← Back to Patent Explorer
US4021301A Expired / Lapsed US ⏱️ 0.0 years remaining

Nuclear reactor installation

Assignee: Siemens AG
•
Filing: 1974-01-24
•
Granted: 1977-05-03
•
Expires: 1994-01-24
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A nuclear reactor installation includes a pressurized-water reactor having a main coolant pipe line loop provided with a pressurizer. The steam space of the pressurizer is connected to a tank containing a concentrated solution of boric acid and which is connected with the loop via a normally-closed valve means which opens when the loop pressure reduces below normal, so that the steam pressure in the pressurizer, drives the solution from the tank into the loop and thus into the reactor where the concentrated boric acid solution provides equalization for the increase in the reactor's core reactivity which takes place when the coolant temperature drops.

Inventors

  • 👤 Gerhard Frei

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 22:38
CPC Classifications
G; G21; G21C; G21C7/00; G21C7/06; G21C7/22; G21C9/00; G21C9/02; G21C9/033; Y; Y02; Y02E; Y02E30/00; Y02E30/30

Claims Analysis

Total Claims: 6
Claim 1
Independent Claim 141 words
A pressurized-water reactor installation comprising a reactor pressure vessel, a nuclear core inside of said vessel, a primary coolant pipe line loop connected to said vessel and including a steam generator and a main coolant pump, said vessel and said loop containing water coolant, a pressurizer outside of said vessel and comprising a chamber having a lower portion containing water and an upper portion containing steam, a pipe line connecting the pressurizer's lower portion with said loop and pressurizing the water in the loop, a tank on the outside of said vessel and containing a concentrated solution of core-reactivity control substance, means for connecting the upper portion of said pressurizer with said tank and pressurizing said solution, and means for connecting said tank with said loop in response to pressure in the loop abnormally reducing relative to pressure in the tank.
Claim 2
Dependent Claim 141 words
A pressurized-water reactor installation comprising a reactor pressure vessel, a nuclear core inside of said vessel, a primary coolant pipe line loop connected to said vessel and including a steam generator and a main coolant pump, said vessel and said loop containing water coolant, a pressurizer outside of said vessel and comprising a chamber having a lower portion containing water and an upper portion containing steam, a pipe line connecting the pressurizer's lower portion with said loop and pressurizing the water in the loop, a tank on the outside of said vessel and containing a concentrated solution of core-reactivity control substance, means for connecting the upper portion of said pressurizer with said tank and pressurizing said solution, and means for connecting said tank with said loop in response to pressure in the loop abnormally reducing relative to pressure in the tank.
Claim 3
Dependent Claim 47 words
The installation of claim 1 in which said pipe line connecting the pressurizer with the loop includes a reverse coolant flow choke retarding rapid pressure loss from said steam space directly to said coolant loop when said coolant pressure reduces and the last-named means effects said connecting.
Claim 4
Dependent Claim 18 words
The installation of claim 2 in which said tank has means for heating said solution when contained therein.
Claim 5
Dependent Claim 41 words
The installation of claim 2 in which said means connecting the pressurizer with the tank includes a check valve preventing backflow of the contents of said tank to said steam space while permitting flow from said steam space to said tank.
Claim 6
Dependent Claim 39 words
The installation of claim 4 in which a pressure-equalizing pipe line is shunted around said check valve and which is of small flow capacity relative to that from said steam space towards said tank effected by said check-valve action.

References Cited (Backward Citations)

GB845805A Cited
US2989454A Cited
GB1100767A Cited
US3372092A Cited
US3448797A Cited
US3414476A Cited
US3528884A Cited
US3666622A Cited
US3718539A Cited
US3859166A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1980-05-02 1980-11-01 1981-05-03 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1984-05-02 1984-11-01 1985-05-03 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1988-05-02 1988-11-01 1989-05-03 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag