← Back to Patent Explorer
US4047028A Expired / Lapsed US ⏱️ 0.0 years remaining

Resolution of through tubing fluid flow and behind casing fluid flow in multiple completion wells

Assignee: Texaco Inc
•
Filing: 1975-11-03
•
Granted: 1977-09-06
•
Expires: 1995-11-03
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method is provided for resolving undesired fluid flow in cement channels behind casing in one producing zone of a multi zone completion well operating on gas lift from the fluid flow from lower producing zones in the same well which is contained in production tubing passing through the producing zone being investigated. Gamma rays which are characteristic of the decay of the unstable isotope nitrogen 16 produced by activation of elemental oxygen nuclei comprising the molecular structure of both the tubing fluid flow and the undesired fluid flow are detected in at least two energy bonds at two longitudinally spaced detectors in a well borehole. By appropriately combining the four count rate signals so producing according to predetermined relationships the two fluid flow components in the same direction may be uniquely distinguished on the basis of their differing distances from the gamma ray detectors.

Inventors

  • 👤 Dan M. Arnold

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 05:58
CPC Classifications
E; E21; E21B; E21B47/00; E21B47/10; E21B47/11; E21B47/111; G; G01; G01F; G01F1/00; G01F1/704; G01F1/7042; G01V; G01V5/00; G01V5/04; G01V5/08; G01V5/10; G01V5/101

Claims Analysis

Total Claims: 10
Claim 1
Independent Claim 333 words
A method for detecting the direction, linear flow rate and volume flow rate of undesired behind casing water migration in an upper producing zone of a multiple completion well operating on gas lift, wherein the upper completion zone has a production tubing string of known diameter passing therethrough from a lower completion zone which contains water cut fluid flowing at a substantially known volume flow rate in an upward direction, substantially without interrupting production from either of the completion zones, comprising the steps of: (a) locating a well tool sized and adapted for passage through production tubing and having a source of fast neutrons at least some of which having sufficient energy to cause the nuclear reaction O 16 (n,p) N 16 and at least two gamma ray detectors longitudinally spaced from said source and each other, in an upper producing zone of the well at a location adjacent either above or below producing perforations to be investigated; (b) irradiating the borehole environs with fast neutrons from said source; (c) detecting at said detector locations in at least two separate energy regions of the gamma ray energy spectrum, gamma rays substantially caused by the decay of the unstable isotope N 16 comprising the molecular structure of any undesired behind casing water migration and any water cut flowing in the production tubing from the lower producing zone, and generating at least four separate count signals representative thereof; (d) combining said at least four separate count signals according to a first predetermined relationship to derive an indication of the linear flow rate of any undesired water flow behind the casing in the upper producing zone; and (e) combining the known volume flow rate and linear flow rate of the water cut in the production tubing from the lower producing zone and said at least four count signals according to a second predetermined relationship to derive an indication of the volume flow rate of the undesired water flow behind the casing in the upper producing zone.
Claim 2
Independent Claim 333 words
A method for detecting the direction, linear flow rate and volume flow rate of undesired behind casing water migration in an upper producing zone of a multiple completion well operating on gas lift, wherein the upper completion zone has a production tubing string of known diameter passing therethrough from a lower completion zone which contains water cut fluid flowing at a substantially known volume flow rate in an upward direction, substantially without interrupting production from either of the completion zones, comprising the steps of: (a) locating a well tool sized and adapted for passage through production tubing and having a source of fast neutrons at least some of which having sufficient energy to cause the nuclear reaction O 16 (n,p) N 16 and at least two gamma ray detectors longitudinally spaced from said source and each other, in an upper producing zone of the well at a location adjacent either above or below producing perforations to be investigated; (b) irradiating the borehole environs with fast neutrons from said source; (c) detecting at said detector locations in at least two separate energy regions of the gamma ray energy spectrum, gamma rays substantially caused by the decay of the unstable isotope N 16 comprising the molecular structure of any undesired behind casing water migration and any water cut flowing in the production tubing from the lower producing zone, and generating at least four separate count signals representative thereof; (d) combining said at least four separate count signals according to a first predetermined relationship to derive an indication of the linear flow rate of any undesired water flow behind the casing in the upper producing zone; and (e) combining the known volume flow rate and linear flow rate of the water cut in the production tubing from the lower producing zone and said at least four count signals according to a second predetermined relationship to derive an indication of the volume flow rate of the undesired water flow behind the casing in the upper producing zone.
Claim 3
Dependent Claim 39 words
The method of claim 1 wherein the step of irradiating the borehole environs with fast neutrons is performed by repetitively irradiating the borehole environs with bursts of fast neutrons from a deuterium-tritium reaction source of approximately 14 MEV neutrons.
Claim 4
Dependent Claim 22 words
The method of claim 2 wherein said detecting step is performed in the time intervals between said repetitive bursts of fast neutrons.
Claim 5
Dependent Claim 47 words
The method of claim 3 wherein said repetitive neutron bursts are of approximately 1 millisecond duration and are repeated approximately 100 times per second and the detecting intervals are commenced approximately 3 milliseconds subsequent to each neutron burst and terminated prior to each next repetitive neutron burst.
Claim 6
Dependent Claim 79 words
The method of claim 1 and further including the steps of: removing said tool from the well subsequent to obtaining measurements at said location adjacent either above of below the producing perforations; reversing the juxtaposition of said source and said detectors; relocating said tool in an opposite adjacent location either below or above the producing perforations in the upper producing zone of the well; and repeating steps (b), (c), (d) and (e) with said tool in the new location.
Claim 7
Dependent Claim 39 words
The method of claim 5 wherein the step of irradiating the borehole environs with fast neutrons is performed by repetitively irradiating the borehole environs with bursts of fast neutrons from a deuterium-tritium reaction source of approximately 14 MEV neutrons.
Claim 8
Dependent Claim 22 words
The method of claim 6 wherein said detecting step is performed in the time intervals between said repetitive bursts of fast neutrons.
Claim 9
Dependent Claim 47 words
The method of claim 7 wherein said repetitive neutron bursts are of approximately 1 millisecond duration and are repeated approximately 100 times per second and the detecting intervals are commenced approximately 3 milliseconds subsequent to each neutron burst and terminated prior to each next repetitive neutron burst.
Claim 10
Dependent Claim 44 words
The method of claim 5 wherein the step of reversing the juxtaposition of said source and said detectors is performed by reversing the juxtaposition of said source and said detectors while maintaining the longitudinal spacing distances from said source to said detectors approximately constant.

References Cited (Backward Citations)

US3075077A Cited
US3603795A Cited
US3930153A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1980-09-05 1981-03-07 1981-09-06 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1984-09-05 1985-03-07 1985-09-06 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1988-09-05 1989-03-07 1989-09-06 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag