US3945883A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Liquid metal cooled nuclear reactors
Assignee: United Kingdom Atomic Energy Authority
•
Filing: 1974-08-13
•
Granted: 1976-03-23
•
Expires: 1994-08-13
Abstract
Abstract A fast reactor core is submerged in a pool of liquid metal coolant and there is a catchment tray for falling fuel debris disposed beneath the core. The catchment tray comprises a complex of open top collecting vessels arranged on lattice pitches in layers, the lattice pitches of the layers being off-set to provide a complete catchment area.
Inventors
- 👤 John Richard Hind
- 👤 John Graham Durston
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-06 11:28
CPC Classifications
G; G21; G21C; G21C9/00; G21C9/016; Y; Y02; Y02E; Y02E30/00; Y02E30/30
Claims Analysis
Total Claims: 7
Claim 1
Independent Claim
144 words
A liquid cooled nuclear reactor construction comprising: a primary vessel containing a pool of liquid coolant, a nuclear reactor core submerged in the pool of liquid coolant, a catchment tray for collecting debris falling from the core, the catchment tray comprising a complex of open top collecting vessels having central support struts and a substructure for supporting the collecting vessels, the vessels being spaced apart and arranged in layers in lattice pitch, the lattice pitch of the vessels in each layer being off-set to the lattice pitches of the vessels in the other layers so that upper vessels partially overlap lower vessels, the support struts extending through interspaces defined by the vessels in off-set pitch to the supporting substructure, arranged so that the complex of vessels presents a complete catchment area to falling debris whilst being pervious to liquid coolant circulating upwardly by convection.
Claim 2
Dependent Claim
144 words
A liquid cooled nuclear reactor construction comprising: a primary vessel containing a pool of liquid coolant, a nuclear reactor core submerged in the pool of liquid coolant, a catchment tray for collecting debris falling from the core, the catchment tray comprising a complex of open top collecting vessels having central support struts and a substructure for supporting the collecting vessels, the vessels being spaced apart and arranged in layers in lattice pitch, the lattice pitch of the vessels in each layer being off-set to the lattice pitches of the vessels in the other layers so that upper vessels partially overlap lower vessels, the support struts extending through interspaces defined by the vessels in off-set pitch to the supporting substructure, arranged so that the complex of vessels presents a complete catchment area to falling debris whilst being pervious to liquid coolant circulating upwardly by convection.
Claim 3
Dependent Claim
34 words
A liquid cooled nuclear reactor construction according to claim 1 wherein the collecting vessels comprise conical dishes and are arranged in triangular lattice pitch in each layer, the complex comprising three layers of vessels.
Claim 4
Dependent Claim
36 words
A liquid cooled nuclear reactor construction according to claim 1 wherein the collecting vessels comprise rectilinear vessels and are arranged in square lattice pitch in each layer, the complex of vessels comprising at least three layers.
Claim 5
Dependent Claim
32 words
A liquid cooled nuclear reactor construction according to claim 1 wherein the complex of collecting vessels comprises at least one layer of conical dishes and at least one layer of rectilinear vessels.
Claim 6
Dependent Claim
25 words
A liquid cooled nuclear reactor construction according to claim 1 wherein the catchment tray comprises a plurality of complexes of collecting vessels in stacked array.
Claim 7
Dependent Claim
24 words
A liquid cooled nuclear reactor construction according to claim 2 wherein the reactor is a fast neutron reactor and the coolant is liquid metal.
References Cited (Backward Citations)
US3378452A
Cited
US3719556A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1979-03-23 | 1979-09-22 | 1980-03-23 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1983-03-23 | 1983-09-22 | 1984-03-23 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1987-03-23 | 1987-09-22 | 1988-03-23 | $7700.00 | Window Closed / Lapsed |