← Back to Patent Explorer
US3825501A Expired / Lapsed US ⏱️ 0.0 years remaining

Exothermic reaction process

Assignee: Texaco Inc
•
Filing: 1971-12-17
•
Granted: 1974-07-23
•
Expires: 1991-12-17
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A STREAM OF FLUID REACTANTS IS PASSED THROUGH CATALYST WHEREIN THE REACTANTS UNDERGO A TEMPERATURE CONTROLLED EXOTHERMIC REACTION SO AS TO PRODUCE MAXIMUM CONVERSION. THE TEMPERATURE OF THE REACTING STREAM IS CONTROLLED BY TWO SEPARATE STREAMS OF COOLANTS WHICH ARE SEPARATELY PASSED THROUGH TWO SEPARATE HEAT EXCHANGERS EMBEDDED IN SAID CATALYST IN CONCURRENT FLOW AND INDIRECT HEAT EXCHANGE WITH THE REACTING STREAM. THE FIRST STREAM OF COOLANT MAY BE WATER OR AN ORGANIC LIQUID FROM AN EXTERNAL SOURCE. THE SECOND STREAM OF COOLANT IS A PORTION OF UNREACTED FEEDSTREAM BEFORE IT IS INTRODUCED INTO THE CATALYST WHERE IT UNDERGOES EXOTHERMIC REACTION AS PREVIOUSLY DESCRIBED.

Inventors

  • 👤 J Muenger

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 13:34
CPC Classifications
B; B01; B01J; B01J8/00; B01J8/02; B01J8/0285; C; C01; C01B; C01B3/00; C01B3/02; C01B3/06; C01B3/12; C01B3/16; B01J2208/00; B01J2208/00008; B01J2208/00017; B01J2208/00106; B01J2208/00115; B01J2208/00132

Claims Analysis

Total Claims: 0
No claims parsed yet. Click Sync Now above to re-index claims from Google Patents.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1977-07-22 1978-01-21 1978-07-23 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1981-07-22 1982-01-21 1982-07-23 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1985-07-22 1986-01-21 1986-07-23 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag