Abstract
Abstract A gas turbine power plant is provided with an industrial gas turbine which drives a generator coupled to a power system through a breaker. The turbine-generator plant is operated by a hybrid control system having digital function capability during sequenced startup, synchronizing, load buildup and steady state load, and shutdown operations. The control system also contains monitoring and protective subsystems which function through all stages of operation, with redundancy and permissive features which maximize turbine availability.
Inventors
- 👤 Robert A. Yannone
- 👤 James J. Shields
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-24 23:37
CPC Classifications
F; F02; F02C; F02C7/00; F02C7/26
Claims Analysis
Total Claims: 22
Claim 1
Independent Claim
226 words
A gas turbine electric power plant including a gas turbine having compressor, combustion and turbine elements, a generator coupled to said gas turbine for drive power, a generator breaker for coupling said generator to a power system so as to provide means for delivering power to the power system, a fuel system for supplying fuel to said gas turbine combustion element including control means for regulating the fuel flow as a function of a fuel scheduling control signal developed thereby, and a fuel scheduling control system for controlling the load accepted by said turbine, said fuel scheduling control system comprising: a. a first means for accepting turbine load at breaker closing of a predetermined minimum level; b. second means for automatically raising accepted turbine load from said minimum level to, and maintaining it at, one of a plurality of temperature limited turbine load levels, upon selection of one of said turbine load levels; c. third means for changing accepted turbine load from one of said temperature limited turbine load levels to another; and d. fourth means for interrupting changes in accepted turbine load and holding it at any available level, said first, second, third and fourth means being all cooperatively coupled to said fuel system and adapted to commensurately modify said fuel scheduling control signal developed thereby in accordance with the turbine load to be accepted.
Claim 2
Dependent Claim
226 words
A gas turbine electric power plant including a gas turbine having compressor, combustion and turbine elements, a generator coupled to said gas turbine for drive power, a generator breaker for coupling said generator to a power system so as to provide means for delivering power to the power system, a fuel system for supplying fuel to said gas turbine combustion element including control means for regulating the fuel flow as a function of a fuel scheduling control signal developed thereby, and a fuel scheduling control system for controlling the load accepted by said turbine, said fuel scheduling control system comprising: a. a first means for accepting turbine load at breaker closing of a predetermined minimum level; b. second means for automatically raising accepted turbine load from said minimum level to, and maintaining it at, one of a plurality of temperature limited turbine load levels, upon selection of one of said turbine load levels; c. third means for changing accepted turbine load from one of said temperature limited turbine load levels to another; and d. fourth means for interrupting changes in accepted turbine load and holding it at any available level, said first, second, third and fourth means being all cooperatively coupled to said fuel system and adapted to commensurately modify said fuel scheduling control signal developed thereby in accordance with the turbine load to be accepted.
Claim 3
Dependent Claim
39 words
The gas turbine electric power plant as set forth in claim 1 wherein said fuel scheduling control system includes means for limiting load at a level which is a function of temperature at at least one given turbine location.
Claim 4
Dependent Claim
34 words
The gas turbine electric power plant as set forth in claim 2 wherein said load limiting second means includes means for selecting said load level as any one of said temperature limited load levels.
Claim 5
Dependent Claim
118 words
The gas turbine electric power plant as set forth in claim 1 further comprising: a. first means for generating, upon command, a first control signal suitable for controlling fuel scheduling in accordance with a first schedule; b. second means for generating, upon command, a second control signal suitable for controlling fuel scheduling according to a second schedule; c. third means for generating at least one temperature limiting control signal; and d. means, operatively coupled to said first, second and third means for generating, for comparing said first control signal, said second control signal and at least one temperature limiting control signal and for selecting said fuel scheduling signal thereamongst in accordance with a predetermined relationship of said signals.
Claim 6
Dependent Claim
32 words
The gas turbine electric power plant as set forth in claim 4 wherein said second means for automatically raising turbine load includes means for commanding generation of one of said control signals.
Claim 7
Dependent Claim
38 words
The gas turbine electric power plant as set forth in claim 1, wherein said fuel scheduling system further comprises means for lower accepted turbine load to said minimum load level from one of said temperature limited load levels.
Claim 8
Dependent Claim
39 words
The gas turbine electric power plant as set forth in claim 6 further comprising means for initiating shutdown of said turbine, and means responsive thereto cancelling the turbine shutdown operation and returning the turbine to a selected load level.
Claim 9
Dependent Claim
50 words
The gas turbine electric power plant as set forth in claim 1 wherein said third means for changing load includes means for changing accepted turbine load at a selected one of a plurality of available load change rates, and means for changing said loading rate while load is being changed.
Claim 10
Dependent Claim
21 words
The gas turbine electric power plant as set forth in claim 8 wherein said means for changing load is manually operable.
Claim 11
Dependent Claim
26 words
The gas turbine electric power plant as set forth in claim 9 wherein said third means for changing load includes two loading synchros in tracking relationship.
Claim 12
Dependent Claim
28 words
The gas turbine electric power plant as set forth in claim 10 wherein said loading synchros produce pneumatic signals, and said fuel control signal is a pneumatic signal.
Claim 13
Dependent Claim
238 words
A gas turbine electric power plant including a gas turbine having compressor, combustion and turbine elements, a generator coupled to said gas turbine for drive power, a generator breaker for coupling said generator to a power system so as to provide means for delivering power to the power system, a fuel system for supplying fuel to said gas turbine combustion element including control means for regulating the fuel flow as a function of a fuel scheduling control signal developed thereby, and a fuel scheduling control system for controlling the load accepted by said turbine, said fuel scheduling control system comprising: a. first means for accepting turbine load at breaker closing of a predetermined minimum level; b. second means for raising accepted turbine load from said minimum level at a load change rate selectable from two different rates; c. third means for maintaining turbine load at one of a plurality of temperature limited turbine load levels, upon selection of one of said turbine load levels; d. fourth means for changing accepted turbine load from one of said temperature limited turbine load levels to another; and e. fifth means for interrupting changes in accepted turbine load and holding it at any available level, said first, second, third, fourth and fifth means being all cooperatively coupled to said fuel system and adapted to commensurately modify said fuel scheduling control signal developed thereby in accordance with the turbine load to be accepted.
Claim 14
Dependent Claim
238 words
A gas turbine electric power plant including a gas turbine having compressor, combustion and turbine elements, a generator coupled to said gas turbine for drive power, a generator breaker for coupling said generator to a power system so as to provide means for delivering power to the power system, a fuel system for supplying fuel to said gas turbine combustion element including control means for regulating the fuel flow as a function of a fuel scheduling control signal developed thereby, and a fuel scheduling control system for controlling the load accepted by said turbine, said fuel scheduling control system comprising: a. first means for accepting turbine load at breaker closing of a predetermined minimum level; b. second means for raising accepted turbine load from said minimum level at a load change rate selectable from two different rates; c. third means for maintaining turbine load at one of a plurality of temperature limited turbine load levels, upon selection of one of said turbine load levels; d. fourth means for changing accepted turbine load from one of said temperature limited turbine load levels to another; and e. fifth means for interrupting changes in accepted turbine load and holding it at any available level, said first, second, third, fourth and fifth means being all cooperatively coupled to said fuel system and adapted to commensurately modify said fuel scheduling control signal developed thereby in accordance with the turbine load to be accepted.
Claim 15
Dependent Claim
38 words
The gas turbine electric power plant as set forth in claim 12 wherein said fuel-scheduling control system includes means for limiting load at a level which is a function of temperature at at least one given turbine location.
Claim 16
Dependent Claim
34 words
The gas turbine electric power plant as set forth in claim 13 wherein said load limiting second means includes means for selecting said load level as any one of said temperature limited load levels.
Claim 17
Dependent Claim
118 words
The gas turbiine electric power plant as set forth in claim 12 comprising: a. first means for generating, upon command, a first control signal suitable for controlling fuel scheduling in accordance with a first schedule; b. second means for generating, upon command, a second control signal suitable for controlling fuel scheduling according to a second schedule; c. third means for generating at least one temperature limiting control signal; and d. means, operatively coupled to said first, second and third means for generating, for comparing said first control signal, said second control signal and at least one temperature limiting control signal and for selecting said fuel scheduling control signal thereamongst in accordance with a predetermined relationship of said signals.
Claim 18
Dependent Claim
25 words
The gas turbine electric power plant as set forth in claim 15 wherein said generated control signals and said fuel scheduling control signals are pneumatic.
Claim 19
Dependent Claim
31 words
The gas turbine electric power plant as set forth in claim 16 wherein said second means for raising turbine load includes means for commanding generation of one of said control signals.
Claim 20
Dependent Claim
39 words
The gas turbine electric power plant as set forth in claim 12 wherein said fuel scheduling control system further comprises means for lowering accepted turbine load to said minimum load level from one of said temperature limited load levels.
Claim 21
Dependent Claim
40 words
The gas turbine electric power plant as set forth in claim 18 further comprising means for initiating shutdown of said turbine, and means responsive thereto for cancelling the turbine shutdown operation and returning the turbine to a selected load level.
Claim 22
Dependent Claim
25 words
The gas turbine electric power plant as set forth in claim 19 wherein said third means for changing load includes two synchros in tracking relationship.
References Cited (Backward Citations)
US3098356A
Cited
US3243596A
Cited
US3325650A
Cited
US3382671A
Cited
US3340883A
Cited
US3630023A
Cited
US3639076A
Cited
US3662545A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1979-03-09 | 1979-09-08 | 1980-03-09 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1983-03-09 | 1983-09-08 | 1984-03-09 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1987-03-09 | 1987-09-08 | 1988-03-09 | $7700.00 | Window Closed / Lapsed |