← Back to Patent Explorer
US3989945A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for determining the concentration of fission products in a reactor coolant

Assignee: Westinghouse Electric Corp
•
Filing: 1974-06-14
•
Granted: 1976-11-02
•
Expires: 1994-06-14
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method is disclosed for determining the concentration of fission products in the reactor coolant of a liquid metal cooled nuclear reactor. Reactor coolant is bypassed at constant temperatures and constant velocity through a flow sampling system containing a sampling tube. After a period of time, the sampling tube is isolated and removed from the bypass system; the liquid metal coolant is removed from the tube; and, the radionuclides deposited on the sampling tube are measured by gamma spectroscopy. The concentration of fission products in the reactor coolant is then determined from the measured radioactivity of the deposited nuclides.

Inventors

  • 👤 Martin H. Cooper

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-31 06:02
CPC Classifications
G; G01; G01T; G01T7/00; G01T7/02; G21; G21C; G21C17/00; G21C17/02; G21C17/022; G21C17/025; Y; Y02; Y02E; Y02E30/00; Y02E30/30

Claims Analysis

Total Claims: 4
Claim 1
Independent Claim 75 words
A method for determining the concentration of fission products in a reactor coolant of a liquid metal cooled nuclear reactor, comprising the steps of: ducting reactor coolant through a sampling tube for a predetermined period of time at a predetermined rate of flow; removing the sampling tube; removing fission products which are adsorbed on the wall of said sample tube by acid leaching; and then, gamma scanning the removed fission products by gamma spectroscopic apparatus.
Claim 2
Independent Claim 75 words
A method for determining the concentration of fission products in a reactor coolant of a liquid metal cooled nuclear reactor, comprising the steps of: ducting reactor coolant through a sampling tube for a predetermined period of time at a predetermined rate of flow; removing the sampling tube; removing fission products which are adsorbed on the wall of said sample tube by acid leaching; and then, gamma scanning the removed fission products by gamma spectroscopic apparatus.
Claim 3
Dependent Claim 51 words
The method of claim 1, including the steps of: rinsing the removed sampling tube with alcohol prior to said acid leaching; water rinsing the removed sampling tube prior to said acid leaching; and then, combining said rinses and said acid leach prior to said gamma scanning of the removed fission products.
Claim 4
Dependent Claim 31 words
The method of claim 2, including the step of concentrating said combined rinses and leach to concentrate the removed fission products prior to said gamma scanning of the removed fission products.

References Cited (Backward Citations)

US3178355A Cited
US3733249A Cited
US3746614A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1979-11-02 1980-05-03 1980-11-02 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1983-11-02 1984-05-03 1984-11-02 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1987-11-02 1988-05-03 1988-11-02 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag