Claims Analysis
Total Claims: 10
Claim 1
Independent Claim
264 words
A method of assembling and erecting a cooling tower, especially a natural draft cooling tower of great height and diameter which has a light-weight mantle constituted by a skin attached to multiple cable grids and extending between a single central support column and a foundation, the assembly method comprising the steps of: constructing the central support column on a foundation as a free-standing structure to a height in excess of the intended height of the tower mantle; assembling on the ground, concentrically spaced from the central support column, a pressure ring constituting the upper rim of the tower mantle; positioning a lifting ring near the foot of said column so as to surround the latter with little clearance; attaching to the lifting ring a series of radially regularly spaced supporting cables connecting the lifting ring to the pressure ring for suspension of the latter from the former at a vertical distance substantially corresponding to the difference in height between the central support column and the tower mantle; attaching to the pressure ring the ends of at least two series of cables in a pattern of intersecting cable grids, designed to extend diagonally downwardly between the pressure ring and the foundation, to form a hyperboloid-shaped, composite cable grid as part of the tower mantle; advancing the lifting ring upwardly along the central support column, thereby raising the pressure ring which is connected thereto and extending the cable grids which are connected to the latter; and securing the lifting ring in relation to the central support column in the fully extended position of the tower mantle.
Claim 2
Independent Claim
264 words
A method of assembling and erecting a cooling tower, especially a natural draft cooling tower of great height and diameter which has a light-weight mantle constituted by a skin attached to multiple cable grids and extending between a single central support column and a foundation, the assembly method comprising the steps of: constructing the central support column on a foundation as a free-standing structure to a height in excess of the intended height of the tower mantle; assembling on the ground, concentrically spaced from the central support column, a pressure ring constituting the upper rim of the tower mantle; positioning a lifting ring near the foot of said column so as to surround the latter with little clearance; attaching to the lifting ring a series of radially regularly spaced supporting cables connecting the lifting ring to the pressure ring for suspension of the latter from the former at a vertical distance substantially corresponding to the difference in height between the central support column and the tower mantle; attaching to the pressure ring the ends of at least two series of cables in a pattern of intersecting cable grids, designed to extend diagonally downwardly between the pressure ring and the foundation, to form a hyperboloid-shaped, composite cable grid as part of the tower mantle; advancing the lifting ring upwardly along the central support column, thereby raising the pressure ring which is connected thereto and extending the cable grids which are connected to the latter; and securing the lifting ring in relation to the central support column in the fully extended position of the tower mantle.
Claim 3
Dependent Claim
45 words
A cooling tower assembly method as defined in claim 1, wherein the step of vertically advancing the lifting ring includes the step of vertically pre-stressing the cable grids of the tower mantle, prior to securing the lifting ring in relation to the central support column.
Claim 4
Dependent Claim
73 words
A cooling tower assembly method as defined in claim 2, further comprising the steps of: mounting a supporting flange on the upper end of the central support column; extending a plurality of vertical lifting cables between the supporting flange and the lifting ring; and pulling on the lifting cables, in order to perform the step of upwardly advancing the lifting ring as well as the pressure ring and mantle that are attached thereto.
Claim 5
Dependent Claim
54 words
A cooling tower assembly method as defined in claim 3, wherein the step of pulling on the lifting cables involves the use of hoisting means attached to the lifting ring, which hoisting means is capable of advancing the lifting ring upwardly against the lifting cables, the latter being fixedly attached to the supporting flange.
Claim 6
Dependent Claim
44 words
A cooling tower assembly method as defined in claim 3, wherein the step of pulling on the lifting cables involves the use of stationary hoisting means mounted on top of the supporting flange, which hoisting means is capable of advancing the lifting cables upwardly.
Claim 7
Dependent Claim
34 words
A cooling tower assembly method as defined in claim 5, wherein the step of securing the lifting ring involves permanently attaching the latter to the supporting ring on top of the central support column.
Claim 8
Dependent Claim
36 words
A cooling tower assembly method as defined in claim 1, wherein the step of upwardly advancing the lifting ring involves making interruptions in said advance, during which corresponding vertical increments of the tower mantle are assembled.
Claim 9
Dependent Claim
50 words
A cooling tower assembly method as defined in claim 7, wherein said incremental assembly of the tower mantle includes the clamping together of intersecting cables of said cable grids, so as to form cable polygons, and the attachment of constituent panels of the tower mantle skin to said cable polygons.
Claim 10
Dependent Claim
33 words
A cooling tower assembly method as defined in claim 7, wherein said incremental assembly of the tower mantle includes the unwinding of the constituent cables of the cable grids from mobile cable winches.