← Back to Patent Explorer
US3830299A Expired / Lapsed US ⏱️ 0.0 years remaining

Shallow plugging selective re-entry well treatment

Assignee: Shell USA Inc
•
Filing: 1973-05-21
•
Granted: 1974-08-20
•
Expires: 1993-05-21
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The pattern of fluid flow between a well and one or more subterranean reservoirs having different characteristics and/or fluid content is adjusted by determining the flow pattern, plugging all of the reservoirs with plugging material deposited internally within a few inches from the well borehole, and then perforating some or all of the plugged portions with openings that are arranged in relation to the determined flow pattern to provide selected rates of flow at selected depths.

Inventors

  • 👤 J Thomeer

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 05:23
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/25; E21B43/26; E21B43/261; E21B43/14

Claims Analysis

Total Claims: 13
Claim 1
Independent Claim 86 words
A process for adjusting the fluid flow profile of a well that communicates with subterranean zones or reservoirs, which process comprises: determining the variation in flow capability with depth within the well; plugging each of the zones or reservoirs internally with plugging materials that are deposited within a few inches of the well borehole; and selectively perforating the plugged portions by forming openings through them that are arranged in relation to the determined variations in flow capability to permit selected rates of flow at selected depths.
Claim 2
Dependent Claim 86 words
A process for adjusting the fluid flow profile of a well that communicates with subterranean zones or reservoirs, which process comprises: determining the variation in flow capability with depth within the well; plugging each of the zones or reservoirs internally with plugging materials that are deposited within a few inches of the well borehole; and selectively perforating the plugged portions by forming openings through them that are arranged in relation to the determined variations in flow capability to permit selected rates of flow at selected depths.
Claim 3
Dependent Claim 26 words
The process of claim 1 in which said openings are arranged to permit a relatively greater flow rates at depths of determined relatively low flow capabilities.
Claim 4
Dependent Claim 25 words
The process of claim 1 in which said openings are arranged to permit relatively lower flow rates at deptsh of determined relatively high flow capabilities.
Claim 5
Dependent Claim 39 words
The process of claim 1 in which: said openings are first formed only at depths of relatively low determined flow capabilities; at least one stimulating fluid is injected through the openings, and openings are subsequently formed at other depths.
Claim 6
Dependent Claim 37 words
The process of claim 1 in which: said openings are first formed only at depths of relatively high determined flow capability; at least one permeability reducing material is injected; and openings are subsequently formed at other depths.
Claim 7
Dependent Claim 13 words
The process of claim 1 in which the well is an injection well.
Claim 8
Dependent Claim 13 words
The process of claim 1 in which the well is a production well.
Claim 9
Dependent Claim 18 words
The process of claim 1 in which the well contains an uncased borehole along said zones or reservoirs.
Claim 10
Dependent Claim 18 words
The process of claim 1 in which one well contains a cased borehole along said zones or reservoirs.
Claim 11
Dependent Claim 37 words
The process of claim 1 in which the well is a production well and said openings are arranged to permit substantially no flow at depths at which the fluid that can be produced has an undesired composition.
Claim 12
Dependent Claim 26 words
The process of claim 1 in which said openings are arranged to permit relatively greater rates of flow at depths of determined relaTively high flow capability.
Claim 13
Dependent Claim 26 words
The process of claim 1 in which said openings are arranged to permit relatively greater rates of flow at deptsh of determined relatively low flow capability.

References Cited (Backward Citations)

US2019418A Cited
US2107007A Cited
US2223804A Cited
US2799341A Cited
US3451264A Cited
US3593798A Cited
US3677343A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1977-08-19 1978-02-18 1978-08-20 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1981-08-19 1982-02-18 1982-08-20 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1985-08-19 1986-02-18 1986-08-20 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag