Claims Analysis
Total Claims: 34
Claim 1
Independent Claim
229 words
A process for the in-situ recovery of carbonaceous values from subterranean deposits which comprises the steps of: selecting a portion of said carbonaceous deposit as an in-situ retort by establishing confining barriers within which the process is to occur; establishing communication with the base of the subterranean deposit; undercutting at least at the base of said deposit to remove from 0.5 percent to 25 percent by volume of said deposit thereby leaving an overlying deposit supported by pillars and a void into which said overlying deposit can be broken; providing said void with a source inlet and an outlet spaced from said inlet, and said void being shaped to have minimum space at said inlet and expanding to a maximum at said outlet; removing said pillars for thereby initiating the breaking of said overlying carbonaceous deposit to provide a rubblized particulate mass having a void volume approximately equal to the volume of said undercut; said breaking being carried out in a manner to provide a gradation of rubble size from a minimum size at said inlet to a maximum size at said outlet; providing conduit means for communicating reacting fluids for initiating and controlling a combustion process within said rubble; initiating a combustion process near the inlet and controlling said combustion for driving carbonaceous values to said outlet; and withdrawing said carbonaceous values from said deposit at said outlet.
Claim 2
Dependent Claim
229 words
A process for the in-situ recovery of carbonaceous values from subterranean deposits which comprises the steps of: selecting a portion of said carbonaceous deposit as an in-situ retort by establishing confining barriers within which the process is to occur; establishing communication with the base of the subterranean deposit; undercutting at least at the base of said deposit to remove from 0.5 percent to 25 percent by volume of said deposit thereby leaving an overlying deposit supported by pillars and a void into which said overlying deposit can be broken; providing said void with a source inlet and an outlet spaced from said inlet, and said void being shaped to have minimum space at said inlet and expanding to a maximum at said outlet; removing said pillars for thereby initiating the breaking of said overlying carbonaceous deposit to provide a rubblized particulate mass having a void volume approximately equal to the volume of said undercut; said breaking being carried out in a manner to provide a gradation of rubble size from a minimum size at said inlet to a maximum size at said outlet; providing conduit means for communicating reacting fluids for initiating and controlling a combustion process within said rubble; initiating a combustion process near the inlet and controlling said combustion for driving carbonaceous values to said outlet; and withdrawing said carbonaceous values from said deposit at said outlet.
Claim 3
Dependent Claim
29 words
The process of claim 1 wherein said undercutting is substantially wedge-shaped in cross section having its minimum thickness at the inlet and its maximum thickness at the outlet end.
Claim 4
Dependent Claim
16 words
The process of claim 1 wherein the floor of said undercut is sloped toward said outlet.
Claim 5
Dependent Claim
11 words
The process of claim 1 wherein said formation is explosively broken.
Claim 6
Dependent Claim
25 words
The process of claim 4 wherein the placement of explosives within said formation is such as to create progressively larger particles from inlet to outlet.
Claim 7
Dependent Claim
32 words
The process of claim 5 wherein said step of undercutting is carried out so that said pillars are shaped from portions of said deposit left in place to support the overlying deposit.
Claim 8
Dependent Claim
29 words
The process of claim 1 comprising the steps of: forming a cluster of adjacent retorts separated by thin wall partition pillars; and processing said cluster of adjacent retorts simultaneously.
Claim 9
Dependent Claim
19 words
The process of claim 7 comprising the step of: partially removing said partition pillars for inclusion into said processing.
Claim 10
Dependent Claim
19 words
The process of claim 7 comprising the step of explosively removing said partition pillars for inclusion into said process.
Claim 11
Dependent Claim
35 words
The process of claim 1 wherein said step of selecting a deposit comprises: selecting said deposit from the group consisting of oil shale, oil tars, oil sands, tar sands, gilsonite, black shales, lignite, and coal.
Claim 12
Dependent Claim
37 words
The process of claim 1 wherein said source inlet is located substantially on the level with said outlet and spaced therefrom so that substantially said entire deposit selected for processing lies between said inlet and said outlet.
Claim 13
Independent Claim
125 words
A method of preparing a subterranean mineral deposit for in-situ extraction of mineral values therefrom comprising the steps of: selecting a portion of said deposit for processing; providing an outlet in communication with an area defining a base of said selected portion of said deposit; providing an inlet communicating with said selected portion at a point spaced from said outlet so that said portion lies substantially between said inlet and said outlet; breaking said portion of said deposit into rubble defining a permeable zone extending between said inlet and said outlet and increasing in permeability from said inlet to said outlet so that the process of extraction may be initiated at the inlet and the extracted minerals transported through high permeability area to the outlet.
Claim 14
Independent Claim
125 words
A method of preparing a subterranean mineral deposit for in-situ extraction of mineral values therefrom comprising the steps of: selecting a portion of said deposit for processing; providing an outlet in communication with an area defining a base of said selected portion of said deposit; providing an inlet communicating with said selected portion at a point spaced from said outlet so that said portion lies substantially between said inlet and said outlet; breaking said portion of said deposit into rubble defining a permeable zone extending between said inlet and said outlet and increasing in permeability from said inlet to said outlet so that the process of extraction may be initiated at the inlet and the extracted minerals transported through high permeability area to the outlet.
Claim 15
Dependent Claim
61 words
The method of claim 12 including the steps of undercutting said portion of said deposit to thereby define said base; and explosively breaking overlying portions of said deposit into said undercut by predetermined placement of explosives thereby forming rubble having a gradation of size to provide increasingly larger interconnected voids from said inlet to said outlet to define said increasing permeability.
Claim 16
Dependent Claim
18 words
The method of claim 13 including the step of sloping the floor of said undercut toward said outlet.
Claim 17
Dependent Claim
31 words
The method of claim 13 including providing communicating means for initiating a process of extraction of minerals from said broken portion of said formation at the area of low permeability thereof.
Claim 18
Dependent Claim
29 words
The method of claim 15 comprising orienting said zone of permeability horizontally so that a process of extraction can be carried out horizontally from said inlet to said outlet.
Claim 19
Dependent Claim
31 words
The method of claim 16 wherein the step of undercutting includes the step of shaping said undercut to have an increasing volume of space progressing from said inlet to said outlet.
Claim 20
Dependent Claim
24 words
The method of claim 16 wherein the step of undercutting includes removing from 0.5% to 25% of the overlying selected portion of said deposit.
Claim 21
Dependent Claim
52 words
The method of claim 18 wherein said mineral deposit is selected to have a thickness of between 20 and 500 feet; and the step of selecting said portion includes selecting a portion having a width of from 1/2 to 2 times the thickness and a minimum length of 21/2 times the height.
Claim 22
Dependent Claim
21 words
The method of claim 19 comprising selecting said length of said portion to be from 2 to 10 times the width.
Claim 23
Dependent Claim
29 words
The method of claim 19 comprising the step of initiating an extraction process in the area of the communication of said inlet with said selected portion of said formation.
Claim 24
Dependent Claim
35 words
The process of claim 21 wherein said step of selecting said deposit comprises: selecting said deposit from the group consisting of oil shale, oil tars, oil sands, tar sands, gilsonite, black shales, lignite, and coal.
Claim 25
Dependent Claim
29 words
The process of claim 22 comprising the steps of: forming a cluster of adjacent retorts separated by thin wall partition pillars; and processing said cluster of adjacent retorts simultaneously.
Claim 26
Dependent Claim
19 words
The process of claim 23 comprising the step of: partially removing said partition pillars for inclusion into said processing.
Claim 27
Dependent Claim
19 words
The process of claim 24 comprising the step of explosively removing said partition pillars for inclusion into said process.
Claim 28
Dependent Claim
230 words
A process for the in-situ recovery of carbonaceous values from subterranean deposits which comprises the steps of: selecting a portion of said carbonaceous deposit as an in-situ retort by establishing confining barriers within which the process is to occur; establishing communication with the base of the subterranean deposit; undercutting at least at the base of said deposit to remove from 0.5 percent to 25 percent by volume of said deposit thereby leaving an overlying deposit supported by pillars and a void into which said overlying deposit can be broken; providing said void with a source inlet and an outlet spaced from said inlet, and said void being shaped to have minimum space at said inlet and expanding to a maximum at said outlet; breaking said overlying carbonaceous deposit to provide a rubblized particulate mass having a void volume approximately equal to the volume of said undercut; said breaking being carried out in a manner to provide a gradation of rubble size from a minimum size at a point at least halfway to said inlet from said outlet to a maximum size at said outlet; providing conduit means for communicating reacting fluids for initiating and controlling a combustion process within said rubble; initiating a combustion process near the inlet and controlling said combustion for driving carbonaceous values to said outlet; and withdrawing said carbonaceous values from said deposit at said outlet.
Claim 29
Dependent Claim
230 words
A process for the in-situ recovery of carbonaceous values from subterranean deposits which comprises the steps of: selecting a portion of said carbonaceous deposit as an in-situ retort by establishing confining barriers within which the process is to occur; establishing communication with the base of the subterranean deposit; undercutting at least at the base of said deposit to remove from 0.5 percent to 25 percent by volume of said deposit thereby leaving an overlying deposit supported by pillars and a void into which said overlying deposit can be broken; providing said void with a source inlet and an outlet spaced from said inlet, and said void being shaped to have minimum space at said inlet and expanding to a maximum at said outlet; breaking said overlying carbonaceous deposit to provide a rubblized particulate mass having a void volume approximately equal to the volume of said undercut; said breaking being carried out in a manner to provide a gradation of rubble size from a minimum size at a point at least halfway to said inlet from said outlet to a maximum size at said outlet; providing conduit means for communicating reacting fluids for initiating and controlling a combustion process within said rubble; initiating a combustion process near the inlet and controlling said combustion for driving carbonaceous values to said outlet; and withdrawing said carbonaceous values from said deposit at said outlet.
Claim 30
Dependent Claim
38 words
The process of claim 26 wherein said source inlet is established at the top of said retort and said combustion process is initiated at said top at said inlet so that said process progresses downward to said outlet.
Claim 31
Independent Claim
132 words
A method of preparing a subterranean mineral deposit for in-situ extraction of mineral values therefrom comprising the steps of: selecting a portion of said deposit for processing; providing an outlet in communication with an area defining a base of said selected portion of said deposit; providing an inlet communicating with said selected portion at a point spaced from said outlet so that said portion lies substantially between said inlet and said outlet; breaking said portion of said deposit into rubble defining a zone of permeability extending between a point at least halfway to said inlet from said outlet and increasing in permeability from said point to said outlet so that the process of extraction may be initiated at the inlet and the extracted minerals transported through high permeability area to the outlet.
Claim 32
Independent Claim
132 words
A method of preparing a subterranean mineral deposit for in-situ extraction of mineral values therefrom comprising the steps of: selecting a portion of said deposit for processing; providing an outlet in communication with an area defining a base of said selected portion of said deposit; providing an inlet communicating with said selected portion at a point spaced from said outlet so that said portion lies substantially between said inlet and said outlet; breaking said portion of said deposit into rubble defining a zone of permeability extending between a point at least halfway to said inlet from said outlet and increasing in permeability from said point to said outlet so that the process of extraction may be initiated at the inlet and the extracted minerals transported through high permeability area to the outlet.
Claim 33
Dependent Claim
61 words
The method of claim 28 including the steps of undercutting said portion of said deposit to thereby define said base; and explosively breaking overlying portions of said deposit into said undercut by predetermined placement of explosives thereby forming rubble having a gradation of size to provide increasingly larger interconnected voids from said point to said outlet to define said increasing permeability.
Claim 34
Dependent Claim
29 words
The method of claim 29 comprising orienting said zone of permeability vertically so that a process of extraction can be carried out vertically from said inlet to said outlet.