Abstract

Abstract A programmable industrial logic controller is provided for accomplishing the sequencing operations and other related control tasks performed by a logic control system of the type adapted for controlling machine and process equipment. The controller includes input means, memory means, control logic means, automatic self-test means, output means and manual test means. The input means functions to receive inputs supplied to the controller corresponding to the existing conditions of a plurality of parameters of the equipment being controlled. A preestablished set of instructions is stored in the memory means relating to the operation of the equipment being controlled. The control logic means functions to operate in response to a set of instructions stored in the memory means. Further, the control logic means functions to generate outputs, for controlling the operation of the equipment, from the series of instructions extracted from the memory means. Automatic self-test means are provided for periodically performing a self test of the controller to determine whether the controller is functioning properly. The output means is connected in circuit relation with control logic means and receives therefrom the outputs generated thereby. The outputs received by the output means are supplied thereby to the equipment being controlled. The manual test means are provided to permit manual test of selected controller functions.

Inventors

  • 👤 D Langdon
  • 👤 J Prentice
  • 👤 Olinda D Van

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-23 05:10
CPC Classifications
G; G05; G05B; G05B19/00; G05B19/02; G05B19/04; G05B19/05; G05B19/058; G05B2219/00; G05B2219/10; G05B2219/11; G05B2219/1188; G05B2219/13; G05B2219/13016; G05B2219/14; G05B2219/14089; G05B2219/14112; G05B2219/14144; G05B2219/15; G05B2219/15049

Claims Analysis

Total Claims: 24
Claim 1
Independent Claim 241 words
A programmable controller, for accomplishing the sequencing operations and other related control tasks performed by a logic control system of the type adapted for controlling machine and process equipment, comprising: a. input means operable to receive inputs supplied to the controller corresponding to the existing condition of a plurality of parameters of the equipment being controlled; b. memory means having a pre-established set of instructions describing the control system requirements for the equipment being controlled; c. control logic means connected in electrical circuit relation with said input means and said memory means, said control logic means operating to scan inputs received by said input means in response to instructions received from said memory means and to compare the status of the scanned inputs to the control system requirements stored in said memory means to generate outputs for controlling the operation of the equipment; d. output means connected in electrical circuit relation with said coNtrol logic means for receiving therefrom said outputs and for supplying said outputs to the equipment being controlled; and e. automatic on-line self-test means self-contained in the controller and connected in electrical circuit relation with said input means, said memory means, said control logic means and said output means, said automatic on-line self-test means in response to instructions provided thereto from said memory means performing continually while the controller is in an online operating state a self-test of the controller to determine whether the controller is functioning properly.
Claim 2
Dependent Claim 241 words
A programmable controller, for accomplishing the sequencing operations and other related control tasks performed by a logic control system of the type adapted for controlling machine and process equipment, comprising: a. input means operable to receive inputs supplied to the controller corresponding to the existing condition of a plurality of parameters of the equipment being controlled; b. memory means having a pre-established set of instructions describing the control system requirements for the equipment being controlled; c. control logic means connected in electrical circuit relation with said input means and said memory means, said control logic means operating to scan inputs received by said input means in response to instructions received from said memory means and to compare the status of the scanned inputs to the control system requirements stored in said memory means to generate outputs for controlling the operation of the equipment; d. output means connected in electrical circuit relation with said coNtrol logic means for receiving therefrom said outputs and for supplying said outputs to the equipment being controlled; and e. automatic on-line self-test means self-contained in the controller and connected in electrical circuit relation with said input means, said memory means, said control logic means and said output means, said automatic on-line self-test means in response to instructions provided thereto from said memory means performing continually while the controller is in an online operating state a self-test of the controller to determine whether the controller is functioning properly.
Claim 3
Dependent Claim 66 words
A programmable controller as set forth in claim 1 wherein said input means comprises an input module including a plurality of input cards each operable to translate input signals supplied to the controller to logic level signals while providing isolation from electrical noise derived from external sources and each having a separate input light operable to indicate the ON and OFF status of the input card.
Claim 4
Dependent Claim 65 words
A programmable controller as set forth in claim 1 wherein said output means comprises an output module including a plurality of output cards operable for storing logic solutions thereon and for executing the stored solutions when all output equations have been solved whereby to provide outputs therefrom corresponding to the stored solutions thereon thereby to control the energizing and deenergizing of loads in accordance therewith.
Claim 5
Dependent Claim 40 words
A programmable controller as set forth in claim 1 wherein said memory means comprises a plurality of integrated circuit programmable read only semiconductor memory devices each containing 1,024 bits of memory storage organized as 256 words of 4 bits each.
Claim 6
Dependent Claim 46 words
A programmable controller as set forth in claim 1 further comprising built-in test means including switch means operable for displaying memory contents and interlocked with said output means to prevent accidental and undesired energization of said outputs from the controller during operation of said switch means.
Claim 7
Dependent Claim 80 words
A programmable controller as set forth in claim 1 further comprising timing means operable to provide adjustable time delays in response to programmed memory instructions and including light means having three operating states consisting of a lighted state when said timing means is ON, an unlighted state when said timing means is OFF, and a flashing state when said timing means is timing, and switch means permitting manual operation of said timing means to check the operation and setting thereof.
Claim 8
Dependent Claim 343 words
A logic control system, for providing automatic control of gas turbines and associated equipment such as compressors, generators, etc. used with them in industrial applications by accomplishing the multitude of functions required to automatically start the turbine system, monitor its proper acceleration and normal running, automatically sequence normal shutdown operation and provide automatic alarm and emergency control if malfunctions occur, comprising: a. input means receiving inputs from signal devices provided in the turbine system indicating the existing condition of the parameters of operation of the turbine engine and its associated equipment; b. output means providing outputs from the logic control system to the turbine system for controlling the operation of the turbine engine and its associated equipment; c. interrogating means connected in circuit relation with said input means and said output means for interrogating the status of the inputs of said input means and the outputs of said output means; d. programmable memory means having stored therein a series of digitally coded instructions representing the solution to a set of equations describing the control system requirements for the turbine system; e. a central process unit connected in circuit relation with said interrogating means and said programmable memory means for receiving the status of selected inputs from said input means and selected outputs frOm said output means and for performing logic operations thereon in response to instructions received from said programmable memory means whereby the outputs provided from said output means for controlling the operation of the turbine system are determined as a function of the inputs received by said input means from the turbine system; and f. automatic on-line self-test means self-contained in the control system and connected in electrical circuit relation with said input means, said output means, said interrogating means, said programmable memory means and said central process unit, said automatic on-line self-test means in response to instructions provided thereto from said memory means performing continually while the control system is in an on-line operating state a self-test of the control system to determine whether the control system is functioning properly.
Claim 9
Dependent Claim 343 words
A logic control system, for providing automatic control of gas turbines and associated equipment such as compressors, generators, etc. used with them in industrial applications by accomplishing the multitude of functions required to automatically start the turbine system, monitor its proper acceleration and normal running, automatically sequence normal shutdown operation and provide automatic alarm and emergency control if malfunctions occur, comprising: a. input means receiving inputs from signal devices provided in the turbine system indicating the existing condition of the parameters of operation of the turbine engine and its associated equipment; b. output means providing outputs from the logic control system to the turbine system for controlling the operation of the turbine engine and its associated equipment; c. interrogating means connected in circuit relation with said input means and said output means for interrogating the status of the inputs of said input means and the outputs of said output means; d. programmable memory means having stored therein a series of digitally coded instructions representing the solution to a set of equations describing the control system requirements for the turbine system; e. a central process unit connected in circuit relation with said interrogating means and said programmable memory means for receiving the status of selected inputs from said input means and selected outputs frOm said output means and for performing logic operations thereon in response to instructions received from said programmable memory means whereby the outputs provided from said output means for controlling the operation of the turbine system are determined as a function of the inputs received by said input means from the turbine system; and f. automatic on-line self-test means self-contained in the control system and connected in electrical circuit relation with said input means, said output means, said interrogating means, said programmable memory means and said central process unit, said automatic on-line self-test means in response to instructions provided thereto from said memory means performing continually while the control system is in an on-line operating state a self-test of the control system to determine whether the control system is functioning properly.
Claim 10
Dependent Claim 35 words
A logic control system as set forth in claim 7 wherein said central process unit includes memory address means for addressing a particular location in said programmable memory means for extracting a desired instruction therefrom.
Claim 11
Dependent Claim 53 words
A logic control system as set forth in claim 7 wherein said central process unit includes an instruction decoding means for decoding and converting instructions received from said programmable memory means into electrical signals which control the operation of the control circuits employed in solving the equations programmed in said programmable memory means.
Claim 12
Dependent Claim 51 words
A logic control system as set forth in claim 7 wherein said central process unit includes a logic process means for performing AND and OR logic operations on the inputs of said input means and the outputs of said output means in response to instructions programmed into said programmable memory means.
Claim 13
Dependent Claim 33 words
A logic control system as set forth in claim 7 wherein said self-test means includes means for providing a visual fault indication of the existence of a fault in the logic control system.
Claim 14
Dependent Claim 28 words
A logic control system as set forth in claim 7 further comprising a built-in test means including switch means operable for displaying contents of said programmable memory means.
Claim 15
Dependent Claim 63 words
A logic control system as set forth in claim 7 further comprising a timer means operable to provide adjustable time delays in response to instructions programmed into said programmable memory means and including light means for indicating the ON and OFF status of said timer means and switch means permitting manual operation of said timer means to check the operation and settings thereof.
Claim 16
Dependent Claim 180 words
A logic control system for controlling the operation of a turbine system comprising: a. input means receiving inputs from signal devices provided in the turbine system indicating the existing conditions of a plurality of the parameters of operation of the turbine system; b. output means providing outputs from the logic control system to the turbine system for controlling the operation of the latter; c. memory means having stored therein a series of instructions describing the control system requirements of the turbine system; d. logic processing means connected in circuit relation with said input means, said output means and said memory means for performing logic operations on the inputs received by said input means in response to instructions programmed in said memory means to determine the outputs provided from said output means for controlling the operation of the turbine system as a function of the inputs received by said input means from the turbine system; and e. self-test means for periodically performing a self-test of the logic control system in response to a series of instructions stored in said memory means.
Claim 17
Dependent Claim 180 words
A logic control system for controlling the operation of a turbine system comprising: a. input means receiving inputs from signal devices provided in the turbine system indicating the existing conditions of a plurality of the parameters of operation of the turbine system; b. output means providing outputs from the logic control system to the turbine system for controlling the operation of the latter; c. memory means having stored therein a series of instructions describing the control system requirements of the turbine system; d. logic processing means connected in circuit relation with said input means, said output means and said memory means for performing logic operations on the inputs received by said input means in response to instructions programmed in said memory means to determine the outputs provided from said output means for controlling the operation of the turbine system as a function of the inputs received by said input means from the turbine system; and e. self-test means for periodically performing a self-test of the logic control system in response to a series of instructions stored in said memory means.
Claim 18
Dependent Claim 34 words
A logic control system as set forth in claim 14 wherein said self-test means further includes means for providing a visual fault indication of the existence of a fault in the logic control system.
Claim 19
Dependent Claim 228 words
A logic control system for controlling the operation of a turbine system comprIsing: a. input means receiving inputs from signal devices provided in the turbine system indicating the existing condition of a plurality of the parameters of operation of the turbine system; b. output means providing outputs from the logic control system to the turbine system for controlling the operation of the latter; c. memory means having stored therein a series of instructions describing the control system requirements of the turbine system; d. logic processing means connected in circuit relation with said input means, said output means, and said memory means for performing logic operations on the inputs received by said input means in response to instructions programmed in said memory means to determine the outputs provided from said output means for controlling the operation of the turbine system as a function of the inputs received by said input means from the turbine system; and e. timer means operable to provide adjustable time delays in response to instructions programmed into said memory means and including light means having three operating states consisting of a lighted state when said timer means is ON, an unlighted state when said timer means is OFF and a flashing state when said timer means is timing, and switch means permitting manual operation of said timer means to check the operation and settings thereof.
Claim 20
Dependent Claim 228 words
A logic control system for controlling the operation of a turbine system comprIsing: a. input means receiving inputs from signal devices provided in the turbine system indicating the existing condition of a plurality of the parameters of operation of the turbine system; b. output means providing outputs from the logic control system to the turbine system for controlling the operation of the latter; c. memory means having stored therein a series of instructions describing the control system requirements of the turbine system; d. logic processing means connected in circuit relation with said input means, said output means, and said memory means for performing logic operations on the inputs received by said input means in response to instructions programmed in said memory means to determine the outputs provided from said output means for controlling the operation of the turbine system as a function of the inputs received by said input means from the turbine system; and e. timer means operable to provide adjustable time delays in response to instructions programmed into said memory means and including light means having three operating states consisting of a lighted state when said timer means is ON, an unlighted state when said timer means is OFF and a flashing state when said timer means is timing, and switch means permitting manual operation of said timer means to check the operation and settings thereof.
Claim 21
Dependent Claim 184 words
A logic control system for controlling the operation of a turbine system comprising: a. input means receiving inputs from signal devices provided in the turbine system indicating the existing condition of a plurality of the parameters of operation of the turbine system; b. output means providing outputs from the logic control system to the turbine system for controlling the operation of the latter; c. memory means having stored therein a series of instructions describing the control system requirements of the turbine system; d. logic processing means connected in circuit relation with said input means, said output means, and said memory means for performing logic operations on the inputs received by said input means in response to instructions programmed in said memory means to determine the outputs provided from said output means for controlling the operation of the turbine system as a function of the inputs received by said input means from the turbine system; and e. built-in test means including manually operable means for controlling the rate at which said memory means is scanned and for visually displaying the contents of said memory means.
Claim 22
Dependent Claim 184 words
A logic control system for controlling the operation of a turbine system comprising: a. input means receiving inputs from signal devices provided in the turbine system indicating the existing condition of a plurality of the parameters of operation of the turbine system; b. output means providing outputs from the logic control system to the turbine system for controlling the operation of the latter; c. memory means having stored therein a series of instructions describing the control system requirements of the turbine system; d. logic processing means connected in circuit relation with said input means, said output means, and said memory means for performing logic operations on the inputs received by said input means in response to instructions programmed in said memory means to determine the outputs provided from said output means for controlling the operation of the turbine system as a function of the inputs received by said input means from the turbine system; and e. built-in test means including manually operable means for controlling the rate at which said memory means is scanned and for visually displaying the contents of said memory means.
Claim 23
Dependent Claim 318 words
A logic control system for controlling the operation of a turbine system comprising: a. input means receiving inputs from signal devices provided in the turbine system indicating the existing condition of a plurality of the parameters of operation of the turbine system; b. output means providing outputs from the logic control system to the turbine system for controlling the operation of the latter; c. memory means including an integrated circuit programmable read only semiconductor memory capable of being programmed by random programming and having stored therein a series of instructions describing the control system requirements of the turbine system, said memory means including a plurality of memory words with each of said plurality of memory words being composed of 12 bits with 3 of said 12 bits defining the instruction and operation to be performed and the remaining 9 of said 12 bits defining a particular one of the inputs and outputs to be addressed and wherein said 9 bits provide a capability of addressing 512 inputs and outputs, said memory means further including circuit means operable for addressing an additional 512 outputs with said nine bits in response to an instruction from one of said 3 bits of the 12 bit word; and d. logic processing means connected in circuit relation with said input means, said output means, and said memory means for performing logic opeRations on the inputs received by said input means in response to instructions programmed in said memory means to determine the outputs provided from said output means for controlling the operation of the turbine system as a function of the inputs received by said input means from the turbine system, and including means operable to permit changes to be made in said series of instructions stored in said memory means simply by erasing the unwanted instruction and programming a new instruction as a substitute therefor at the end of said memory means.
Claim 24
Dependent Claim 318 words
A logic control system for controlling the operation of a turbine system comprising: a. input means receiving inputs from signal devices provided in the turbine system indicating the existing condition of a plurality of the parameters of operation of the turbine system; b. output means providing outputs from the logic control system to the turbine system for controlling the operation of the latter; c. memory means including an integrated circuit programmable read only semiconductor memory capable of being programmed by random programming and having stored therein a series of instructions describing the control system requirements of the turbine system, said memory means including a plurality of memory words with each of said plurality of memory words being composed of 12 bits with 3 of said 12 bits defining the instruction and operation to be performed and the remaining 9 of said 12 bits defining a particular one of the inputs and outputs to be addressed and wherein said 9 bits provide a capability of addressing 512 inputs and outputs, said memory means further including circuit means operable for addressing an additional 512 outputs with said nine bits in response to an instruction from one of said 3 bits of the 12 bit word; and d. logic processing means connected in circuit relation with said input means, said output means, and said memory means for performing logic opeRations on the inputs received by said input means in response to instructions programmed in said memory means to determine the outputs provided from said output means for controlling the operation of the turbine system as a function of the inputs received by said input means from the turbine system, and including means operable to permit changes to be made in said series of instructions stored in said memory means simply by erasing the unwanted instruction and programming a new instruction as a substitute therefor at the end of said memory means.

References Cited (Backward Citations)

US3686639A Cited
US3651477A Cited
US3719931A Cited
US3701113A Cited
US3731280A Cited
US3753243A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1977-08-12 1978-02-11 1978-08-13 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1981-08-12 1982-02-11 1982-08-13 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1985-08-12 1986-02-11 1986-08-13 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag