Claim 1
Independent Claim
46 words
A method of installing a floating structure over a location on the floor of a water-covered area in which the floating structure is anchored only by essentially parallel and vertical members under tension, which comprises: a. positioning said structure and a gravity base over said location;
Claim 2
Independent Claim
46 words
A method of installing a floating structure over a location on the floor of a water-covered area in which the floating structure is anchored only by essentially parallel and vertical members under tension, which comprises: a. positioning said structure and a gravity base over said location;
Claim 3
Dependent Claim
102 words
b. lowering said gravity base from said floating structure with cables to said floor while maintaining said floating structure in a positive buoyancy state; c. after said gravity base is in engagement with said floor, lowering riser pipes and securing the lower ends to a fixed position with respect to said ocean bottom; d. securing the upper ends of said riser pipes to said floating structure; and e. placing said riser pipes under tension and removing the tension from said cables so that said cables can be removed and then removing the cables from between said floating structure and said gravity base.
Claim 4
Dependent Claim
102 words
b. lowering said gravity base from said floating structure with cables to said floor while maintaining said floating structure in a positive buoyancy state; c. after said gravity base is in engagement with said floor, lowering riser pipes and securing the lower ends to a fixed position with respect to said ocean bottom; d. securing the upper ends of said riser pipes to said floating structure; and e. placing said riser pipes under tension and removing the tension from said cables so that said cables can be removed and then removing the cables from between said floating structure and said gravity base.
Claim 5
Dependent Claim
52 words
A method as defined in claim 1, including the steps of: f. providing a plurality of separate groups of risers spaced from each other, each group having a plurality of risers therein; and g. providing spacers supported on cables for the risers along the vertical length of each group at selected intervals.
Claim 6
Dependent Claim
73 words
A method as defined in claim 1, including after the gravity base is positioned on said floor the steps of h. inserting a large-diameter drive pipe through a receiving passage in said gravity base into the soil beneath the gravity base; i. and then inserting the lower end of said riser into said drive pipe; and j. repeating steps (h) and (i) for each riser selected to anchor the structure to the base.
Claim 7
Dependent Claim
43 words
A method as defined in claim 2 in which said spacers are positioned on top of the gravity base and lowered with the gravity base, then raising the spacers off the gravity base one by one to a level selected for each spacer.
Claim 8
Dependent Claim
23 words
A method as defined in claim 2 in which: said spacers are lowered by cables at spaced intervals prior to lowering said risers.
Claim 9
Dependent Claim
17 words
A method as defined in claim 5, including the step of securing the spacers to said risers.
Claim 10
Dependent Claim
20 words
A method as defined in claim 6 in which the step (h) said drive pipe is jetted into the bottom.
Claim 11
Dependent Claim
17 words
A method as defined in claim 4 including the step of securing said spacers to said risers.
Claim 12
Independent Claim
311 words
A method of installing a floating structure for a well site in which the floating structure comprises a plurality of buoyant bottle-shaped members in which each said bottle-shaped member is to be anchored to a gravity base section having drive-pipe ports therethrough only by essentially parallel and vertical risers under tension, which comprises: a. placing a plurality of riser spacer members on each said gravity base; b. releasably securing a gravity base to each said bottle-shaped member for supporting same; c. positioning said structure, said gravity bases and spacer members over a subsea well site; d. lowering said gravity bases and said spacers to said subsea well site from said floating structure with cables while maintaining said floating structure in a positive buoyancy state sufficient to support said base as it is being lowered; e. inserting a drive pipe through each drive pipe port in said gravity base section and securing same to said gravity base section; f. drilling a hole down through said drive pipe for a marine conductor; g. running said marine conductor; h. connecting each said marine conductor to said drive pipe; i. cementing said marine conductor; j. repeating operations (e) through (i) for each drive pipe and marine conductor installed on each gravity base; k. lowering at least one riser down through each said bottle-shaped member and into engagement with a marine conductor; l. securing the lower end of each said riser to its respective marine conductor; m. connecting the upper end of each said riser with its respective said bottle-shaped member and applying tension to said risers; n. relieving the tension on said cables; o. removing the cables from between said structure and said gravity bases; and p. positioning spacers at selected elevations along the riser and then securing the spacer at each level to said riser pipe between the gravity base and the bottle-shaped members.
Claim 13
Independent Claim
311 words
A method of installing a floating structure for a well site in which the floating structure comprises a plurality of buoyant bottle-shaped members in which each said bottle-shaped member is to be anchored to a gravity base section having drive-pipe ports therethrough only by essentially parallel and vertical risers under tension, which comprises: a. placing a plurality of riser spacer members on each said gravity base; b. releasably securing a gravity base to each said bottle-shaped member for supporting same; c. positioning said structure, said gravity bases and spacer members over a subsea well site; d. lowering said gravity bases and said spacers to said subsea well site from said floating structure with cables while maintaining said floating structure in a positive buoyancy state sufficient to support said base as it is being lowered; e. inserting a drive pipe through each drive pipe port in said gravity base section and securing same to said gravity base section; f. drilling a hole down through said drive pipe for a marine conductor; g. running said marine conductor; h. connecting each said marine conductor to said drive pipe; i. cementing said marine conductor; j. repeating operations (e) through (i) for each drive pipe and marine conductor installed on each gravity base; k. lowering at least one riser down through each said bottle-shaped member and into engagement with a marine conductor; l. securing the lower end of each said riser to its respective marine conductor; m. connecting the upper end of each said riser with its respective said bottle-shaped member and applying tension to said risers; n. relieving the tension on said cables; o. removing the cables from between said structure and said gravity bases; and p. positioning spacers at selected elevations along the riser and then securing the spacer at each level to said riser pipe between the gravity base and the bottle-shaped members.
Claim 14
Dependent Claim
46 words
A method as defined in claim 9 which includes: adding additional ballasting to the said gravity base after it is on bottom; and in which the step of applying tension to said risers includes the step of deballasting the structure after said cables have been removed.