US3989945A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method for determining the concentration of fission products in a reactor coolant
Assignee: Westinghouse Electric Corp
•
Filing: 1974-06-14
•
Granted: 1976-11-02
•
Expires: 1994-06-14
Abstract
Abstract A method is disclosed for determining the concentration of fission products in the reactor coolant of a liquid metal cooled nuclear reactor. Reactor coolant is bypassed at constant temperatures and constant velocity through a flow sampling system containing a sampling tube. After a period of time, the sampling tube is isolated and removed from the bypass system; the liquid metal coolant is removed from the tube; and, the radionuclides deposited on the sampling tube are measured by gamma spectroscopy. The concentration of fission products in the reactor coolant is then determined from the measured radioactivity of the deposited nuclides.
Inventors
- 👤 Martin H. Cooper
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-31 06:02
CPC Classifications
G; G01; G01T; G01T7/00; G01T7/02; G21; G21C; G21C17/00; G21C17/02; G21C17/022; G21C17/025; Y; Y02; Y02E; Y02E30/00; Y02E30/30
Claims Analysis
Total Claims: 4
Claim 1
Independent Claim
75 words
A method for determining the concentration of fission products in a reactor coolant of a liquid metal cooled nuclear reactor, comprising the steps of: ducting reactor coolant through a sampling tube for a predetermined period of time at a predetermined rate of flow; removing the sampling tube; removing fission products which are adsorbed on the wall of said sample tube by acid leaching; and then, gamma scanning the removed fission products by gamma spectroscopic apparatus.
Claim 2
Independent Claim
75 words
A method for determining the concentration of fission products in a reactor coolant of a liquid metal cooled nuclear reactor, comprising the steps of: ducting reactor coolant through a sampling tube for a predetermined period of time at a predetermined rate of flow; removing the sampling tube; removing fission products which are adsorbed on the wall of said sample tube by acid leaching; and then, gamma scanning the removed fission products by gamma spectroscopic apparatus.
Claim 3
Dependent Claim
51 words
The method of claim 1, including the steps of: rinsing the removed sampling tube with alcohol prior to said acid leaching; water rinsing the removed sampling tube prior to said acid leaching; and then, combining said rinses and said acid leach prior to said gamma scanning of the removed fission products.
Claim 4
Dependent Claim
31 words
The method of claim 2, including the step of concentrating said combined rinses and leach to concentrate the removed fission products prior to said gamma scanning of the removed fission products.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1979-11-02 | 1980-05-03 | 1980-11-02 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1983-11-02 | 1984-05-03 | 1984-11-02 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1987-11-02 | 1988-05-03 | 1988-11-02 | $7700.00 | Window Closed / Lapsed |