← Back to Patent Explorer
US3920537A Expired / Lapsed US ⏱️ 0.0 years remaining

Process for on-stream decoking of vapor lines

Assignee: Toscopetro Corp
•
Filing: 1974-06-05
•
Granted: 1975-11-18
•
Expires: 1994-06-05
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Coke deposited in hydrocarbon vapor conduits as the result of hydrocarbon cracking operations is removed from the conduits without interrupting the cracking operation by periodically contacting the coke deposit with a jet of relatively cold high pressure water. The water is jetted against the coke deposit and in an amount sufficient to thermally shock and break up the coke deposit at a pressure in excess of about 5,000 psig.

Inventors

  • 👤 John H Walker

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 18:59
CPC Classifications
C; C10; C10G; C10G9/00; C10G9/14; C10G9/16; C10B; C10B43/00; C10B43/02; C10B43/08; Y; Y10; Y10S; Y10S585/00; Y10S585/949; Y10S585/95

Claims Analysis

Total Claims: 10
Claim 1
Independent Claim 70 words
A PROCESS OF REMOVING COKE DEPOSITS FROM HYDROCARBON VAPOR CONDUITS WHILE CONTINUOUSLY PASSING HYDROCARBON VAPORS THROUGH THE CONDUIT WHICH COMPRISES CONTACTING THE COKE DEPOSIT WITH A JET OF RELATIVELY HIGH PRESSURE WATER, SAID WATER BEING JETTED AT A PRESSURE IN EXCESS OF ABOUT 5,000 PSI, AND AT A RATE SUFFICIENT TO THERMALLY SHOCK THE CONTACTED COKE DEPOSIT, WHEREBY THE CONTACTED COKE IS BROKEN INTO PIECES AND BLOWN FROM THE CONDUIT.
Claim 2
Dependent Claim 70 words
A PROCESS OF REMOVING COKE DEPOSITS FROM HYDROCARBON VAPOR CONDUITS WHILE CONTINUOUSLY PASSING HYDROCARBON VAPORS THROUGH THE CONDUIT WHICH COMPRISES CONTACTING THE COKE DEPOSIT WITH A JET OF RELATIVELY HIGH PRESSURE WATER, SAID WATER BEING JETTED AT A PRESSURE IN EXCESS OF ABOUT 5,000 PSI, AND AT A RATE SUFFICIENT TO THERMALLY SHOCK THE CONTACTED COKE DEPOSIT, WHEREBY THE CONTACTED COKE IS BROKEN INTO PIECES AND BLOWN FROM THE CONDUIT.
Claim 3
Dependent Claim 23 words
The process as defined by claIm 1 wherein the water is jetted at a pressure of from about 6,000 to about 7,000 psi.
Claim 4
Dependent Claim 22 words
The process as defined by claim 1 wherein the water is jetted at a temperature of from about 50*F. to about 70*F.
Claim 5
Dependent Claim 25 words
The process as defined by claim 1 wherein the water is jetted at a rate of from about 30 to about 40 gallons per minute.
Claim 6
Dependent Claim 47 words
The process as defined by claim 1 wherein the water is jetted at a pressure of from about 6,000 to about 7,000 psi, at a temperature of from about 50*F. to about 70*F. and at a rate of from about 30 to about 40 gallons per minute.
Claim 7
Dependent Claim 29 words
The process as defined by claim 1 wherein the water is jetted at a pressure of about 6,500 psi and at a rate of about 35 gallons per minute.
Claim 8
Dependent Claim 31 words
The process as defined by claim 1 wherein the water is jetted at a pressure of at least about 5,500 psi and at a rate of about 35 gallons per minute.
Claim 9
Dependent Claim 21 words
The process as defined by claim 1 wherein the hydrocarbon vapor conduit is the cyclone discharge nozzle of a fluid coker.
Claim 10
Dependent Claim 56 words
The process as defined by claim 1 wherein the water is jetted into the cyclone discharge nozzle of a fluid coker at a pressure of from about 6,000 to about 7,000 psi, at a temperature of from about 50*F. to about 70*F. and at a rate of from about 30 to about 40 gallons per minute.

References Cited (Backward Citations)

US2326525A Cited
US2934489A Cited
US3592762A Cited
US3732123A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1978-11-17 1979-05-19 1979-11-18 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1982-11-17 1983-05-19 1983-11-18 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1986-11-17 1987-05-19 1987-11-18 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag