US4056434A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Liquid metal cooled nuclear reactor scanning apparatus
Assignee: United Kingdom Atomic Energy Authority
•
Filing: 1975-11-13
•
Granted: 1977-11-01
•
Expires: 1995-11-13
Abstract
Abstract A liquid metal cooled nuclear reactor has scanning means whereby ultra sound is transmitted between a transducer unit and objects in the pool of reactor coolant by way of a liquid wave guide. The wave guide is created by drawing liquid metal from the pool of coolant into a dip pipe to submerge the transducer unit. The liquid metal is drawn up in two stages with a cooling period between the stages.
Inventors
- 👤 Sidney Barnes
- 👤 John Roderick Fothergill
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-29 12:47
CPC Classifications
G; G21; G21C; G21C17/00; G21C17/08; G21C17/02; Y; Y02; Y02E; Y02E30/00; Y02E30/30
Claims Analysis
Total Claims: 6
Claim 1
Independent Claim
148 words
A liquid metal cooled nuclear reactor construction comprising: a vault containing a pool of liquid metal coolant; a vertical dip tube extending into the pool of coolant; a transducer unit for generating ultra-sound signals housed within the dip tube and disposed above the pool of coolant; a vacuum source connectable to an upper closed end of the dip tube for drawing a column of liquid metal from the pool into the dip tube; first and second vacuum reservoirs connected in series between the dip tube and the vacuum source; fluid flow isolating valves disposed one each between the dip tube and the first vacuum reservoir, between the first and second vacuum reservoirs and between the second vacuum reservoir and the vacuum source; and means for cooling the upper region of the column of liquid metal between two lifting stages and before submersion of the transducer in liquid metal.
Claim 2
Dependent Claim
148 words
A liquid metal cooled nuclear reactor construction comprising: a vault containing a pool of liquid metal coolant; a vertical dip tube extending into the pool of coolant; a transducer unit for generating ultra-sound signals housed within the dip tube and disposed above the pool of coolant; a vacuum source connectable to an upper closed end of the dip tube for drawing a column of liquid metal from the pool into the dip tube; first and second vacuum reservoirs connected in series between the dip tube and the vacuum source; fluid flow isolating valves disposed one each between the dip tube and the first vacuum reservoir, between the first and second vacuum reservoirs and between the second vacuum reservoir and the vacuum source; and means for cooling the upper region of the column of liquid metal between two lifting stages and before submersion of the transducer in liquid metal.
Claim 3
Dependent Claim
40 words
A liquid metal cooled nuclear reactor construction according to claim 1 wherein the means for cooling the upper region of the column of liquid metal comprises fluid conducting heat exchange coils wound about an intermediate region of the dip tube.
Claim 4
Dependent Claim
39 words
A liquid metal cooled nuclear reactor construction according to claim 1 wherein there is a mirror pivotably mounted about a horizontal axis at the lower end of the dip tube and disposed for deflecting the path of the signals.
Claim 5
Dependent Claim
39 words
A liquid metal cooled nuclear reactor construction according to claim 3 wherein there is gear drive means for rotating the dip tube about its longitudinal axis and screw thread means for displacing the dip tube along its longitudinal axis.
Claim 6
Dependent Claim
20 words
A liquid metal cooled nuclear reactor construction according to claim 4 wherein the dip tube has a gas filled jacket.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1980-10-31 | 1981-05-02 | 1981-11-01 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1984-10-31 | 1985-05-02 | 1985-11-01 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1988-10-31 | 1989-05-02 | 1989-11-01 | $7700.00 | Window Closed / Lapsed |