← Back to Patent Explorer
US3917348A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of developing permeable underground zones

Assignee: Atlantic Richfield Co
•
Filing: 1974-08-22
•
Granted: 1975-11-04
•
Expires: 1994-08-22
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A parallel array of generally horizontal access entries communicating with the surface extend at a level beneath the top of an underground ore body or deposit. Zone entries are driven transversely from each access entry at this level, penetrating the deposit. A plurality of short crosscuts are driven in turn from each zone entry so that in combination each such zone entry and its associated crosscuts define a cavity of predetermined areal extent. The deposit overlaying each cavity is partially supported by the ribs which separate adjacent crosscuts and which project into the cavity from its side walls. Upon removal of these ribs, designated blocks of each of the overlaying deposits may be expanded into their associated undercutting cavities to form a series of adjacent permeable zones.

Inventors

  • 👤 Albert T Janssen

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 20:20
CPC Classifications
E; E21; E21C; E21C41/00; E21C41/16; E21C41/24

Claims Analysis

Total Claims: 16
Claim 1
Independent Claim 90 words
A method of developing a permeable zone within an underground mineral deposit comprising the steps of: a. driving an access entry at a level below the top of the deposit, b. driving a zone entry transversely from said access entry at said level into the deposit, c. drivIng a plurality of crosscuts from said zone entry to form in combination with said zone entry a cavity undercutting the deposit, and d. expanding a designated block of the deposit overlaying said cavity to fill said cavity and form said permeable zone.
Claim 2
Independent Claim 90 words
A method of developing a permeable zone within an underground mineral deposit comprising the steps of: a. driving an access entry at a level below the top of the deposit, b. driving a zone entry transversely from said access entry at said level into the deposit, c. drivIng a plurality of crosscuts from said zone entry to form in combination with said zone entry a cavity undercutting the deposit, and d. expanding a designated block of the deposit overlaying said cavity to fill said cavity and form said permeable zone.
Claim 3
Dependent Claim 30 words
A method as in claim 1 wherein said plurality of crosscuts are spaced apart to form a series of ribs projecting into said cavity and partially supporting the overlaying deposit.
Claim 4
Dependent Claim 22 words
A method as in claim 1 wherein said crosscuts extend along approximately parallel equidistant paths on both sides of said zone entry.
Claim 5
Dependent Claim 13 words
A method as in claim 1 wherein said deposit is a carbonaceous material.
Claim 6
Dependent Claim 11 words
The method of claim 1 wherein said deposit is oil shale.
Claim 7
Independent Claim 163 words
A method of developing a mining layout of multiple adjacent permeable zones within an underground deposit comprising the steps of: a. driving at least one access entry at a level within the deposit, said at least one access entry being in communication with the surface at at least one of its ends; b. driving a plurality of spaced apart zone entries transversely from said at least one access entry at said level, said zone entries penetrating said deposit and terminating therein; c. driving at least two spaced apart crosscuts from each of said zone entries into said deposit and terminating therein so that said at least two crosscuts in combination with a respective one of said plurality of zone entries form a cavity of predetermined areal extent undercutting said deposit, thereby forming a plurality of separate adjacent cavities separately undercutting said deposit; and d. expanding designated blocks of said deposit respectively overlaying said separate cavities into said cavities to form said permeable zones.
Claim 8
Independent Claim 163 words
A method of developing a mining layout of multiple adjacent permeable zones within an underground deposit comprising the steps of: a. driving at least one access entry at a level within the deposit, said at least one access entry being in communication with the surface at at least one of its ends; b. driving a plurality of spaced apart zone entries transversely from said at least one access entry at said level, said zone entries penetrating said deposit and terminating therein; c. driving at least two spaced apart crosscuts from each of said zone entries into said deposit and terminating therein so that said at least two crosscuts in combination with a respective one of said plurality of zone entries form a cavity of predetermined areal extent undercutting said deposit, thereby forming a plurality of separate adjacent cavities separately undercutting said deposit; and d. expanding designated blocks of said deposit respectively overlaying said separate cavities into said cavities to form said permeable zones.
Claim 9
Independent Claim 158 words
A method of developing a system of adjacent permeable zones within a subterranean deposit comprising the steps of: a. driving at least two substantially horizontal spaced apart main entries along parallel paths at the base of the deposit, said main entries forming the boundaries of the system; b. driving a plurality of parallel access entries interconnecting said main entries; c. driving a plurality of zone entries transversely from each of said access entries into said deposit; d. driving at least two crosscuts from each of said transverse zone entries at spaced intervals so that said at least two crosscuts in combination with a respective one of said plurality of zone entries form a cavity undercutting said deposit, thereby forming a plurality of adjacent cavities separately undercutting said deposit; and e. explosively fragmenting designated blocks of said deposit respectively overlaying said adjacent cavities so that said designated blocks are expanded respectively into said cavities to form said permeable zones.
Claim 10
Independent Claim 158 words
A method of developing a system of adjacent permeable zones within a subterranean deposit comprising the steps of: a. driving at least two substantially horizontal spaced apart main entries along parallel paths at the base of the deposit, said main entries forming the boundaries of the system; b. driving a plurality of parallel access entries interconnecting said main entries; c. driving a plurality of zone entries transversely from each of said access entries into said deposit; d. driving at least two crosscuts from each of said transverse zone entries at spaced intervals so that said at least two crosscuts in combination with a respective one of said plurality of zone entries form a cavity undercutting said deposit, thereby forming a plurality of adjacent cavities separately undercutting said deposit; and e. explosively fragmenting designated blocks of said deposit respectively overlaying said adjacent cavities so that said designated blocks are expanded respectively into said cavities to form said permeable zones.
Claim 11
Independent Claim 211 words
A method of developing a system of adjacent permeable zones within a subterranean deposit comprising the steps of: a. driving at least a pair of spaced apart vertical shafts from the surface to a level below the top of a subterranean deposit; b. driving a main entry from the bottom of each of said at least two vertical shafts respectively, said main entries generally extending in a similar direction and along generally horizontal paths; c. driving at least two substantially parallel access entries each interconnecting and communicating with said main entries; d. driving a plurality of zone entries transversely from each of said at least two access entries into said deposit; e. driving at least two crosscuts from each of said plurality of transverse zone entries at spaced apart intervals, said at least two crosscuts penetrating said deposit and terminating therein, each of said at least two crosscuts forming with a respective one of said plurality of zone entries a cavity undercutting said deposit thereby forming a plurality of separate adjacent cavities separately undercutting said deposit; and f. explosively fragmenting designated blocks of said deposit respectiveLy overlaying said plurality of separate cavities so that said designated blocks are expanded respectively into said plurality of separate cavities to form said permeable zones.
Claim 12
Independent Claim 211 words
A method of developing a system of adjacent permeable zones within a subterranean deposit comprising the steps of: a. driving at least a pair of spaced apart vertical shafts from the surface to a level below the top of a subterranean deposit; b. driving a main entry from the bottom of each of said at least two vertical shafts respectively, said main entries generally extending in a similar direction and along generally horizontal paths; c. driving at least two substantially parallel access entries each interconnecting and communicating with said main entries; d. driving a plurality of zone entries transversely from each of said at least two access entries into said deposit; e. driving at least two crosscuts from each of said plurality of transverse zone entries at spaced apart intervals, said at least two crosscuts penetrating said deposit and terminating therein, each of said at least two crosscuts forming with a respective one of said plurality of zone entries a cavity undercutting said deposit thereby forming a plurality of separate adjacent cavities separately undercutting said deposit; and f. explosively fragmenting designated blocks of said deposit respectiveLy overlaying said plurality of separate cavities so that said designated blocks are expanded respectively into said plurality of separate cavities to form said permeable zones.
Claim 13
Dependent Claim 22 words
A method as in claim 8 wherein said plurality of zone entries extend between and interconnect said at least two access entries.
Claim 14
Independent Claim 190 words
A method of preparing underground retorts for in situ combustion operations within an underground mineral deposit comprising the steps of: a. driving at least one access entry at a level below the top of said underground deposit, said access entry being in communication with the surface at at least one of its ends; b. driving a plurality of zone entries transversely from said at least one access entry at said level into and terminating within said deposit; c. driving at least two spaced apart crosscuts from each of said plurality of zone entries into said deposit and terminating therein so that said at least two crosscuts in combination with a respective one of said plurality of said zone entries form a cavity undercutting said deposit, thereby forming a plurality of separate adjacent cavities separately undercutting said deposit; d. explosively fragmenting designated blocks of said deposit respectively overlaying said separate adjacent cavities so that said designated blocks are expanded respectively into said separate cavities to form a plurality of permeable zones; and e. providing a plurality of air inlet means communicating respectively with the top of each of said permeable zones.
Claim 15
Independent Claim 190 words
A method of preparing underground retorts for in situ combustion operations within an underground mineral deposit comprising the steps of: a. driving at least one access entry at a level below the top of said underground deposit, said access entry being in communication with the surface at at least one of its ends; b. driving a plurality of zone entries transversely from said at least one access entry at said level into and terminating within said deposit; c. driving at least two spaced apart crosscuts from each of said plurality of zone entries into said deposit and terminating therein so that said at least two crosscuts in combination with a respective one of said plurality of said zone entries form a cavity undercutting said deposit, thereby forming a plurality of separate adjacent cavities separately undercutting said deposit; d. explosively fragmenting designated blocks of said deposit respectively overlaying said separate adjacent cavities so that said designated blocks are expanded respectively into said separate cavities to form a plurality of permeable zones; and e. providing a plurality of air inlet means communicating respectively with the top of each of said permeable zones.
Claim 16
Dependent Claim 28 words
A method as in claim 10 further comprising means for sealing the zone entries respectively interconnecting each of said permeable zones and said at least one access entry.

References Cited (Backward Citations)

US3001776A Cited
US3316020A Cited
US3661423A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1978-11-03 1979-05-05 1979-11-04 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1982-11-03 1983-05-05 1983-11-04 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1986-11-03 1987-05-05 1987-11-04 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag