Abstract

Abstract Uniform spherical fuel and/or fertile particles are formed by conversion of an oscillating liquid stream of a uranium and/or thorium compound solution flowing from at least one nozzle in an amount of more than 3,000 drops per minute by allowing these drops to fall into an ammonia solution and subsequently drying and sintering the particles thus formed. Before immersion in the ammonia solution the drops are first allowed to pass through a falling zone free of ammonia, this zone is so regulated that the drops have taken on their exact spherical form and then the drops are passed through a second falling zone containing flowing ammonia gas, whereby the ammonia gas is introduced into this second falling zone through at least one inlet conduit in such manner that there is guaranteed not only an ammonia gas flow in the opposite direction to that of the falling drops but also a horizontal cross current of the ammonia gas through the space between the drops and this second falling zone is so regulated that the spherical drops are sufficiently hardened before immersion in the ammonia solution.

Inventors

  • 👤 Hans Huschka
  • 👤 Martin Kadner

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-02 14:49
CPC Classifications
B; B01; B01J; B01J2/00; B01J2/02; B01J2/06; B01J2/08; C; C04; C04B; C04B35/00; C04B35/51

Claims Analysis

Total Claims: 8
Claim 1
Independent Claim 217 words
A process of forming uniform spherical particles of fuel particles, fertile particles or a mixture of fuel and fertile particles comprising flowing an oscillating liquid stream comprising a solution of a uranium compound, a thorium compund or a mixture of a uranium compound and a thorium compound from at least one nozzle at a rate of at least 3,000 drops per minute, determining the boundary between a first falling zone free of ammonia and a second falling zone containing ammonia by stroboscopically measuring the roundness of the drops, passing the drops through said first falling zone free of ammonia, regulating the length of the first falling zone so that the drops have just taken on an exact spherical form, then passing the drops through a second falling zone containing ammonia flowing both countercurrently to the falling drops and also horizontally cross currently to the drops in an amount guaranteeing that the space between the drops is filled with ammonia, the length of said second falling zone being 150 to 300 mm and being so regulated that the spherical drops are sufficiently hardened before immersion in an ammonia solution directly below said second zone that they are not deformed by contact with said solution and then passing said hardened drops from said second zone into said ammonia solution.
Claim 2
Dependent Claim 217 words
A process of forming uniform spherical particles of fuel particles, fertile particles or a mixture of fuel and fertile particles comprising flowing an oscillating liquid stream comprising a solution of a uranium compound, a thorium compund or a mixture of a uranium compound and a thorium compound from at least one nozzle at a rate of at least 3,000 drops per minute, determining the boundary between a first falling zone free of ammonia and a second falling zone containing ammonia by stroboscopically measuring the roundness of the drops, passing the drops through said first falling zone free of ammonia, regulating the length of the first falling zone so that the drops have just taken on an exact spherical form, then passing the drops through a second falling zone containing ammonia flowing both countercurrently to the falling drops and also horizontally cross currently to the drops in an amount guaranteeing that the space between the drops is filled with ammonia, the length of said second falling zone being 150 to 300 mm and being so regulated that the spherical drops are sufficiently hardened before immersion in an ammonia solution directly below said second zone that they are not deformed by contact with said solution and then passing said hardened drops from said second zone into said ammonia solution.
Claim 3
Dependent Claim 26 words
The process of claim 1 including the steps of removing the hardened drops from the ammonia solution, drying them and heating them sufficiently to sinter them.
Claim 4
Dependent Claim 23 words
The process of claim 1 wherein the ammonia gas is introduced into said second zone at a point near the lower end thereof.
Claim 5
Dependent Claim 22 words
The process of claim 1 wherein the drops are flowed at a rate of 3,000 to 72,000 drops per minute per nozzle.
Claim 6
Dependent Claim 55 words
The process of claim 1 wherein the drops have a diameter between 0.5 and 2.5 mm and the flow of the ammonia gas stream counter to the direction of fall of the drops is at a flow velocity of 0.05 to 2 cm/min per cm 2 of newly formed drop surface per minute per nozzle.
Claim 7
Dependent Claim 37 words
The process of claim 1 wherein the ratio of velocity of ammonia gas in the ammonia gas inlet tube to the ratio of velocity of ammonia gas in the second falling zone is from 100:1 to 200:1.
Claim 8
Dependent Claim 18 words
The process of claim 1 wherein the length of the first falling zone is 50 to 150 mm.

References Cited (Backward Citations)

US3275744A Cited
FR2135598B1 Cited
FR2143394A1 Cited
US3886086A Cited
US3933679A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1980-11-28 1981-05-30 1981-11-29 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1984-11-28 1985-05-30 1985-11-29 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1988-11-28 1989-05-30 1989-11-29 $7700.00 Window Closed / Lapsed