US4054210A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Apparatus for transporting and handling pipe
Assignee: Individual
•
Filing: 1975-09-29
•
Granted: 1977-10-18
•
Expires: 1995-09-29
Abstract
Abstract Pipe handling apparatus for transporting pipe in a pipe carrier between a pipe rack and a derrick floor wherein the pipe carrier is supported by a first cable and is manipulated between the pipe rack and the derrick floor by a second cable which is operably connected to a lateral displacement means mounted with the pipe carrier for lateral displacement of the pipe carrier and the pipe therein as the pipe carrier nears the derrick floor thereby to position the pipe for unloading at the derrick floor without detrimental contact of the pipe with any object to accomplish such lateral displacement.
Inventors
- 👤 Roger A. Crocker
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-05 09:48
CPC Classifications
E; E21; E21B; E21B19/00; E21B19/14; E21B19/15; E21B19/155
Claims Analysis
Total Claims: 11
Claim 1
Independent Claim
157 words
An apparatus for transporting pipe from a pipe rack to a derrick platform, and for transporting pipe from the derrick platform to a pipe rack, comprising: a. a first upright member; b. a second upright member spaced longitudinally apart from said first upright member; c. a first cable extending between said first and second upright member and normally disposed in a longitudinal substantially straight line between said upright members; d. support means mounted on said first cable for movement longitudinally along said first cable; e. a pipe carrier supported by said support means for transporting pipe therein; f. a second cable coacting with said carrier for moving said pipe carrier longitudinally relative to said first cable; and g. lateral displacement means coacting with said second cable for laterally displacing said pipe carrier relative to said longitudinally substantially straight line between said upright members as said pipe carrier approaches the area in proximity to said first upright member.
Claim 2
Independent Claim
157 words
An apparatus for transporting pipe from a pipe rack to a derrick platform, and for transporting pipe from the derrick platform to a pipe rack, comprising: a. a first upright member; b. a second upright member spaced longitudinally apart from said first upright member; c. a first cable extending between said first and second upright member and normally disposed in a longitudinal substantially straight line between said upright members; d. support means mounted on said first cable for movement longitudinally along said first cable; e. a pipe carrier supported by said support means for transporting pipe therein; f. a second cable coacting with said carrier for moving said pipe carrier longitudinally relative to said first cable; and g. lateral displacement means coacting with said second cable for laterally displacing said pipe carrier relative to said longitudinally substantially straight line between said upright members as said pipe carrier approaches the area in proximity to said first upright member.
Claim 3
Dependent Claim
16 words
The structure of claim 1, wherein: said lateral displacement means is mounted on said pipe carrier.
Claim 4
Dependent Claim
25 words
The structure of claim 2, wherein said lateral displacement means comprises: a. a projecting member extending laterally from the longitudinal axis of said pipe carrier.
Claim 5
Dependent Claim
24 words
The structure of claim 3, wherein: said projecting member includes an end spaced laterally from said pipe carrier for mounting with said second cable.
Claim 6
Dependent Claim
114 words
The structure of claim 4, further including: a. a pulley mounted adjacent said first upright member; b. power means for pulling said second cable to move said pipe carrier in a direction towards said derrick floor; and c. said second cable extends from said power means into operative engagement with said pulley and to said laterally spaced end of said projecting member, whereby pulling said second cable brings said laterally spaced end of said projecting member into alignment with said first upright member when said pipe carrier approaches the area in proximity to said first upright member and thereby causes said projecting member to displace said pipe carrier laterally from the first upright member.
Claim 7
Dependent Claim
25 words
The structure of claim 5, wherein said lateral displacement means further includes: guide means guiding said second cable in the area about said pipe carrier.
Claim 8
Dependent Claim
102 words
The structure of claim 3, wherein: a. said projecting member has an end portion spaced laterally from said pipe carrier; and b. said lateral displacement means further comprises: 1. an extension member having a first end portion for mounting on said laterally spaced end portion of said projecting member and a second end portion for securing to said second cable, thereby providing a greater distance between said pipe carrier and said second cable mounted with said lateral displacement means, the magnitude of the lateral displacement of said pipe carrier being proportional to the distance between said pipe carrier and said second cable.
Claim 9
Dependent Claim
115 words
The structure of claim 7, further including: a. a pulley mounted with said first upright member; b. power means for pulling said second cable to move said pipe carrier in a direction toward said derrick floor; and c. said second cable extends from said power means into operative engagement with said pulley and to said second end portion of said extension member, whereby pulling said second cable brings said second end portion of said extension member into alignment with said first upright member when said pipe carrier approaches the area in proximity to said first upright member and thereby causes said lateral displacement means to displace said pipe carrier laterally from the first upright member.
Claim 10
Dependent Claim
87 words
The structure of claim 2, wherein said lateral displacement means comprises: a. first lateral displacement means positioned near one end of said pipe carrier and providing a first loading and unloading orientation when used; and b. second lateral displacement means positioned near a second end of said pipe carrier for alternately providing a second loading and unloading orientation when said pipe carrier is used in a reversed position; and c. said second cable is connected to said first lateral displacement means for laterally displacing said pipe carrier.
Claim 11
Dependent Claim
149 words
The structure of claim 1, further including apparatus for transferring a pipe from the pipe rack to said pipe carrier, said transferring apparatus comprising: a. support base means for supporting said pipe carrier during transfer of the pipe from the pipe rack to the pipe carrier; b. arm means having a curved end for engaging the pipe; c. means mounting said arm means for pivotal movement from a first position wherein said curved end of said arm means is lower than the pipe when the pipe is on the pipe rack to a second position wherein said curved end of said arm means is at a higher elevation than said base support means; d. means for pivotally rotating said arm means from the first position to the second position for transferring the pipe from the pipe rack into the pipe carrier by such pivotal movement of said arm means.
References Cited (Backward Citations)
CA644775A
Cited
US2751781A
Cited
US3700116A
Cited
US3825129A
Cited
US3655067A
Cited
US3774780A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1980-10-17 | 1981-04-18 | 1981-10-18 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1984-10-17 | 1985-04-18 | 1985-10-18 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1988-10-17 | 1989-04-18 | 1989-10-18 | $7700.00 | Window Closed / Lapsed |