US3994777A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Nuclear reactor overflow line
Assignee: Energy Research and Development Administration ERDA
•
Filing: 1976-02-12
•
Granted: 1976-11-30
•
Expires: 1996-02-12
Abstract
Abstract The overflow line for the reactor vessel of a liquid-metal-cooled nuclear reactor includes means for establishing and maintaining a continuous bleed flow of coolant amounting to 5 to 10% of the total coolant flow through the overflow line to prevent thermal shock to the overflow line when the reactor is restarted following a trip. Preferably a tube is disposed concentrically just inside the overflow line extending from a point just inside the reactor vessel to an overflow tank and a suction line is provided opening into the body of liquid metal in the reactor vessel and into the annulus between the overflow line and the inner tube.
Inventors
- 👤 Wayne J. Severson
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-01 22:50
CPC Classifications
G; G21; G21C; G21C1/00; G21C1/02; Y; Y02; Y02E; Y02E30/00; Y02E30/30
Claims Analysis
Total Claims: 3
Claim 1
Independent Claim
120 words
In a liquid-metal-cooled nuclear reactor including a reactor vessel having an overflow line establishing therein a liquid level for steady state operation, the improvement comprising a tube concentrically disposed in the overflow line establishing an annulus between the overflow line and the tube and an orificed suction line opening to the body of liquid metal within the reactor vessel and to said annulus, said concentric tube extending from a point inside the reactor vessel past the orificed suction line to the interior of the overflow tank positioned outside the reactor vessel whereby a continuous bleed flow of liquid metal is established through said annulus to prevent thermal shock to the overflow line when the reactor is restarted following a trip.
Claim 2
Dependent Claim
120 words
In a liquid-metal-cooled nuclear reactor including a reactor vessel having an overflow line establishing therein a liquid level for steady state operation, the improvement comprising a tube concentrically disposed in the overflow line establishing an annulus between the overflow line and the tube and an orificed suction line opening to the body of liquid metal within the reactor vessel and to said annulus, said concentric tube extending from a point inside the reactor vessel past the orificed suction line to the interior of the overflow tank positioned outside the reactor vessel whereby a continuous bleed flow of liquid metal is established through said annulus to prevent thermal shock to the overflow line when the reactor is restarted following a trip.
Claim 3
Dependent Claim
30 words
The improvement of claim 1 wherein said suction line is orificed to permit 5 to 10% of the total coolant flow through the overflow line to flow through the annulus.
References Cited (Backward Citations)
GB1005489A
Cited
US3215606A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1979-11-30 | 1980-05-31 | 1980-11-30 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1983-11-30 | 1984-05-31 | 1984-11-30 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1987-11-30 | 1988-05-31 | 1988-11-30 | $7700.00 | Window Closed / Lapsed |