Nuclear power installations

Assignee: NUCLEAR POWER Co (WHETSTONE LIMITED)
•
Filing: 1975-12-23
•
Granted: 1977-09-13
•
Expires: 1995-12-23
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In a nuclear-reactor power-generating installation having a main and an auxiliary steam-generating boiler, both arranged to receive heat from the reactor core (for example by circulation of reactor coolant gas), and having a turbogenerator which includes a multistage steam turbine through whose stages the steam from the main boiler passes in sequence, there being a steam reheater unit connected between two of the stages to provide reheating of the steam from the main boiler, the invention provides that the auxiliary boiler is connected to supply to the reheater unit steam which reheats the said steam from the main boiler.

Inventors

  • 👤 Brian Victor George
  • 👤 Colin James Drayrer

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 20:51
CPC Classifications
F; F01; F01K; F01K7/00; F01K7/16; F01K7/22; G; G21; G21D; G21D1/00; G21D1/04; G21D5/00; G21D5/04; G21D5/08; Y; Y02; Y02E; Y02E30/00; Y02E30/30

Claims Analysis

Total Claims: 6
Claim 1
Independent Claim 160 words
A gas-cooled nuclear-reactor power-generating installation having A. a nuclear reactor core, B. a main stream-generating boiler, C. an auxiliary steam-generating boiler, independent of said main boiler and distinct therefrom, D. a main coolant-gas circulator arranged to circulate coolant gas through the core and through the main boiler, independently of the auxiliary boiler, whereby to generate steam in the main boiler, E. an auxiliary coolant-gas circulator arranged to circulate coolant gas through the core and through the auxiliary boiler, independently of the main boiler, whereby to generate steam in the auxiliary boiler, F. a main turbogenerator which includes a steam turbine having a plurality of turbine stages through which steam from the main boiler passes in sequence, and G. a steam reheater unit connected between two of the turbine stages to reheat the said steam from the main boiler, H. the auxiliary boiler being connected to supply to the reheater unit steam which reheats the said steam from the main boiler.
Claim 2
Dependent Claim 160 words
A gas-cooled nuclear-reactor power-generating installation having A. a nuclear reactor core, B. a main stream-generating boiler, C. an auxiliary steam-generating boiler, independent of said main boiler and distinct therefrom, D. a main coolant-gas circulator arranged to circulate coolant gas through the core and through the main boiler, independently of the auxiliary boiler, whereby to generate steam in the main boiler, E. an auxiliary coolant-gas circulator arranged to circulate coolant gas through the core and through the auxiliary boiler, independently of the main boiler, whereby to generate steam in the auxiliary boiler, F. a main turbogenerator which includes a steam turbine having a plurality of turbine stages through which steam from the main boiler passes in sequence, and G. a steam reheater unit connected between two of the turbine stages to reheat the said steam from the main boiler, H. the auxiliary boiler being connected to supply to the reheater unit steam which reheats the said steam from the main boiler.
Claim 3
Dependent Claim 15 words
An installation as claimed in claim 1, wherein the auxiliary boiler is a once-through boiler.
Claim 4
Dependent Claim 44 words
An installation as claimed in claim 1, wherein the main coolant-gas circulator comprises a steam turbine which is connected to be driven by at least a part of the steam supplied by the auxiliary boiler and to exhaust such steam to the reheater unit.
Claim 5
Dependent Claim 74 words
An installation as claimed in claim 1 and comprising at least one further steam turbine connected to receive a minor part of the steam supplied by the auxiliary boiler (the reheater unit receiving a major part of such steam), the said further steam turbine being arranged to drive one of the group of installation accessories which comprises an auxiliary electrical generator and feed water pumps for the main boiler and for the auxiliary boiler.
Claim 6
Dependent Claim 57 words
An installation as claimed in claim 4, wherein the steam exhausted from the said further steam turbine is mixed with the steam from the main boiler at one of the two points along the path of the steam from the main boiler which points are constituted respectively by an inlet and an outlet of the reheater unit.

References Cited (Backward Citations)

US2968156A Cited
US3180798A Cited
US3247072A Cited
US3175953A Cited
US3170846A Cited
FR1437467A Cited
US3379616A Cited
US3666628A Cited
US3748229A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1980-09-12 1981-03-14 1981-09-13 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1984-09-12 1985-03-14 1985-09-13 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1988-09-12 1989-03-14 1989-09-13 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags