Patent US1905333A successfully refreshed from Google Patents.
Patent US2771587A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4041671A Expired / Lapsed US ⏱️ 0.0 years remaining

Construction method

Assignee: Individual
•
Filing: 1976-03-01
•
Granted: 1977-08-16
•
Expires: 1996-03-01
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method of building homes and the like which provides relatively low cost structures of unique esthetic appearance and requiring little maintenance. The method utilizes inflatable balloons on which substantially rigid, thin shells are formed utilizing reinforced and relatively fast curing materials. The present invention contemplates the fabrication of multiple interconnected shells to provide an integrated construction form. Once this rigid construction form is provided, door and window cutouts may be made and molds and/or frames such as window molds and/or frames fastened in place so that relatively thick structural and insulating materials may be placed over the shells to provide the structural integrity of the building when cured.

Inventors

  • 👤 William I. Nicholson

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-05 19:01
CPC Classifications
E; E04; E04B; E04B1/00; E04B1/16; E04B1/166

Claims Analysis

Total Claims: 43
Claim 1
Independent Claim 151 words
A method of forming building structures comprising: a. providing a foundation; b. placing a balloon having a shape substantially similar to part of the building to be formed over part of the foundation and inflating the balloon; c. providing a layer of material on the balloon to form a substantially rigid construction form shell; d. placing a balloon having a shape substantially similar to another part of the building to be formed over part of the foundation so that the base of the balloon is intersected by the shell formed in step (c); e. providing a layer of material on the balloon of step (d) to form a substantially rigid construction form shell intersected by the shell formed in step (c) to form one integral shell; and f. providing at least one layer of material over the construction form shell, which when cured, will provide the structural shell of the building.
Claim 2
Independent Claim 151 words
A method of forming building structures comprising: a. providing a foundation; b. placing a balloon having a shape substantially similar to part of the building to be formed over part of the foundation and inflating the balloon; c. providing a layer of material on the balloon to form a substantially rigid construction form shell; d. placing a balloon having a shape substantially similar to another part of the building to be formed over part of the foundation so that the base of the balloon is intersected by the shell formed in step (c); e. providing a layer of material on the balloon of step (d) to form a substantially rigid construction form shell intersected by the shell formed in step (c) to form one integral shell; and f. providing at least one layer of material over the construction form shell, which when cured, will provide the structural shell of the building.
Claim 3
Dependent Claim 27 words
The method of claim 1 wherein a loose fitting covering is placed over the inflated balloons of steps (b) and (d) before proceeding with the next step.
Claim 4
Dependent Claim 24 words
The method of claim 2 wherein the layers of materials applied in steps (c) and (e) rigidize the loose fitting coverings over the balloons.
Claim 5
Dependent Claim 21 words
The method of claim 1 wherein the integral construction form shell is formed with an average thickness not exceeding 1 inch.
Claim 6
Dependent Claim 20 words
The method of claim 1 wherein the construction form shell is formed with an average thickness not exceeding 1/2 inch.
Claim 7
Dependent Claim 33 words
The method of claim 1 wherein steps (c) and (e) each comprise the steps of providing a layer of resinous material over the balloon having a curing time of less than 1 hour.
Claim 8
Dependent Claim 44 words
The method of claim 1 wherein step (f) comprises the step of providing at least one layer of material over the construction form shell which when cured will provide a structural shell of the building having an average thickness of at least 2 inches.
Claim 9
Dependent Claim 44 words
The method of claim 1 wherein step (f) comprises the step of providing at least one layer of material over the construction form shell which when cured will provide a structural shell of the building having an average thickness of at least 3 inches.
Claim 10
Dependent Claim 41 words
The method of claim 1 wherein step (f) comprises the step of providing a layer of a mixture of cement and a low density filler over the construction form shell which when cured will provide the structural shell of the building.
Claim 11
Dependent Claim 13 words
The method of claim 9 wherein the mixture further includes a polymeric resin.
Claim 12
Dependent Claim 12 words
The method of claim 9 wherein the low density filler is perlite.
Claim 13
Dependent Claim 16 words
The method of claim 9 wherein the low density filler is comprised of a plastic foam.
Claim 14
Dependent Claim 25 words
The method of claim 1 wherein the shells formed in steps (c) and (e) are terminated substantially at their intersection to form an archway therebetween.
Claim 15
Dependent Claim 27 words
The method of claim 1 wherein the shell formed in step (c) extends at least partially into the geometric form of the shell formed in step (e).
Claim 16
Dependent Claim 29 words
The method of claim 14 wherein step (f) includes the application of the structural layer over the shell formed in step (c) within the shell formed in step (e).
Claim 17
Dependent Claim 67 words
The method of claim 1 wherein steps (d) and (e) are successively repeated to provide an integral grouping of shells disposed around an area, and further comprised of the steps of placing a balloon over the area between shells and inflating the balloon, and providing a layer of material on the balloon to form a roof construction form shell over the area before proceeding with step (f).
Claim 18
Dependent Claim 33 words
The method of claim 16 wherein the balloon placed over the area between shells is at least temporarily retained by attachment to the side of at least some of the previously formed shells.
Claim 19
Dependent Claim 24 words
The method of claim 1 wherein the layers of material applied in steps (c) and (e) at least partially penetrate and rigidize the balloons.
Claim 20
Dependent Claim 19 words
The method of claim 1 wherein the balloons are recovered by deflation and removal from the construction form shells.
Claim 21
Dependent Claim 17 words
The method of claim 1 wherein the balloons of steps (b) and (d) are different size balloons.
Claim 22
Dependent Claim 27 words
The method of claim 1 further comprised of providing window and door cutouts in the shell and fastening molds over the cutouts before proceeding with step (f).
Claim 23
Dependent Claim 13 words
The method of claim 21 wherein the molds are recovered after step (f).
Claim 24
Dependent Claim 14 words
The method of claim 21 wherein the molds become integrated into the resulting structure.
Claim 25
Dependent Claim 31 words
The method of claim 1 wherein the step of providing a foundation includes the step of providing a foundation having walls defining at least a part of the desired finished structure.
Claim 26
Dependent Claim 18 words
The method of claim 1 wherein the base of each balloon has a substantially circular free form periphery.
Claim 27
Independent Claim 168 words
A method of forming structures comprising the steps of: a. providing a foundation; b. placing a balloon having a shape substantially similar to part of the building to be formed over part of the foundation and inflating the balloon; c. providing a layer of material on the balloon to rigidify the balloon to form a substantially rigid construction form shell; d. placing a balloon having a shape substantially similar to another part of the building to be formed over part of the foundation so that the base and part of the lower part of the balloon is intersected by the shell formed in step (c); e. providing a layer of material on the balloon of step (d) to rigidify the balloon to form a substantially rigid construction form shell coupled to the shell formed in step (c) to form one integral shell; and f. providing at least one layer of structural material over the construction form shell which, when cured, will provide the structural shell of the building.
Claim 28
Independent Claim 168 words
A method of forming structures comprising the steps of: a. providing a foundation; b. placing a balloon having a shape substantially similar to part of the building to be formed over part of the foundation and inflating the balloon; c. providing a layer of material on the balloon to rigidify the balloon to form a substantially rigid construction form shell; d. placing a balloon having a shape substantially similar to another part of the building to be formed over part of the foundation so that the base and part of the lower part of the balloon is intersected by the shell formed in step (c); e. providing a layer of material on the balloon of step (d) to rigidify the balloon to form a substantially rigid construction form shell coupled to the shell formed in step (c) to form one integral shell; and f. providing at least one layer of structural material over the construction form shell which, when cured, will provide the structural shell of the building.
Claim 29
Dependent Claim 25 words
The method of claim 26 wherein the shells formed in steps (c) and (e) are terminated substantially at their intersection to form an archway therebetween.
Claim 30
Dependent Claim 27 words
The method of claim 26 wherein the shell formed in step (c) extends at least partially into the geometric form of the shell formed in step (e).
Claim 31
Dependent Claim 29 words
The method of claim 28 wherein step (f) includes the application of the structural layer over the shell formed in step (c) within the shell formed in step (e).
Claim 32
Dependent Claim 67 words
The method of claim 26 wherein steps (d) and (e) are successively repeated to provide an integral grouping of shells disposed around an area, and further comprised of the steps of placing a balloon over the area between shells and inflating the balloon, and providing a layer of material on the balloon to form a roof construction form shell over the area before proceeding with step (f).
Claim 33
Dependent Claim 33 words
The method of claim 10 wherein the balloon placed over the area between shells is at least temporarily retained by attachment to the side of at least some of the previously formed shells.
Claim 34
Dependent Claim 31 words
The method of claim 26 wherein the step of providing a foundation includes the step of providing a foundation having walls defining at least a part of the desired finished structure.
Claim 35
Independent Claim 191 words
A method of forming structures comprising the steps of: a. providing a foundation; b. placing a balloon having a shape substantially similar to part of the building to be formed over part of the foundation and inflating the balloon; c. placing a loose fitting sock-like covering over the balloon; d. providing a layer of material on the covering to rigidify the covering to form a substantially rigid construction form shell; e. placing a balloon having a shape substantially similar to another part of the building to be formed over part of the foundation so that the base and part of the lower part of the balloon is intersected by the shell formed in step (d); f. placing a loose fitting sock-like covering over the balloon of step (e); g. providing a layer of material on the covering of step (f) to rigidify the covering to form a substantially rigid construction form shell coupled to the shell formed in step (d) to form one integral shell; and h. providing at least one layer of structural material over the construction form shell which, when cured, will provide the structural shell of the building.
Claim 36
Independent Claim 191 words
A method of forming structures comprising the steps of: a. providing a foundation; b. placing a balloon having a shape substantially similar to part of the building to be formed over part of the foundation and inflating the balloon; c. placing a loose fitting sock-like covering over the balloon; d. providing a layer of material on the covering to rigidify the covering to form a substantially rigid construction form shell; e. placing a balloon having a shape substantially similar to another part of the building to be formed over part of the foundation so that the base and part of the lower part of the balloon is intersected by the shell formed in step (d); f. placing a loose fitting sock-like covering over the balloon of step (e); g. providing a layer of material on the covering of step (f) to rigidify the covering to form a substantially rigid construction form shell coupled to the shell formed in step (d) to form one integral shell; and h. providing at least one layer of structural material over the construction form shell which, when cured, will provide the structural shell of the building.
Claim 37
Dependent Claim 18 words
The method of claim 33 further comprised of the step of deflating and recovering the balloons for reuse.
Claim 38
Dependent Claim 25 words
The method of claim 33 wherein the shells formed in steps (d) and (g) are terminated substantially at their intersection to form an archway therebetween.
Claim 39
Dependent Claim 27 words
The method of claim 33 wherein the shell formed in step (d) extends at least partially into the geometric form of the shell formed in step (g).
Claim 40
Dependent Claim 29 words
The method of claim 36 wherein step (h) includes the application of the structural layer cover the shell formed in step (d) within the shell formed in step (g).
Claim 41
Dependent Claim 68 words
The method of claim 33 wherein steps (e), (f) and (g) are successively repeated to provide an integral grouping of shells disposed around an area, and further comprised of the steps of placing a balloon over the area between shells and inflating the balloon, and providing a layer of material on the balloon to form a roof construction form shell over the area before proceeding with step (h).
Claim 42
Dependent Claim 33 words
The method of claim 38 wherein the balloon placed over the area between shells is at least temporarily retained by attachment to the side of at least some of the previously formed shells.
Claim 43
Dependent Claim 31 words
The method of claim 33 wherein the step of providing a foundation includes the step of providing a foundation having walls defining at least a part of the desired finished structure.

References Cited (Backward Citations)

US3225413A Cited
US3118010A Cited
US3277219A Cited
US3357142A Cited
US3668287A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1980-08-15 1981-02-14 1981-08-16 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1984-08-15 1985-02-14 1985-08-16 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1988-08-15 1989-02-14 1989-08-16 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag