Control of feedstock for delayed coking

Assignee: ConocoPhillips Co
•
Filing: 1975-08-25
•
Granted: 1977-08-23
•
Expires: 1995-08-25
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Characteristics of the feedstock for a delayed coking operation are determined prior to carrying out the coking operation, and the feedstock is adjusted by blending, thermal cracking, or other processing to provide certain predetermined characteristics to the feedstock prior to conducting the coking operation. Feedstocks having desired predetermined characteristics produce a premium grade coke having very low coefficient of thermal expansion.

Inventors

  • 👤 William H. Kegler

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 17:25
CPC Classifications
C; C10; C10B; C10B55/00; C10B57/00; C10B57/04; C10B57/045

Claims Analysis

Total Claims: 8
Claim 1
Independent Claim 112 words
In a delayed coking process for producing premium coke wherein a petroleum derived feedstock is charged to a coker furnace, heated to coking temperature, charged to a coking drum and maintained therein at coking conditions until premium coke is formed, the improvement wherein: a. said feedstock has a BMCI value outside the range of 95 to 130; b. a desired BMCI value for the feedstock within the range of 95 to 130 is preselected; c. the BMCI of the feedstock is determined prior to charging same to the coker furnace; and d. the BMCI of the feedstock, prior to charging same to the coker furnace, is adjusted to said preselected desired value.
Claim 2
Dependent Claim 112 words
In a delayed coking process for producing premium coke wherein a petroleum derived feedstock is charged to a coker furnace, heated to coking temperature, charged to a coking drum and maintained therein at coking conditions until premium coke is formed, the improvement wherein: a. said feedstock has a BMCI value outside the range of 95 to 130; b. a desired BMCI value for the feedstock within the range of 95 to 130 is preselected; c. the BMCI of the feedstock is determined prior to charging same to the coker furnace; and d. the BMCI of the feedstock, prior to charging same to the coker furnace, is adjusted to said preselected desired value.
Claim 3
Dependent Claim 100 words
In a delayed coking process for producing premium coke wherein a petroleum derived feedstock is charged to a coker furnace, heated to coking temperature, charged to a coking drum and maintained therein at coking conditions until premium coke is formed, the improvement wherein: a. a desired BMCI value for said feedstock is preselected within the range of 95 to 130; b. the actual BMCI value for said feedstock is determined to be different from said preselected value; and c. the BMCI value of said feedstock, prior to charging same to the coker furnace, is adjusted to said preselected desired value.
Claim 4
Dependent Claim 100 words
In a delayed coking process for producing premium coke wherein a petroleum derived feedstock is charged to a coker furnace, heated to coking temperature, charged to a coking drum and maintained therein at coking conditions until premium coke is formed, the improvement wherein: a. a desired BMCI value for said feedstock is preselected within the range of 95 to 130; b. the actual BMCI value for said feedstock is determined to be different from said preselected value; and c. the BMCI value of said feedstock, prior to charging same to the coker furnace, is adjusted to said preselected desired value.
Claim 5
Dependent Claim 23 words
The process of claim 2 wherein said feedstock, prior to adjustment thereof, has a BMCI value outside the range of 95 to 130.
Claim 6
Dependent Claim 17 words
The process of claim 2 wherein the adjusting of the BMCI of the feedstock is by blending.
Claim 7
Dependent Claim 20 words
The process of claim 2 wherein the adjusting of the BMCI of the feedstock is by thermal cracking the feedstock.
Claim 8
Dependent Claim 22 words
The process of claim 2 wherein the BMCI of the adjusted feedstock is determined prior to charging same to the coker furnace.

References Cited (Backward Citations)

US2922755A Cited
US3451921A Cited
US3412009A Cited
US3547804A Cited
US3759822A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1980-08-22 1981-02-21 1981-08-23 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1984-08-22 1985-02-21 1985-08-23 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1988-08-22 1989-02-21 1989-08-23 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag