← Back to Patent Explorer
US3957937A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for curing concrete products

Assignee: Cyclamatic Inc
•
Filing: 1974-04-23
•
Granted: 1976-05-18
•
Expires: 1994-04-23
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract This invention relates to a method for curing concrete products. The method comprises the steps of subjecting the products to be cured to a steam of a given temperature to produce partial hydration of the products, then subjecting the products to steam of a different temperature, and finally subjecting the products to cooled air, all for predetermined periods of time.

Inventors

  • 👤 Paul W. Lovell

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-04 05:26
CPC Classifications
B; B28; B28B; B28B11/00; B28B11/24; B28B11/245; C; C04; C04B; C04B40/00; C04B40/02; C04B40/024; F; F27; F27B; F27B9/00; F27B9/14; F27B9/16; Y; Y10; Y10S; Y10S264/00; Y10S264/43

Claims Analysis

Total Claims: 6
Claim 1
Independent Claim 387 words
The method of rapidly curing concrete products in a machine including a circular, endless tunnel having a circular track therein, a plurality of interconnected racks movably mounted upon the track for carrying a plurality of the products to be cured, means for rotating the racks in an indexing manner and in a timed manner hereinafter defined, each rack having a solid divider panel with a peripheral seal for coaction with each of a plurality of seals secured about the interior of the tunnel in arcuately spaced relation to form with each coaction a substantially hermetical sealed wall thereby forming a plurality of continuously formed hermetically sealed stations within the tunnel, the method comprising the steps: loading at least one of the products onto a first rack at a first station within the tunnel, said first station open to the atmosphere; moving the first rack to the next adjacent station within the tunnel, said next station being a second station automatically sealed by coaction of the rack seals with the tunnel seals, while repeating the loading action at the first station on a second rack; introducing a superheated steam and carbon dioxide into the second station and maintaining the temperature within said second station at a range of 175° to 250° F. for approximately 12 minutes; moving said first rack to a third automatically sealed station adjacent to said second station while simultaneously repeating the action at said previous stations; introducing a non-superheated steam into the third station and maintaining the temperature therein at a range of 195° to 200° F. for approximately 60 minutes; moving said first rack to a fourth automatically sealed station adjacent said third station while simultaneously repeating the actions at said previous stations; exposing the first rack in said fourth station to ambient air from external the tunnel for approximately 12 minutes; moving said first rack to a fifth automatically sealed station adjacent said fourth station while simultaneously repeating the actions at said previous stations; forcing ambient air from external the tunnel into said fifth station for approximately 3 minutes; moving said first rack to a sixth station adjacent said fifth station, said sixth station being exposed to the atmosphere; and unloading the rapidly cured products from the first rack at the sixth station, while simultaneously repeating the actions at said previous stations.
Claim 2
Independent Claim 387 words
The method of rapidly curing concrete products in a machine including a circular, endless tunnel having a circular track therein, a plurality of interconnected racks movably mounted upon the track for carrying a plurality of the products to be cured, means for rotating the racks in an indexing manner and in a timed manner hereinafter defined, each rack having a solid divider panel with a peripheral seal for coaction with each of a plurality of seals secured about the interior of the tunnel in arcuately spaced relation to form with each coaction a substantially hermetical sealed wall thereby forming a plurality of continuously formed hermetically sealed stations within the tunnel, the method comprising the steps: loading at least one of the products onto a first rack at a first station within the tunnel, said first station open to the atmosphere; moving the first rack to the next adjacent station within the tunnel, said next station being a second station automatically sealed by coaction of the rack seals with the tunnel seals, while repeating the loading action at the first station on a second rack; introducing a superheated steam and carbon dioxide into the second station and maintaining the temperature within said second station at a range of 175° to 250° F. for approximately 12 minutes; moving said first rack to a third automatically sealed station adjacent to said second station while simultaneously repeating the action at said previous stations; introducing a non-superheated steam into the third station and maintaining the temperature therein at a range of 195° to 200° F. for approximately 60 minutes; moving said first rack to a fourth automatically sealed station adjacent said third station while simultaneously repeating the actions at said previous stations; exposing the first rack in said fourth station to ambient air from external the tunnel for approximately 12 minutes; moving said first rack to a fifth automatically sealed station adjacent said fourth station while simultaneously repeating the actions at said previous stations; forcing ambient air from external the tunnel into said fifth station for approximately 3 minutes; moving said first rack to a sixth station adjacent said fifth station, said sixth station being exposed to the atmosphere; and unloading the rapidly cured products from the first rack at the sixth station, while simultaneously repeating the actions at said previous stations.
Claim 3
Dependent Claim 28 words
The method of claim 1, and further wherein the forced ambient air blown into the fifth sealed station is directed horizontally across the products in the rack therein.
Claim 4
Dependent Claim 41 words
The method of claim 1, and further wherein the step of introducing superheated steam and carbon dioxide into the second station comprises directing steam under pressure into a flame and directing the resultant steam of fine vapor into the second station.
Claim 5
Dependent Claim 44 words
The method of claim 1, and further wherein the first rack is moved from the unloading station to an area formed in the tunnel intermediate to unloading or loading stations, the area being open to both sides of the tunnel for personnel entry therethrough.
Claim 6
Dependent Claim 29 words
The method of claim 3, and further wherein the superheated steam and carbon dioxide introduced into the second station are directed away from direct contact with the products therein.

References Cited (Backward Citations)

US461888A Cited
US2575462A Cited
US2540354A Cited
US2496895A Cited
US2932874A Cited
US3238279A Cited
US3306961A Cited
US3468993A Cited
US3492385A Cited
US3545733A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1979-05-18 1979-11-17 1980-05-18 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1983-05-18 1983-11-17 1984-05-18 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1987-05-18 1987-11-17 1988-05-18 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag