US4018283A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method and apparatus for gravel packing wells
Assignee: ExxonMobil Upstream Research Co
•
Filing: 1976-03-25
•
Granted: 1977-04-19
•
Expires: 1996-03-25
Abstract
Abstract The perforations of a tubular pipe are sealed with a selectively removable plugging material. The pipe is then wire wrapped to form a well screen. The annular passage defined by the pipe and wire wrapping is restricted enough so that the flow resistance in the annular passage is sufficient to maintain high fluid flow velocity outside the well screen during gravel packing so as to prevent the formation of gravel dunes. After gravel packing is completed, the plugging material is removed, permitting the passage of fluids through the well screen and pipe mandrel.
Inventors
- 👤 Larry A. Watkins
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-01 18:33
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/02; E21B43/10; E21B43/04; E21B43/045; E21B43/08; E21B43/088
Claims Analysis
Total Claims: 20
Claim 1
Independent Claim
167 words
In a method of gravel packing a well screen opposite a subterranean formation in a well wherein a carrier liquid having gravel suspended therein is flowed downwardly along the outside of said well screen and upwardly through the bottom of said well screen, said well screen including a tubular pipe having perforations formed therein which is concentrically wrapped with a wire screen, the improvement comprising: sealing the perforations of said pipe with a temporary plugging material; adjusting the radial clearance between said pipe and said wire screen so that the resistance to flow in the annular shaped passage defined by the exterior of said pipe and the interior of said wire screen is sufficient to maintain at least the minimum flow velocity of said carrier liquid along the outside of said well screen necessary to prevent premature settling of said gravel and the formation of gravel dunes near the upper portions of said well screen; and selectively removing said plugging material after said gravel is in place.
Claim 2
Dependent Claim
167 words
In a method of gravel packing a well screen opposite a subterranean formation in a well wherein a carrier liquid having gravel suspended therein is flowed downwardly along the outside of said well screen and upwardly through the bottom of said well screen, said well screen including a tubular pipe having perforations formed therein which is concentrically wrapped with a wire screen, the improvement comprising: sealing the perforations of said pipe with a temporary plugging material; adjusting the radial clearance between said pipe and said wire screen so that the resistance to flow in the annular shaped passage defined by the exterior of said pipe and the interior of said wire screen is sufficient to maintain at least the minimum flow velocity of said carrier liquid along the outside of said well screen necessary to prevent premature settling of said gravel and the formation of gravel dunes near the upper portions of said well screen; and selectively removing said plugging material after said gravel is in place.
Claim 3
Dependent Claim
51 words
The method as recited in claim 1 wherein the radial clearance between said pipe and said wire screen is adjusted by inserting a plurality of longitudinally spaced wire standoff ribs between said pipe and said wire screen, said standoff ribs having a diameter of between about 0.15 inches and 0.25 inches.
Claim 4
Dependent Claim
35 words
The method as recited in claim 1 wherein the radial clearance between said pipe and said wire screen is adjusted by machining a plurality of longitudinally spaced grooves into the outer surface of said pipe.
Claim 5
Dependent Claim
64 words
The method as recited in claim 1 wherein the resistance to flow in said annular shaped passage is at least about 0.12 pounds per square inch per foot of length of said well screen if said well is vertical or slightly deviated and at least 0.24 pounds per square inch per foot of length of said well screen if said well is highly deviated.
Claim 6
Dependent Claim
52 words
The method as recited in claim 1 wherein said plugging material is a fusible, heat sensitive material with a melting point below the normal temperature of said well where said well screen is positioned and wherein said plugging material is removed by melting said plugging material with heat generated by said well.
Claim 7
Dependent Claim
13 words
The method as recited in claim 5 wherein said fusible material is wax.
Claim 8
Dependent Claim
15 words
The method as recited in claim 5 wherein said fusible material is a thermoplastic resin.
Claim 9
Dependent Claim
17 words
The method as recited in claim 5 wherein said fusible material is a low melting point alloy.
Claim 10
Dependent Claim
30 words
The method as recited in claim 1 wherein said plugging material is a dissolvable material and wherein said plugging material is removed by extracting said plugging material with a solvent.
Claim 11
Dependent Claim
31 words
The method as recited in claim 1 wherein said plugging material is a decomposable material and wherein said plugging material is removed by decomposing said plugging material with a corrosive chemical.
Claim 12
Dependent Claim
137 words
A well screen for packing gravel wells comprising: a tubular pipe having perforations formed therein; a selectively removable plugging material sealing the perforations of said pipe; a wire screen extending circumferentially around said pipe; and a plurality of standoff wire ribs longitudinally spaced along said pipe, said wire ribs providing a clearance of between about 0.15 inches and 0.25 inches between said pipe mandrel and said wire screen such that the resistance to flow in the annular passages defined by the exterior of said pipe, the interior of said wire screen and the wire ribs is sufficient to maintain at least the minimum velocity of a carrier liquid, having gravel suspended therein, necessary to prevent premature settling of said gravel and the formation of gravel dunes near the upper portions of said well screen during gravel packing.
Claim 13
Dependent Claim
137 words
A well screen for packing gravel wells comprising: a tubular pipe having perforations formed therein; a selectively removable plugging material sealing the perforations of said pipe; a wire screen extending circumferentially around said pipe; and a plurality of standoff wire ribs longitudinally spaced along said pipe, said wire ribs providing a clearance of between about 0.15 inches and 0.25 inches between said pipe mandrel and said wire screen such that the resistance to flow in the annular passages defined by the exterior of said pipe, the interior of said wire screen and the wire ribs is sufficient to maintain at least the minimum velocity of a carrier liquid, having gravel suspended therein, necessary to prevent premature settling of said gravel and the formation of gravel dunes near the upper portions of said well screen during gravel packing.
Claim 14
Dependent Claim
65 words
The well screen as defined in claim 11 wherein the resistance to flow in said annular shaped passage is at least about 0.12 pounds per square inch per foot of length of said well screen if said well is vertical or slightly deviated and at least 0.24 pounds per square inch per foot of length of said well screen if said well is highly deviated.
Claim 15
Dependent Claim
52 words
The well screen as defined in claim 11 wherein said plugging material is a fusible, heat sensitive material with a melting point below the normal temperature of said well where said well screen positioned and wherein said plugging material is removed by melting said plugging material with heat generated by said well.
Claim 16
Dependent Claim
14 words
The well screen as defined in claim 13 wherein said fusible material is wax.
Claim 17
Dependent Claim
16 words
The well screen as defined in claim 13 wherein said fusible material is a thermoplastic resin.
Claim 18
Dependent Claim
18 words
The well screen as defined in claim 13 wherein said fusible material is a low melting point alloy.
Claim 19
Dependent Claim
29 words
The well screen as defined in claim 11 wherein said plugging material is a dissolvable material and said plugging material is removed by extracting said sealant with a solvent.
Claim 20
Dependent Claim
32 words
The well screen as defined in claim 11 wherein said plugging material is a decomposable material and wherein said plugging material is removed by decomposing said plugging material with a corrosive chemical.
References Cited (Backward Citations)
US3273641A
Cited
US2046459A
Cited
US2205422A
Cited
US3216497A
Cited
US3322199A
Cited
US3385373A
Cited
US3450207A
Cited
US3709293A
Cited
US3958634A
Cited
US3880233A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1980-04-18 | 1980-10-18 | 1981-04-19 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1984-04-18 | 1984-10-18 | 1985-04-19 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1988-04-18 | 1988-10-18 | 1989-04-19 | $7700.00 | Window Closed / Lapsed |