Abstract

Abstract There is shown the preforming of walls and floor slabs as a stack wherein the walls of each story are connected to the next floor slab thereabove by lift pickup cables spaced along the to be top edge of each wall. Lift apparatus forming no part of the building is provided for attaching lift fixtures to elements cast in the edges of the floor slabs. The lift apparatus includes pairs of columns as necessary supporting a repositionable upward bridge therebetween having lifting jacks operating lift rods connected with the floor slabs below by the removable lift fixtures. The whole stack is lifted and starting with the first floor the ceiling slab lifts the walls therebelow which swing out and are guided into position under the slab thereabove and become load bearing walls. Successive like lifts are made to position the respective ceiling slabs and load bearing walls. Suitable vertically aligned apertures are formed in the walls and slabs above for installation of reinforcing rods.

Inventors

  • 👤 Pablo Ortega Cortina

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-05 04:42
CPC Classifications
E; E04; E04G; E04G21/00; E04G21/14; E04G21/16; E04B; E04B1/00; E04B1/35; E04B1/3533; E04B1/3538; E04G21/167; E04G21/168

Claims Analysis

Total Claims: 6
Claim 1
Independent Claim 392 words
Apparatus for erecting single or multiple story concrete columnless buildings, said apparatus comprising: a permanent base for a building to be erected, said base providing a first casting bed; a first set of load supporting, downwardly swingable wall panels positioned generally horizontally on said first casting bed; filler material in any voids in or between said wall panels to provide a second casting bed; a first floor slab positioned generally horizontally on said second casting bed and lying directly above said first set of wall panels; lift attaching members secured to the periphery of said first floor slab; a plurality of spaced apart, flexible pick-up cables connected along a pivot line between said wall panels and said floor slab to pivotally connect said wall panels to said floor slab thereby forming an interconnected first set of wall panels and corresponding floor slab; additional sets of wall panels and floor slabs positioned one above the other in layers to provide a stack of said wall panels and floor slabs corresponding to the stories of the building, each layer utilizing the preceding layer as a casting bed; lift attaching members secured to each of said additional floor slabs; pairs of temporary spaced columns positioned exteriorly of said base and adjacent said lift attaching members, said columns being of slightly greater height than the height of the erected building; a bridge member movably supported between each said pair of columns, each of said bridge members extending over said stack of wall panels and floor slabs and carrying lift means adjacent each column; lift fixture assemblies attachable to, and extending between, said lift attaching members on said floor slabs and said lift means, and disconnectable from said lift attachings members of each floor once said floor has been erected; means for actuating said lift means to raise said stack whereby each of the wall panels in said first set of wall panels will swing downwardly on said pick-up cables about said pivot lines to a vertical, load supporting position and further whereby said additional sets of wall panels and floor slabs are sequentially raised by said interconnected lift means, lift fixture assemblies and lift attaching members so that succeeding sets of wall panels swing into position to erect the additional stories of said building whereupon said temporary columns and said bridge members are dismantled and removed.
Claim 2
Dependent Claim 392 words
Apparatus for erecting single or multiple story concrete columnless buildings, said apparatus comprising: a permanent base for a building to be erected, said base providing a first casting bed; a first set of load supporting, downwardly swingable wall panels positioned generally horizontally on said first casting bed; filler material in any voids in or between said wall panels to provide a second casting bed; a first floor slab positioned generally horizontally on said second casting bed and lying directly above said first set of wall panels; lift attaching members secured to the periphery of said first floor slab; a plurality of spaced apart, flexible pick-up cables connected along a pivot line between said wall panels and said floor slab to pivotally connect said wall panels to said floor slab thereby forming an interconnected first set of wall panels and corresponding floor slab; additional sets of wall panels and floor slabs positioned one above the other in layers to provide a stack of said wall panels and floor slabs corresponding to the stories of the building, each layer utilizing the preceding layer as a casting bed; lift attaching members secured to each of said additional floor slabs; pairs of temporary spaced columns positioned exteriorly of said base and adjacent said lift attaching members, said columns being of slightly greater height than the height of the erected building; a bridge member movably supported between each said pair of columns, each of said bridge members extending over said stack of wall panels and floor slabs and carrying lift means adjacent each column; lift fixture assemblies attachable to, and extending between, said lift attaching members on said floor slabs and said lift means, and disconnectable from said lift attachings members of each floor once said floor has been erected; means for actuating said lift means to raise said stack whereby each of the wall panels in said first set of wall panels will swing downwardly on said pick-up cables about said pivot lines to a vertical, load supporting position and further whereby said additional sets of wall panels and floor slabs are sequentially raised by said interconnected lift means, lift fixture assemblies and lift attaching members so that succeeding sets of wall panels swing into position to erect the additional stories of said building whereupon said temporary columns and said bridge members are dismantled and removed.
Claim 3
Dependent Claim 42 words
The apparatus of claim 1 further including stabilizing means connectable between each said column and each said floor slab once the floor slab has been positioned atop a corresponding set of downwardly swung panels whereby short effective working length columns are provided.
Claim 4
Dependent Claim 39 words
The apparatus of claim 1 further including aligned vertical apertures in each of said wall panels and corresponding apertures in said floor slabs whereby reinforcing bars may be inserted and grouted in said apertures once said building is erected.
Claim 5
Dependent Claim 82 words
The apparatus of claim 1 wherein each said pick-up cable comprises diverging double-stranded cables between said wall panels and said floor slabs, said strands converging at said pivot lines whereby the weight of each wall panel will be transferred from one to the other strand of each of its pick-up cables as the wall panels are swung toward the vertical, said cables permitting spauling of said panels along said pivot lines to compensate for slight pivot line misalignment or for slab deflection.
Claim 6
Dependent Claim 177 words
The apparatus of claim 1 further wherein each of said lift fixture assemblies comprises, in combination, a first lift fixture having a crosshead for attachment of lift rods connectable to said lift means on said bridge members, a first tension bar depending from said crosshead, means adjacent a lower end of said first tension bar for attaching said first lift fixture to said lift attaching member of an uppermost floor slab, and means on said tension bar for attachment of a second lift fixture; said second lift fixture having a second tension bar, means on said second tension bar for engagement with said first lift fixture, means adjacent a lower end of said second tension bar for attaching said second lift fixture to said lift attaching member of a second floor slab and means on said second tension bar for attachment of subsequent lift attaching fixtures whereby a number of lift fixtures corresponding to the number of said floor slabs are interconnectable to each other and to said floor slabs to provide each said lift fixture assembly.

References Cited (Backward Citations)

US1362069A Cited
US2720017A Cited
US2964143A Cited
US3036816A Cited
US3053015A Cited
US3494092A Cited
US3789455A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1979-08-17 1980-02-16 1980-08-17 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1983-08-17 1984-02-16 1984-08-17 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1987-08-17 1988-02-16 1988-08-17 $7700.00 Window Closed / Lapsed