← Back to Patent Explorer
US4047256A Expired / Lapsed US ⏱️ 0.0 years remaining

Bridge construction method

Assignee: Individual
•
Filing: 1976-11-11
•
Granted: 1977-09-13
•
Expires: 1996-11-11
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A bridge construction method comprising removing the trucks and wheels from a flatbed type railroad car to provide a bridge substructure, preparing support means upstanding from an area to be bridged for emplacement of the substructure, and emplacing the substructure on the support means over the area.

Inventors

  • 👤 Bernard Hasara

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-02 22:39
CPC Classifications
E; E01; E01D; E01D2/00; E01D2101/00; E01D2101/30

Claims Analysis

Total Claims: 18
Claim 1
Independent Claim 47 words
A bridge construction method comprising: removing the trucks and wheels from a flatbed type railroad car to provide a bridge substructure, preparing support means upstanding from an area to be bridged for emplacement of said substructure, and emplacing said substructure on said support means over said area.
Claim 2
Dependent Claim 47 words
A bridge construction method comprising: removing the trucks and wheels from a flatbed type railroad car to provide a bridge substructure, preparing support means upstanding from an area to be bridged for emplacement of said substructure, and emplacing said substructure on said support means over said area.
Claim 3
Dependent Claim 33 words
The method of claim 1 comprising preparing two such support means on opposite sides of said area and employing said substructure with each end disposed on a respective one of said support means.
Claim 4
Dependent Claim 22 words
The method of claim 1 wherein said preparation of said two support means comprises forming pillars on opposite sides of said area.
Claim 5
Dependent Claim 24 words
The method of claim 3 wherein said area is a depression and said pillars are positioned within embankments on opposite sides of said depression.
Claim 6
Dependent Claim 14 words
The method of claim 1 comprising emplacing a bridge deck structure on said substructure.
Claim 7
Dependent Claim 24 words
The method of claim 5 wherein said emplacement of said bridge deck structure is preceded by removing a car deck structure from said car.
Claim 8
Dependent Claim 21 words
The method of claim 5 wherein said emplacement of said bridge deck structure comprises overlying said substructure with metal plate means.
Claim 9
Dependent Claim 24 words
The method of claim 7 wherein said emplacement of said bridge deck structure further comprises pouring road construction material over said metal plate means.
Claim 10
Dependent Claim 24 words
The method of claim 5 wherein said bridge deck structure is emplaced so as to extend laterally beyond the side edges of said substructure.
Claim 11
Dependent Claim 22 words
The method of claim 9 comprising securing bracing members between said substructure and the laterally extending part of said bridge deck structure.
Claim 12
Dependent Claim 31 words
The method of claim 5 comprising emplacing two such substructure on said support means laterally adjacent each other and emplacing said bridge deck structure to extend across both of said substructures.
Claim 13
Dependent Claim 27 words
The method of claim 11 comprising laterally spacing said substructures from each other and emplacing said bridge deck structure to extend across the space between said substructures.
Claim 14
Dependent Claim 24 words
The method of claim 12 comprising securing bracing members between said substructures and the part of said bridge deck structure extending across said space.
Claim 15
Dependent Claim 32 words
The method of claim 13 including securing first ones of said bracing members between said substructures and securing second ones of said bracing members between said substructures and said first bracing members.
Claim 16
Dependent Claim 21 words
The method of claim 5 including the further step of securing guard rails along the sides of said bridge deck structure.
Claim 17
Dependent Claim 18 words
The method of claim 1 comprising emplacing two such substructures on said support means longitudinally adjacent each other.
Claim 18
Dependent Claim 61 words
The method of claim 16 comprising providing two such support means on opposite sides of said area and a third such support means within said area and emplacing each of said substructures with one end on a respective one of said two support means with the other ends of both of said substructures adjacent each other on said third support means.

References Cited (Backward Citations)

US1593999A Cited
US999126A Cited
US1101110A Cited
US2363767A Cited
DE935911C Cited
US2782733A Cited
DE1123356B Cited
US3435909A Cited
US3834111A Cited
US3925840A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1980-09-12 1981-03-14 1981-09-13 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1984-09-12 1985-03-14 1985-09-13 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1988-09-12 1989-03-14 1989-09-13 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag