← Back to Patent Explorer
US4028787A Expired / Lapsed US ⏱️ 0.0 years remaining

Refurbished turbine vanes and method of refurbishment thereof

Assignee: Turbine Components Corp
•
Filing: 1975-09-15
•
Granted: 1977-06-14
•
Expires: 1995-09-15
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A refurbished turbine vane and method of producing the same. Used turbine vanes are cleaned, annealed and slotted adjacent their ends, after which the cooling passages are welded closed and all cracks welded over, on both leading and trailing edges. The trailing edge, for a vane having a short chord, is built up by welding along its full length with an alloy wire, after which the slots that were cut adjacent the ends are closed, also by welding. Then the worn surfaces of the vane are built-up by a plasma spray process, using a metal powder with added silica, to a thickness as great as 30 to 40 thousandths of an inch. The built-up vane is then sintered and thereafter surface finished to conform to the original contour of the blade when new. The cooling holes are finally recut, and the vane polished as required and inspected.

Inventors

  • 👤 Salvatore J. Cretella
  • 👤 Matthew Bernardo
  • 👤 Ralph T. De Musis

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 09:12
CPC Classifications
C; C22; C22F; C22F1/00; C22F1/10; B; B23; B23K; B23K10/00; B23K10/02; B23K10/027; B23K31/00; B23K31/02; B23K35/00; B23K35/02; B23K35/0222; B23K35/0244; B23K35/22; B23K35/24; B23K35/30; B23K35/3046; B23K35/36; B23K35/3601; B23K35/3607; B23P; B23P6/00; B23P6/002; B23P6/007; F; F01; F01D; F01D5/00; F01D5/005; F01D5/12; F01D5/28; F01D5/288; B23K2101/00; B23K2101/001; Y; Y02; Y02T; Y02T50/00; Y02T50/60; Y10; Y10T; Y10T29/00; Y10T29/49; Y10T29/49316; Y10T29/49318; Y10T29/49718; Y10T29/49746

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 111 words
The method of refurbishing a turbine vane, which includes the steps of welding cracks in the vane surface, slitting portions of the vane at the two ends of the trailing edge to relieve stresses in the vane, welding the trailing edge of the vane to build up the same, welding an elongate surface portion of the vane spaced from and substantially coextensive with the trailing edge to reinforce the vane, welding the slitted portions closed, plasma spraying molten metal or eroded surfaces of the vane to build up the same beyond the original surfaces, and grinding down the built-up surfaces to refinish the same to conform with the original vane surfaces.
Claim 2
Independent Claim 111 words
The method of refurbishing a turbine vane, which includes the steps of welding cracks in the vane surface, slitting portions of the vane at the two ends of the trailing edge to relieve stresses in the vane, welding the trailing edge of the vane to build up the same, welding an elongate surface portion of the vane spaced from and substantially coextensive with the trailing edge to reinforce the vane, welding the slitted portions closed, plasma spraying molten metal or eroded surfaces of the vane to build up the same beyond the original surfaces, and grinding down the built-up surfaces to refinish the same to conform with the original vane surfaces.

References Cited (Backward Citations)

US1755321A Cited
US2494970A Cited
US2641439A Cited
GB800414A Cited
US3015880A Cited
US3564689A Cited
US3576065A Cited
US3711310A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1980-06-13 1980-12-13 1981-06-14 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1984-06-13 1984-12-13 1985-06-14 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1988-06-13 1988-12-13 1989-06-14 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag