Method and apparatus for moulding hydraulic cement or the like material
Assignee: Taisei Corp
•
Filing: 1974-11-25
•
Granted: 1977-07-19
•
Expires: 1994-11-25
Abstract
Abstract Hydraulic cement or the like is poured into a closed mould under a reduced pressure condition to a level slightly higher than a predetermined level. Coarse aggregate and steel rods are prepacked in the mould. After pouring the pressure in the mould is increased to atmospheric pressure or a higher pressure to force the hydraulic cement above the predetermined level back into the space below the level thus compacting the poured in hydraulic cement. A cushion device is provided for the pouring device. An overflow tank is connected to the mould to observe the level of the poured cement. The pressure in the overflow tank is also decreased during pouring and increased after pouring.
Inventors
- 👤 Yasuro Ito
- 👤 Hideharu Kaga
- 👤 Yasuhiro Yamamoto
- 👤 Tadayuki Sumita
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-24 18:50
CPC Classifications
B; B28; B28B; B28B1/00; B28B1/24; B28B23/00; B28B23/0081; B28B7/00; B28B7/0058; B28B7/40; B28B7/44; E; E02; E02D; E02D27/00; E02D27/01; Y; Y10; Y10S; Y10S264/00; Y10S264/78
Claims Analysis
Total Claims: 39
Claim 1
Independent Claim
192 words
A method of moulding a hydraulic substance comprising aggregate and a cement and water mixture, utilizing an injection zone, a moulding zone and an overflow zone, said overflow zone being separate from the moulding zone, which comprises filling the moulding zone with aggregate, reducing the pressure in the injection zone, in the moulding zone and in the overflow zone to a vacuum, introducing said cement and water mixture into the injection zone, transferring said mixture from the injection zone into the moulding zone in sufficient excess quantity to cause said mixture to overflow from the moulding zone into the overflow zone, returning the overflow zone to at least atmospheric pressure whereby at least a portion of said excess quantity of said mixture in the overflow zone is returned to the moulding zone to eliminate the voids between the aggregate in the moulding zone created by removing the excess water and entrained air under reduced pressure, and replacing said voids with said cement and water mixture to produce a substantially void-free product, said mixture being maintained in sufficient quantity in said overflow zone to avoid the introduction of air into the moulding zone.
Claim 2
Independent Claim
192 words
A method of moulding a hydraulic substance comprising aggregate and a cement and water mixture, utilizing an injection zone, a moulding zone and an overflow zone, said overflow zone being separate from the moulding zone, which comprises filling the moulding zone with aggregate, reducing the pressure in the injection zone, in the moulding zone and in the overflow zone to a vacuum, introducing said cement and water mixture into the injection zone, transferring said mixture from the injection zone into the moulding zone in sufficient excess quantity to cause said mixture to overflow from the moulding zone into the overflow zone, returning the overflow zone to at least atmospheric pressure whereby at least a portion of said excess quantity of said mixture in the overflow zone is returned to the moulding zone to eliminate the voids between the aggregate in the moulding zone created by removing the excess water and entrained air under reduced pressure, and replacing said voids with said cement and water mixture to produce a substantially void-free product, said mixture being maintained in sufficient quantity in said overflow zone to avoid the introduction of air into the moulding zone.
Claim 3
Dependent Claim
16 words
The method of claim 1, wherein the overflow zone is positioned higher than the moulding zone.
Claim 4
Dependent Claim
22 words
The method of claim 1, wherein the overflow zone is a separate overflow tank which is positioned higher than the moulding zone.
Claim 5
Dependent Claim
26 words
The method of claim 1, wherein the injection zone is returned to at least atmospheric pressure at the same time as that of the overflow zone.
Claim 6
Dependent Claim
48 words
The method of claim 1, wherein the area at the inlet to the moulding zone from the injection zone is increased to provide a smooth transition between said zones and reduce the tendency of the aggregate to block and reduce the effective area of transition between said zones.
Claim 7
Dependent Claim
15 words
The method of claim 1, wherein the injection zone is disposed above the moulding zone.
Claim 8
Dependent Claim
35 words
The method of claim 1, wherein the zone adjacent the moulding zone is evacuated, so that said moulding zone is subjected to a vacuum within the moulding zone and a vacuum surrounding the moulding zone.
Claim 9
Dependent Claim
72 words
The method of claim 7, wherein the zones adjacent the moulding zone are closed tanks disposed between the moulding zone and the injection and overflow zones, respectively, and the pressure in said closed tanks is reduced prior to introducing the cement and water mixture into the moulding zone and increased after the completion of said introduction and said cement and water mixture is introduced into said moulding zone through said closed tank.
Claim 10
Dependent Claim
43 words
The method of claim 1, wherein the injection zone and the moulding zone are closed zones and the pressure difference between the zones is regulated to control the flow of the cement and water mixture from the injection zone to the moulding zone.
Claim 11
Dependent Claim
21 words
The method of claim 1, wherein the pressure in the moulding zone is reduced to less than 0.8 Kg/cm 2 .
Claim 12
Dependent Claim
21 words
The method of claim 1, wherein the pressure in the moulding zone is reduced to less than 0.7 Kg/cm 2 .
Claim 13
Dependent Claim
14 words
The method of claim 1, wherein coarse aggregate is prepacked in the moulding zone.
Claim 14
Dependent Claim
20 words
The method of claim 12, wherein said coarse aggregate is selected from the group consisting of crushed stone and gravel.
Claim 15
Dependent Claim
13 words
The method of claim 12, wherein said coarse aggregate comprises lightweight coarse aggregate.
Claim 16
Dependent Claim
22 words
The method of claim 1, wherein the cement and water mixture is strongly bonded to the inner surface of the moulding zone.
Claim 17
Dependent Claim
48 words
The method of claim 1, wherein the moulding zone is airtight sealed by a sealing member, and the cement and water mixture is sequentially poured into the moulding zone to substantially fill the voids created by removing excess water and entrained air from the mixture under reduced pressure.
Claim 18
Dependent Claim
59 words
The method of claim 1, wherein a cushioning effect is achieved by providing a reduced pressure on the cement and water mixture, said mixture being disposed intermediate the injection zone and the point of introduction of the cement and water mixture into the moulding zone, thereby alleviating the pressure difference between the inside and outside of said moulding zone.
Claim 19
Dependent Claim
93 words
The method of claim 17, wherein said cushioning effect is achieved by providing a closed tank which is operatively connected between the injection zone which houses the cement and water mixture and moulding zone, the pressure in said closed tank being reduced at the time of introducing the cement and water mixture into the moulding zone and increased after the completion of said introduction, and said cement and water mixture is introduced into said moulding zone through said closed tank whereby said mixture is subjected to the reduced pressure in said closed tank.
Claim 20
Dependent Claim
41 words
The method of claim 18, wherein the injection zone containing the cement and water mixture is open to the environment and is connected to said closed tank by a pipe for transferring said cement and water mixture to said closed tank.
Claim 21
Dependent Claim
32 words
The method of claim 18, wherein said closed tank is vibrated for spreading the cement and water mixture and for removing excess water and entrained air from the cement and water mixture.
Claim 22
Dependent Claim
82 words
The method of claim 1, wherein pressure feed means are provided downstream of the injection zone and a circulating passage provides communication between the downstream side of the pressure feed means and the injection zone whereby when the pressure of the cement and water mixture on the downstream or output side of the pressure feed means exceeds a predetermined value, said cement and water mixture is returned to the upstream or input side of the pressure feed means through said circulating passage.
Claim 23
Dependent Claim
26 words
The method of claim 21, wherein the circulating passage is provided with a closed tank and wherein the pressure in said closed tank can be reduced.
Claim 24
Dependent Claim
54 words
The method of claim 22, wherein said circulating passage leading to the input side of said pressure feed means is open at an intermediate point of the length of said closed tank whereby said cement and water mixture is introduced into said mould under the head difference between said intermediate point and said mould.
Claim 25
Dependent Claim
56 words
The method of claim 21, wherein the pressure is measured in the circulating passage for returning the cement and water mixture to the input side of the pressure feed means from the output side thereof, whereby the cement and water mixture can be introduced into the moulding zone at a pressure less than a predetermined value.
Claim 26
Dependent Claim
43 words
The method of claim 1, wherein the overflow zone is a closed zone and wherein the overflow zone is connected to the moulding zone through a pipe which is prepacked with a material which resists the flow of the cement and water mixture.
Claim 27
Dependent Claim
26 words
The method of claim 1, wherein the cement and water mixture is introduced into the closed moulding zone while it is held in a vertical position.
Claim 28
Dependent Claim
24 words
The method of claim 7, wherein the zone adjacent the moulding zone is reduced during the moulding process and increased after the moulding process.
Claim 29
Dependent Claim
45 words
The method of claim 1, wherein the injection zone, the moudling zone and the overflow zone are closed zones and said closed moulding zone is formed to surround a crack disposed in a concrete structure said cement and water mixture being introduced into said crack.
Claim 30
Dependent Claim
47 words
The method of claim 1, wherein the injection zone, the moudling zone and the overflow zone are closed zones and said closed moulding zone is formed to surround a gap disposed between a pair of concrete structures, said cement and water mixture being introduced into said gap.
Claim 31
Dependent Claim
56 words
The method of claim 3, wherein the overflow tank is transparent or provided with a transparent window and the quantity of overflow into the overflow tank is observed and controlled to avoid the introduction of air into the moulding zone when a quantity of the overflow from the overflow tank is reintroduced into the moulding zone.
Claim 32
Dependent Claim
17 words
The method of claim 1, wherein after moulding, the moulded product is subjected to a curing treatment.
Claim 33
Dependent Claim
43 words
The method of claim 1, wherein after the moulding zone is filled with aggregate, a perforated plate is inserted into the moulding zone for preventing the floating and displacement of the aggregate when the cement and water mixture is introduced into the mould.
Claim 34
Dependent Claim
58 words
The method of claim 1, wherein in order to eliminate the occurrence of a coarse surface in the moulded product, a thin coating of the cement and water mixture is applied to the bottom of the mould and then the aggregate is packed in the mould to a level slightly lower than the top edge of the mould.
Claim 35
Dependent Claim
25 words
The method of claim 1, wherein the cement and water mixture is introduced from the injection zone to the moulding zone by a pressure difference.
Claim 36
Dependent Claim
39 words
The method of claim 1, wherein when the speed of introduction of the cement and water mixture into the moulding zone decreases the injection zone is open to atmospheric pressure to increase the speed of introduction of said mixture.
Claim 37
Dependent Claim
38 words
The method of claim 1, wherein the speed of introduction of the cement and water mixture from the injection zone into the moulding zone is determined by the head difference between the injection zone and the moulding zone.
Claim 38
Dependent Claim
31 words
The method of claim 1, wherein the speed of introduction of the cement and water mixture from the injection zone into the moulding zone is controlled by a pressure feed means.
Claim 39
Dependent Claim
36 words
The method of claim 37, wherein the speed of introduction of the cement and water mixture from the injection zone into the moulding zone is maintained constant by varying the pressure of the pressure feed means.
References Cited (Backward Citations)
US886768A
Cited
US1558782A
Cited
US2165671A
Cited
US2313110A
Cited
US2548935A
Cited
US2560619A
Cited
GB801182A
Cited
US2913036A
Cited
US3177273A
Cited
US3192594A
Cited
US3663148A
Cited
US3875278A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1980-07-18 | 1981-01-17 | 1981-07-19 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1984-07-18 | 1985-01-17 | 1985-07-19 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1988-07-18 | 1989-01-17 | 1989-07-19 | $7700.00 | Window Closed / Lapsed |