Claims Analysis
Total Claims: 13
Claim 1
Independent Claim
269 words
A method operable for evaluating pressure profile of material flowing to a mold cavity and thereby determining the quality of a part being molded during a given cycle of operation of a molding machine while the given cycle of operation is in process comprising the steps of: a. establishing the location of a first point comprising one end of a segment of the actual profile curve produced by the pressure of the material flowing to the mold cavity of the molding machine during the given cycle of operation thereof; b. establishing the location of a second point comprising the other end of the segment of the actual profile curve produced by the pressure of the material flowing to the mold cavity of the molding machine during the given cycle of operation thereof; c. determining the value of the slope of the segment of the actual profile curve defined by the location therealong of the first and second points; d. providing the value of the slope of the corresponding segment of the theoretical profile curve produced by the pressure of the material flowing to the mold cavity of the molding machine when a part of acceptable quality is molded during a cycle of operation thereof; and e. comparing the value of the slope of the segment of the actual profile curve to the value of the slope of the corresponding segment of the theoretical profile curve for purposes of detecting the existence of any significant difference therebetween indicative of the fact that the part being molded during the given cycle of operation of the molding machine is of unacceptable quality.
Claim 2
Independent Claim
269 words
A method operable for evaluating pressure profile of material flowing to a mold cavity and thereby determining the quality of a part being molded during a given cycle of operation of a molding machine while the given cycle of operation is in process comprising the steps of: a. establishing the location of a first point comprising one end of a segment of the actual profile curve produced by the pressure of the material flowing to the mold cavity of the molding machine during the given cycle of operation thereof; b. establishing the location of a second point comprising the other end of the segment of the actual profile curve produced by the pressure of the material flowing to the mold cavity of the molding machine during the given cycle of operation thereof; c. determining the value of the slope of the segment of the actual profile curve defined by the location therealong of the first and second points; d. providing the value of the slope of the corresponding segment of the theoretical profile curve produced by the pressure of the material flowing to the mold cavity of the molding machine when a part of acceptable quality is molded during a cycle of operation thereof; and e. comparing the value of the slope of the segment of the actual profile curve to the value of the slope of the corresponding segment of the theoretical profile curve for purposes of detecting the existence of any significant difference therebetween indicative of the fact that the part being molded during the given cycle of operation of the molding machine is of unacceptable quality.
Claim 3
Dependent Claim
55 words
The method as set forth in claim 1 further comprising the step of effecting correctional adjustments in the controls of the molding machine when the value of the slope of the segment of the actual profile curve is found to be significantly different from the slope of the corresponding segment of the theoretical profile curve.
Claim 4
Dependent Claim
34 words
The method as set forth in claim 2 wherein the step of effecting correctional adjustments in the controls of the molding machine is performed during the given cycle of operation of the molding machine.
Claim 5
Dependent Claim
40 words
The method as set forth in claim 2 wherein the step of effecting correctional adjustments in the controls of the molding machine is performed during the cycle of operation of the molding machine succeeding the given cycle of operation thereof.
Claim 6
Dependent Claim
36 words
The method as set forth in claim 1 wherein the segment of the actual profile curve established by the location of the first and second points lies along the rising portion of the actual profile curve.
Claim 7
Dependent Claim
36 words
The method as set forth in claim 1 wherein the segment of the actual profile curve established by the location of the first and second points lies along the falling portion of the actual profile curve.
Claim 8
Dependent Claim
36 words
The method as set forth in claim 1 wherein the location of the first point is established by determining in a Cartesian coordinate system the value for the ordinate and the abscissa of the first point.
Claim 9
Dependent Claim
36 words
The method as set forth in claim 7 wherein the ordinate of the first point is a function of the pressure in the mold cavity and has a value equal to a predetermined first pressure level.
Claim 10
Dependent Claim
77 words
The method as set forth in claim 8 wherein the abscissa of the first point is a function of time and has a value equal to the elapsed time between when the start of the given cycle of operation of the molding machine is initiated and the point in time when the pressure in the mold cavity during the given cycle of operation of the molding machine reaches a level equivalent to the predetermined first pressure level.
Claim 11
Dependent Claim
36 words
The method as set forth in claim 9 wherein the location of the second point is established by determining in a Cartesian coordinate system the value for the ordinate and the abscissa of the second point.
Claim 12
Dependent Claim
36 words
The method as set forth in claim 10 wherein the ordinate of the second point is a function of the pressure in the mold cavity and has a value equal to a predetermined second pressure level.
Claim 13
Dependent Claim
93 words
The method as set forth in claim 11 wherein the abscissa of the second point is a function of time and has a value equal to the elapsed time between the point in time when the pressure in the mold cavity during the given cycle of operation of the molding machine reaches a level equal to the predetermined first pressure level and the point in time when the pressure in the mold cavity during the given cycle of operation of the molding machine reaches a level equal to the predetermined second pressure level.