Claims Analysis
Total Claims: 11
Claim 1
Independent Claim
157 words
A method of increasing the internal pressure in a fluid-bearing earth formation, comprising the steps of establishing at least two spaced apart boreholes extending into a subsurface earth formation containing both oil and other aqueous liquids, disposing a separate electrical conductor in each of said boreholes and into electrical contact with said aqueous liquids in said formation, insulating both of said conductors from substantially all earth materials adjacent said boreholes and lying above said subsurface earth formation to establish an electrical path composed of said insulated conductors and said formation materials extending therebetween, establishing an AC flow of electric current in said electrical path composed of said insulated conductors and said formation materials lying therebetween, electrochemically generating free hydrogen gas in said subsurface earth formation between said boreholes as a function of current intensity in said formation, and trapping said free hydrogen gas in said formation to increase the pressure in said formation on said oil therein.
Claim 2
Independent Claim
157 words
A method of increasing the internal pressure in a fluid-bearing earth formation, comprising the steps of establishing at least two spaced apart boreholes extending into a subsurface earth formation containing both oil and other aqueous liquids, disposing a separate electrical conductor in each of said boreholes and into electrical contact with said aqueous liquids in said formation, insulating both of said conductors from substantially all earth materials adjacent said boreholes and lying above said subsurface earth formation to establish an electrical path composed of said insulated conductors and said formation materials extending therebetween, establishing an AC flow of electric current in said electrical path composed of said insulated conductors and said formation materials lying therebetween, electrochemically generating free hydrogen gas in said subsurface earth formation between said boreholes as a function of current intensity in said formation, and trapping said free hydrogen gas in said formation to increase the pressure in said formation on said oil therein.
Claim 3
Dependent Claim
48 words
The method described in claim 1, further including the steps of establishing another different borehole spaced from said two boreholes and also extending into said subsurface earth formation, and withdrawing oil from said formation through said another different borehole in response to said increased pressure in said formation.
Claim 4
Dependent Claim
24 words
The method described in claim 2, wherein said another borehole is further spaced from an axis defined by said boreholes containing said electrical conductors.
Claim 5
Dependent Claim
34 words
The method described in claim 3, including the step of electrochemically generating free carbon dioxide gas in said formation between said two spaced apart boreholes as a function of current density in said formation.
Claim 6
Dependent Claim
20 words
The method described in claim 4, wherein said current flow between said electrodes is a flow of single-phase AC current.
Claim 7
Dependent Claim
24 words
The method described in claim 5, further including the step of circulating a cooling liquid within each of said boreholes containing said electrical conductors.
Claim 8
Dependent Claim
46 words
The method described in claim 5, further including the step of injecting a quantity of an electrically conductive aqueous liquid into each of said spaced apart boreholes for establishing an electrical coupling between said electrical conductors therein and said aqueous liquids in said subsurface earth formation.
Claim 9
Dependent Claim
89 words
The method described in claim 4, further including the steps of establishing a third borehole extending into said formation and spaced generally triangularly from said at least two spaced apart boreholes containing said conductors, disposing a third electrical conductor in said third borehole and into electrical contact with said aqueous liquids in said formation, insulating said third conductor from substantially all earth materials adjacent said third borehole and lying above said formation, and interconnecting a three-phase AC current to said conductors with each conductor receiving a different phase thereof.
Claim 10
Dependent Claim
24 words
The method described in claim 8, further including the step of circulating a cooling liquid within each of said boreholes containing said electrical conductors.
Claim 11
Dependent Claim
44 words
The method described in claim 8, further including the step of injecting a quantity of an electrically conductive aqueous liquid into each of said boreholes containing conductors for establishing an electrical coupling between said conductors and said aqueous liquids in said subsurface earth formation.