Claims Analysis
Total Claims: 13
Claim 1
Independent Claim
77 words
In a sewage station having circular means for receiving sewage and pumping means powered for discharging sewage from the receiving means, the improvement comprising: the means for receiving including structure defining: a drywell, a plurality of wells in annular array around the drywell, means for power-free distribution of sewage in predeterminable sequence among portions of the plurality of wells, and means for selectively delivering sewage to the pumping means from the plurality of wells in predeterminable sequence.
Claim 2
Dependent Claim
77 words
In a sewage station having circular means for receiving sewage and pumping means powered for discharging sewage from the receiving means, the improvement comprising: the means for receiving including structure defining: a drywell, a plurality of wells in annular array around the drywell, means for power-free distribution of sewage in predeterminable sequence among portions of the plurality of wells, and means for selectively delivering sewage to the pumping means from the plurality of wells in predeterminable sequence.
Claim 3
Dependent Claim
66 words
In a sewage station as recited in claim 1, said structure defining including: a base, a cylindrical inner wall forming said drywell above the base, a cylindrical outer wall coaxial with said inner wall and forming an annular space therebetween above the base, a plurality of radial walls joining the inner wall and the outer wall for dividing said annular space into said plurality of wells.
Claim 4
Dependent Claim
25 words
In a sewage station as recited in claim 2, overhead structure having access therethrough closing the top of all said drywell and plurality of wells.
Claim 5
Dependent Claim
123 words
In a sewage station as recited in claim 2, the means for power-free distribution including: said plurality of wells comprising at least three wells, a first of said radial walls in the annular space separating a first well from a second well of said plurality of wells, second and third of said radial walls respectively separating a third well from the respective first well and the second well, first means for the first wall at an intermediate level in the annular space for directing incoming sewage simultaneously to the first well and to the second well, and means for conducting sewage into the third well when sewage has filled the first well and the second well past the level of the first means.
Claim 6
Dependent Claim
95 words
In a sewage station as recited in claim 4, said pumping means including a plurality of pumps in the drywell, the means for selectively delivering including intake connection through the inner wall from said first and second wells to respective of said plurality of pumps, means for discharging from said plurality of pumps, a drain pipe connecting a lower portion of the third well with at least one of said first and second wells for draining the third well, and a platform for supporting workmen and the like in a space over said distribution chamber.
Claim 7
Dependent Claim
50 words
In a sewage station as recited in claim 5, means in one of said wells for passing sewage outside said sewage station when sewage has substantially filled the space over said platform, thereby employing said space for workmen and the like as last-reserve capacity for sewage in said sewage station.
Claim 8
Dependent Claim
65 words
In a sewage station as recited in claim 6, respective valving means associated with at least one of said plurality of pumps, drain pipe and distribution chamber, control means on the platform for said valving means, means for flushing said drainpipe, and said means for passing sewage outside the sewage station including an opening in the third well adjacent the top of said annular space.
Claim 9
Dependent Claim
54 words
In a sewage station as recited in claim 5, said plurality of pumps including first, second, and third pumps, said intake connection including connection of the first pump with the first well, connection of the second pump with the first and the second wells, and connection of the third pump with the third well.
Claim 10
Dependent Claim
41 words
In a sewage station as recited in claim 8, the first radial wall having a valve connection through the base thereof for selectively communicating between the first well and the second well and isolating the first well and the second well.
Claim 11
Dependent Claim
47 words
In a sewage station as recited in claim 8, means for pump-starting at a first predesignated level of sewage, means for pump-stopping at a second predesignated level of sewage, and means for selecting which of said plurality of pumps is to be used at a particular time.
Claim 12
Dependent Claim
44 words
In a sewage station as recited in claim 6, second means on the first wall below the first means, for routing sewage to the first well, and third means on the first wall below the first means, for routing sewage to the second well.
Claim 13
Dependent Claim
44 words
In a sewage station as recited in claim 11, a shelter-type superstructure over the overhead of the drywell, at least one pump motor in the superstructure, and means operably connecting said at least one pump motor to one of said pumps in the drywell.