Control of feedstock for delayed coking
Assignee: ConocoPhillips Co
•
Filing: 1975-08-25
•
Granted: 1977-08-23
•
Expires: 1995-08-25
Abstract
Abstract Characteristics of the feedstock for a delayed coking operation are determined prior to carrying out the coking operation, and the feedstock is adjusted by blending, thermal cracking, or other processing to provide certain predetermined characteristics to the feedstock prior to conducting the coking operation. Feedstocks having desired predetermined characteristics produce a premium grade coke having very low coefficient of thermal expansion.
Inventors
- 👤 William H. Kegler
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-01 17:25
CPC Classifications
C; C10; C10B; C10B55/00; C10B57/00; C10B57/04; C10B57/045
Claims Analysis
Total Claims: 8
Claim 1
Independent Claim
112 words
In a delayed coking process for producing premium coke wherein a petroleum derived feedstock is charged to a coker furnace, heated to coking temperature, charged to a coking drum and maintained therein at coking conditions until premium coke is formed, the improvement wherein: a. said feedstock has a BMCI value outside the range of 95 to 130; b. a desired BMCI value for the feedstock within the range of 95 to 130 is preselected; c. the BMCI of the feedstock is determined prior to charging same to the coker furnace; and d. the BMCI of the feedstock, prior to charging same to the coker furnace, is adjusted to said preselected desired value.
Claim 2
Dependent Claim
112 words
In a delayed coking process for producing premium coke wherein a petroleum derived feedstock is charged to a coker furnace, heated to coking temperature, charged to a coking drum and maintained therein at coking conditions until premium coke is formed, the improvement wherein: a. said feedstock has a BMCI value outside the range of 95 to 130; b. a desired BMCI value for the feedstock within the range of 95 to 130 is preselected; c. the BMCI of the feedstock is determined prior to charging same to the coker furnace; and d. the BMCI of the feedstock, prior to charging same to the coker furnace, is adjusted to said preselected desired value.
Claim 3
Dependent Claim
100 words
In a delayed coking process for producing premium coke wherein a petroleum derived feedstock is charged to a coker furnace, heated to coking temperature, charged to a coking drum and maintained therein at coking conditions until premium coke is formed, the improvement wherein: a. a desired BMCI value for said feedstock is preselected within the range of 95 to 130; b. the actual BMCI value for said feedstock is determined to be different from said preselected value; and c. the BMCI value of said feedstock, prior to charging same to the coker furnace, is adjusted to said preselected desired value.
Claim 4
Dependent Claim
100 words
In a delayed coking process for producing premium coke wherein a petroleum derived feedstock is charged to a coker furnace, heated to coking temperature, charged to a coking drum and maintained therein at coking conditions until premium coke is formed, the improvement wherein: a. a desired BMCI value for said feedstock is preselected within the range of 95 to 130; b. the actual BMCI value for said feedstock is determined to be different from said preselected value; and c. the BMCI value of said feedstock, prior to charging same to the coker furnace, is adjusted to said preselected desired value.
Claim 5
Dependent Claim
23 words
The process of claim 2 wherein said feedstock, prior to adjustment thereof, has a BMCI value outside the range of 95 to 130.
Claim 6
Dependent Claim
17 words
The process of claim 2 wherein the adjusting of the BMCI of the feedstock is by blending.
Claim 7
Dependent Claim
20 words
The process of claim 2 wherein the adjusting of the BMCI of the feedstock is by thermal cracking the feedstock.
Claim 8
Dependent Claim
22 words
The process of claim 2 wherein the BMCI of the adjusted feedstock is determined prior to charging same to the coker furnace.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1980-08-22 | 1981-02-21 | 1981-08-23 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1984-08-22 | 1985-02-21 | 1985-08-23 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1988-08-22 | 1989-02-21 | 1989-08-23 | $7700.00 | Window Closed / Lapsed |