Claims Analysis
Total Claims: 6
Claim 1
Independent Claim
256 words
The method of remote cement lining of a deep, large diameter, borehole in the earth, filled with drilling fluid, comprising the steps of: a. providing a base on which said lining is to be supported at a selected distance above the bottom of said borehole, said base having an inner diameter which is the same as that of the finished liner, and means to seal against the wall of said borehole; b. providing a slip form means, with support conduit means to support said slip form, the outer diameter equal to the internal diameter of said liner, said support conduit connected by pipes through the cylindrical wall of said slip form at one or more openings near the bottom, and at one or more openings near the top of said cylindrical wall; c. attaching said base to said slip form with shearable fastening means, and lowering said slip form into the borehole until said base rests on the bottom of the borehole; d. pumping cement down through said support conduit means and through said bottom openings, and into the space above said base; e. allowing time for said cement to set; f. lifting said slip form and breaking said shear fastenings; and g. slowly continuously lifting said slip form, while pumping cement through said top openings, the rate of pumping and the rate of lifting being adjusted so that the cement liner is supported at each level, by said slip form, for a time greater than the time for the cement to have a first set.
Claim 2
Independent Claim
256 words
The method of remote cement lining of a deep, large diameter, borehole in the earth, filled with drilling fluid, comprising the steps of: a. providing a base on which said lining is to be supported at a selected distance above the bottom of said borehole, said base having an inner diameter which is the same as that of the finished liner, and means to seal against the wall of said borehole; b. providing a slip form means, with support conduit means to support said slip form, the outer diameter equal to the internal diameter of said liner, said support conduit connected by pipes through the cylindrical wall of said slip form at one or more openings near the bottom, and at one or more openings near the top of said cylindrical wall; c. attaching said base to said slip form with shearable fastening means, and lowering said slip form into the borehole until said base rests on the bottom of the borehole; d. pumping cement down through said support conduit means and through said bottom openings, and into the space above said base; e. allowing time for said cement to set; f. lifting said slip form and breaking said shear fastenings; and g. slowly continuously lifting said slip form, while pumping cement through said top openings, the rate of pumping and the rate of lifting being adjusted so that the cement liner is supported at each level, by said slip form, for a time greater than the time for the cement to have a first set.
Claim 3
Dependent Claim
124 words
The method as in claim 1 including the steps of: h. discontinuing the pumping of cement as in step (g) when the level of cement has reached a point below the level of an aquifer; i. lifting said slip form out of the borehole; j. lowering by means of a plurality of small pipes a section of casing of a diameter at least equal to the inner diameter of said cement liner, said casing of vertical extent sufficient to reach to a level above said aquifer; k. lowering said slip form into the borehole and into said casing; l. pumping cement through said top openings until the space between said casing and the borehole wall is filled with cement; and m. repeating step (g).
Claim 4
Dependent Claim
66 words
The method as in claim 2 including, after step (j) and before step (k) of: n. using said plurality of pipes which had been used to lower said casing, pumping cement down said pipes to a point near the bottom of said casing until the space behind said casing is filled with cement; o. stopping said pumping and removing said pipes; and p. repeating steps (g).
Claim 5
Dependent Claim
150 words
The method as in claim 1 including after step (b) the steps of: q. providing a pan, comprising a section of casing of selected length, with stiffening means, and means at top and bottom to seal between said pan and the wall of said borehole; r. attaching a plurality of pipes to said pan in the annulus between said inner wall and the wall of said borehole; s. attaching said pipes to said base so that when said base is on bottom, said pan will be at a selected depth, corresponding to the position of an aquifer, said pipes perforated in the space behind said pan; t. running said base, said pipes, said pan, and additional pipes until said base is on bottom and said an is opposite said aquifer; u. lowering said slip form so that it is in position adjacent said base; and v. continuing with step (d).
Claim 6
Dependent Claim
43 words
The method as in claim 4 including: the step of attaching a conduit means to the bottom ends of said pipes and pumping cement into and up said pipes until the space between said pan and said borehole wall is filled with cement.