1976-07-16
•
Granted: 1978-01-17
•
Expires: 1996-07-16
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A roadway barrier structure is prepared by laying a porous fabric upon a base course, bonding a barrier structure upon a portion of the porous fabric that rests upon the base course, and placing at least a portion of a traffic-bearing course upon a portion of the porous fabric that rests upon the base course and extends beyond the barrier structure.

Inventors

  • 👤 Duane W. Gagle
  • 👤 Homer L. Draper

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-07 12:56
CPC Classifications
E; E01; E01C; E01C11/00; E01C11/22; E01C11/221; E01C11/222

Claims Analysis

Total Claims: 27
Claim 1
Independent Claim 74 words
A roadway structure comprising a base course, a porous fabric at least a portion of which rests upon said base course, a traffic-bearing course resting upon at least a portion of the portion of said porous fabric which rests upon said base course, a barrier structure resting upon and bonded to at least a portion of the portion of said porous fabric which rests upon said base course and extends beyond said traffic-bearing course.
Claim 2
Dependent Claim 74 words
A roadway structure comprising a base course, a porous fabric at least a portion of which rests upon said base course, a traffic-bearing course resting upon at least a portion of the portion of said porous fabric which rests upon said base course, a barrier structure resting upon and bonded to at least a portion of the portion of said porous fabric which rests upon said base course and extends beyond said traffic-bearing course.
Claim 3
Dependent Claim 16 words
A roadway structure according to claim 1 wherein said barrier structure is comprised of asphaltic concrete.
Claim 4
Dependent Claim 40 words
A roadway structure according to claim 2 wherein at least a portion of the porous fabric upon which said barrier structure rests contains absorbed in its upper surface at least a portion of the asphaltic material of the barrier structure.
Claim 5
Dependent Claim 28 words
A roadway structure according to claim 3 wherein at least a portion of the porous fabric that rests upon the base course is bonded to said base course.
Claim 6
Dependent Claim 48 words
A roadway structure according to claim 4 wherein the portion of the porous fabric that is bonded to the base course is bonded by an area of asphalt adhesive on the base course that impregnates at least a portion of the porous fabric resting upon said base course.
Claim 7
Dependent Claim 22 words
A roadway structure according to claim 2 wherein at least a portion of said porous fabric is wrapped around said barrier structure.
Claim 8
Dependent Claim 25 words
A roadway structure according to claim 6 wherein the portion of said porous fabric that is wrapped around said barrier structure is impregnated with asphalt.
Claim 9
Dependent Claim 27 words
A roadway structure according to claim 2 wherein portions of said traffic-bearing course and said barrier structure that rest upon said porous fabric are in abutting relationship.
Claim 10
Dependent Claim 33 words
A roadway structure according to claim 2 wherein at least a portion of said traffic bearing course rests upon a portion of said base course where no porous fabric overlies said base course.
Claim 11
Dependent Claim 42 words
A roadway structure according to claim 1 wherein said barrier structure is bonded to said porous fabric by a layer of asphalt adhesive which impregnates at least a portion of the top surface of the porous fabric and contacts said barrier structure.
Claim 12
Dependent Claim 53 words
A roadway structure according to claim 10 wherein at least a portion of the porous fabric that rests upon the base course is bonded to said base course by a layer of asphalt adhesive which impregnates at least a portion of the bottom surface of the porous fabric and contacts the base course.
Claim 13
Dependent Claim 51 words
A roadway structure according to claim 11 wherein at least a portion of the porous fabric underlying the traffic-bearing course is bonded to the traffic-bearing course by a layer of asphalt adhesive which impregnates at least a portion of the top surface of the porous fabric and contacts the traffic-bearing course.
Claim 14
Dependent Claim 27 words
A roadway structure according to claim 12 wherein the porous fabric comprises a single sheet which is overlapped to completely envelop the barrier structure along its length.
Claim 15
Dependent Claim 22 words
A roadway structure according to claim 13 wherein a portion of the traffic-bearing course overlies a portion of the overlapped porous fabric.
Claim 16
Independent Claim 65 words
A method for preparing an asphaltic barrier upon a roadway comprising laying a porous fabric upon a base course, bonding a barrier structure upon a portion of the porous fabric that rests upon the base course, and placing at least a portion of a traffic-bearing course upon a portion of the porous fabric that rests upon the base course and extends beyond the barrier structure.
Claim 17
Independent Claim 65 words
A method for preparing an asphaltic barrier upon a roadway comprising laying a porous fabric upon a base course, bonding a barrier structure upon a portion of the porous fabric that rests upon the base course, and placing at least a portion of a traffic-bearing course upon a portion of the porous fabric that rests upon the base course and extends beyond the barrier structure.
Claim 18
Dependent Claim 48 words
A method according to claim 15 wherein said barrier structure is comprised of asphaltic concrete and said barrier structure is bonded to said porous fabric by being applied to said porous fabric in a flowable state which allows the porous fabric to absorb some of the asphaltic material.
Claim 19
Dependent Claim 51 words
A method according to claim 16 wherein prior to the laying of the porous fabric on the base course, an adhesive is applied to said base course so that at least a portion of the porous fabric that will rest upon the base course will be bonded to said base course.
Claim 20
Dependent Claim 43 words
A method according to claim 17 wherein said adhesive is applied to said base course over an area of such size that said porous fabric will be bonded to said base course wherever said porous fabric is to rest upon said base course.
Claim 21
Dependent Claim 24 words
A method according to claim 18 wherein all of said barrier structure is placed upon said porous fabric which rests upon said base course.
Claim 22
Dependent Claim 36 words
A method according to claim 19 wherein said traffic-bearing course is placed so that it extends to rest upon at least a portion of said base course that does not have said porous fabric resting thereon.
Claim 23
Dependent Claim 20 words
A method according to claim 20 wherein said barrier structure and said traffic-bearing course are placed so that they abut.
Claim 24
Dependent Claim 34 words
A method according to claim 16 wherein a portion of said fabric extending beyond said barrier course is folded over so that it covers at least part of one side of said barrier structure.
Claim 25
Dependent Claim 51 words
A method according to claim 15 wherein prior to the laying of the porous fabric on the base course, an adhesive is applied to said base course so that at least a portion of the porous fabric that will rest upon the base course will be bonded to said base course.
Claim 26
Dependent Claim 20 words
A method according to claim 15 wherein said barrier structure and said traffic-bearing course are placed so that they abut.
Claim 27
Dependent Claim 26 words
A roadway structure according to claim 1 wherein the upper surface of said barrier structure is higher than the upper surface of the traffic bearing course.

References Cited (Backward Citations)

US1473134A Cited
US993244A Cited
US2333287A Cited
US2737092A Cited
US3474625A Cited
US3608444A Cited
US3625119A Cited
US3680319A Cited
US3698290A Cited
US3957383A Cited
US3910710A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-01-16 1981-07-18 1982-01-17 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-01-16 1985-07-18 1986-01-17 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-01-16 1989-07-18 1990-01-17 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag