US3862491A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method for evaluating manufacturing operational effects on insulated windings
Assignee: General Electric Co
•
Filing: 1973-03-12
•
Granted: 1975-01-28
•
Expires: 1993-03-12
Abstract
Abstract A method is disclosed for evaluating the effect of a preselected manufacturing operation on an insulated winding. The insulated winding is submerged in a conductive fluid and a potential applied across the winding and fluid. A first capacitive component of leakage current from the winding is determined and the winding removed from the fluid. A preselected manufacturing operation is then performed on the winding. The winding is again submerged in a conductive fluid and a potential applied across the winding and fluid. A second capacitive component of leakage current from the winding is then determined and compared with the first capacitive component.
Inventors
- 👤 Hugh H Richardson
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-26 20:53
CPC Classifications
G; G01; G01R; G01R31/00; G01R31/34; G01R31/346; Y; Y10; Y10T; Y10T29/00; Y10T29/49; Y10T29/49002; Y10T29/49004; Y10T29/4902; Y10T29/49071
Claims Analysis
Total Claims: 12
Claim 1
Independent Claim
100 words
A method for evaluating the effect of a preselected manufacturing operation on a structure including an insulated winding, the method comprising: submerging the winding in a conductive fluid; applying a potential across the winding and fluid; determining a first capacitive component of leakage current from the winding; removing the winding from the fluid; performing a preselected manufacturing operation on the winding; again submerging the winding in a conductive fluid; again applying a potential across the winding and fluid; determining a second capacitive component of leakage current from the winding; and comparing the first and second capacitive components of leakage current.
Claim 2
Independent Claim
100 words
A method for evaluating the effect of a preselected manufacturing operation on a structure including an insulated winding, the method comprising: submerging the winding in a conductive fluid; applying a potential across the winding and fluid; determining a first capacitive component of leakage current from the winding; removing the winding from the fluid; performing a preselected manufacturing operation on the winding; again submerging the winding in a conductive fluid; again applying a potential across the winding and fluid; determining a second capacitive component of leakage current from the winding; and comparing the first and second capacitive components of leakage current.
Claim 3
Independent Claim
197 words
A method for evaluating the effect of a preselected manufacturing operation on a structure including an insulated winding conductor having an insulation coating thereon, the method comprising: submerging the insulated conductor in a conductive fluid; applying a potential across the conductor and fluid; determining at least a proportional indication of the capacitive component of leakage current flowing through the conductor and fluid; determining at least a proportional indication of the resistive component of leakage current flowing through the Conductor and fluid; forming a first ratio of the proportional indications of capacitive and resistive leakage current; removing the conductor from the fluid; performing a preselected manufacturing operation on the structure; again submerging the conductor in a conductive fluid; applying a potential across the conductor and fluid; determining at least a second proportional indication of the capacitive component of leakage current flowing through the conductor and fluid; determining at least a second proportional indication of the resistive component of leakage current; forming a second ratio of the second proportional indication of capacitive and resistive leakage current; and comparing the first ratio to the second ratio thereby to qualitatively ascertain changes in insulation integrity after performance of the manufacturing operation.
Claim 4
Independent Claim
197 words
A method for evaluating the effect of a preselected manufacturing operation on a structure including an insulated winding conductor having an insulation coating thereon, the method comprising: submerging the insulated conductor in a conductive fluid; applying a potential across the conductor and fluid; determining at least a proportional indication of the capacitive component of leakage current flowing through the conductor and fluid; determining at least a proportional indication of the resistive component of leakage current flowing through the Conductor and fluid; forming a first ratio of the proportional indications of capacitive and resistive leakage current; removing the conductor from the fluid; performing a preselected manufacturing operation on the structure; again submerging the conductor in a conductive fluid; applying a potential across the conductor and fluid; determining at least a second proportional indication of the capacitive component of leakage current flowing through the conductor and fluid; determining at least a second proportional indication of the resistive component of leakage current; forming a second ratio of the second proportional indication of capacitive and resistive leakage current; and comparing the first ratio to the second ratio thereby to qualitatively ascertain changes in insulation integrity after performance of the manufacturing operation.
Claim 5
Independent Claim
102 words
A method for evaluating the effect of a preselected manufacturing operation on a dynamoelectric machine stator including an insulated winding, the method comprising: submerging the stator in a conductive fluid; applying a potential across the stator and fluid; determining a first capacitive component of leakage current from the stator; removing the stator from the fluid; performing a preselected manufacturing operation on the stator; again submerging the stator in a conductive fluid; again applying a potential across the stator and fluid; determining a second capacitive component of leakage current from the stator; and comparing the first and second capacitive components of leakage current.
Claim 6
Independent Claim
102 words
A method for evaluating the effect of a preselected manufacturing operation on a dynamoelectric machine stator including an insulated winding, the method comprising: submerging the stator in a conductive fluid; applying a potential across the stator and fluid; determining a first capacitive component of leakage current from the stator; removing the stator from the fluid; performing a preselected manufacturing operation on the stator; again submerging the stator in a conductive fluid; again applying a potential across the stator and fluid; determining a second capacitive component of leakage current from the stator; and comparing the first and second capacitive components of leakage current.
Claim 7
Independent Claim
199 words
A method for evaluating the effect of a preselected manufacturing operation on a dynamoelectric machine stator including an insulated winding conductor having an insulation coating thereon, the method comprising: submerging the insulated conductor in a conductive fluid; applying a potential across the conductor and fluid; determining at least a proportional indication of the capacitive component of leakage current flowing through the conductor and fluid; determining at least a proportional indication of the resistive component of leakage current flowing through the conductor and fluid; forming a first ratio of the proportional indications of capacitive and resistive leakage current; removing the conductor from the fluid; performing a preselected manufacturing operation on the stator; again submerging the conductor in a conductive fluid; applying a potential across the conductor and fluid; determining at least a second proportional indication of the capacitive component of leakage current flowing through the conductor and fluid; determining at least a second proportional indication of the resistive component of leakage current; forming a second ratio of the second proportional indication of capacitive and resistive leakage current; and comparing the first ratio to the second ratio thereby to qualitatively ascertain changes in insulation integrity after performance of the manufacturing operation.
Claim 8
Independent Claim
199 words
A method for evaluating the effect of a preselected manufacturing operation on a dynamoelectric machine stator including an insulated winding conductor having an insulation coating thereon, the method comprising: submerging the insulated conductor in a conductive fluid; applying a potential across the conductor and fluid; determining at least a proportional indication of the capacitive component of leakage current flowing through the conductor and fluid; determining at least a proportional indication of the resistive component of leakage current flowing through the conductor and fluid; forming a first ratio of the proportional indications of capacitive and resistive leakage current; removing the conductor from the fluid; performing a preselected manufacturing operation on the stator; again submerging the conductor in a conductive fluid; applying a potential across the conductor and fluid; determining at least a second proportional indication of the capacitive component of leakage current flowing through the conductor and fluid; determining at least a second proportional indication of the resistive component of leakage current; forming a second ratio of the second proportional indication of capacitive and resistive leakage current; and comparing the first ratio to the second ratio thereby to qualitatively ascertain changes in insulation integrity after performance of the manufacturing operation.
Claim 9
Independent Claim
101 words
A method for evaluating the effect of a preselected manufacturing operation on an insulated winding for a dynamoelectric machine, the method comprising: submerging the winding in a conductive fluid; applying a potential across the winding and fluid; determining a first capacitive component of leakage current from the winding; removing the winding from the fluid; performing a preselected manufacturing operation on the winding; again submerging the winding in a conductive fluid; again applying a potential across the winding and fluid; determining a second capacitive component of leakage current from the winding; and comparing the first and second capacitive components of leakage current.
Claim 10
Independent Claim
101 words
A method for evaluating the effect of a preselected manufacturing operation on an insulated winding for a dynamoelectric machine, the method comprising: submerging the winding in a conductive fluid; applying a potential across the winding and fluid; determining a first capacitive component of leakage current from the winding; removing the winding from the fluid; performing a preselected manufacturing operation on the winding; again submerging the winding in a conductive fluid; again applying a potential across the winding and fluid; determining a second capacitive component of leakage current from the winding; and comparing the first and second capacitive components of leakage current.
Claim 11
Independent Claim
204 words
A method for evaluating the effect of a preselected manufacturing operation on an insulated winding conductor, for a dynamoelectric machine, having an insulation coating thereon, the method comprising: submerging at least the insulated conductor in a conductive fluid; applying a potential across the conductor and fluid; determining at least a proportionaL indication of the capacitive component of leakage current flowing through the conductor and fluid; determining at least a proportional indication of the resistive component of leakage current flowing through the conductor and fluid; forming a first ratio of the proportional indications of capacitive and resistive leakage current; removing the conductor from the fluid; performing a preselected manufacturing operation on the dynamoelectric machine winding; again submerging at least the conductor in a conductive fluid; applying a potential across the conductor and fluid; determining at least a second proportional indication of the capacitive component of leakage current flowing through the conductor and fluid; determining at least a second proportional indication of the resistive component of leakage current; forming a second ratio of the second proportional indication of capacitive and resistive leakage current; and comparing the first ratio to the second ratio thereby to qualitatively ascertain changes in insulation integrity after performance of the manufacturing operation.
Claim 12
Independent Claim
204 words
A method for evaluating the effect of a preselected manufacturing operation on an insulated winding conductor, for a dynamoelectric machine, having an insulation coating thereon, the method comprising: submerging at least the insulated conductor in a conductive fluid; applying a potential across the conductor and fluid; determining at least a proportionaL indication of the capacitive component of leakage current flowing through the conductor and fluid; determining at least a proportional indication of the resistive component of leakage current flowing through the conductor and fluid; forming a first ratio of the proportional indications of capacitive and resistive leakage current; removing the conductor from the fluid; performing a preselected manufacturing operation on the dynamoelectric machine winding; again submerging at least the conductor in a conductive fluid; applying a potential across the conductor and fluid; determining at least a second proportional indication of the capacitive component of leakage current flowing through the conductor and fluid; determining at least a second proportional indication of the resistive component of leakage current; forming a second ratio of the second proportional indication of capacitive and resistive leakage current; and comparing the first ratio to the second ratio thereby to qualitatively ascertain changes in insulation integrity after performance of the manufacturing operation.
References Cited (Backward Citations)
US464125A
Cited
US1945263A
Cited
US2170813A
Cited
US3015774A
Cited
US3286130A
Cited
US3465403A
Cited
US3562902A
Cited
US3526835A
Cited
US3775686A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1978-01-27 | 1978-07-29 | 1979-01-28 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1982-01-27 | 1982-07-29 | 1983-01-28 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1986-01-27 | 1986-07-29 | 1987-01-28 | $7700.00 | Window Closed / Lapsed |