Hydrogenation of coal
Abstract
Abstract PULVERIZED COAL, IN THE SUBSTANTIAL ABSENCE OF PASTING OR SLURRYING MEDIU, IS DISPERSED INTO A RECYCLE STREAM OF PREHEATED, HIGH-PRESSURE HYDROGEN AND THE RESULTANT REACTION STREAM IS PRESSED THROUGH A HYDROGENATION ZONE CONTAINING A BED OF HYDROGENATION CATALYST AT A RATE SUFFICIENT TO SWEEP UNREACTED COAL, COAL ASH AND HYDROCARBON REACTION PRODUCTS FROM THE CATALYST BED. LIQUID AND GASEOUS HYDROCARBON PRODUCTS, AFTER SULFUR REMOVAL, ARE RECOVERED FROM THE PRODUCT STREAM. A HIGH HYDROGEN RECYCLE RATIO THROUGH THE CATALYST BED IS EMPLOYED TO PREVENT CATALYST INACTIVATION BY PRODUCT HYDROCARBONS. A NOVEL METHOD OF FEEDING THE PULVERIZED COAL INTO THE HIGH PRESSURE SYSTEM FROM A HYDROGEN PRESSURIZED HOPPER WITHOUT PERMITTING THE COMPRESSED HYDROGEBN TO EXPAND TO LOWER PRESSURE, THEREBY REDUCING THE ENERGY REQUIREMENTS OF THE SYSTEM, IS DISCLOSED.
Inventors
- 👤 W Schroeder
Bibliographic Details
Claims Analysis
Total Claims: 0References Cited (Backward Citations)
No citation records indexed.
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1977-07-08 | 1978-01-07 | 1978-07-09 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1981-07-08 | 1982-01-07 | 1982-07-09 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1985-07-08 | 1986-01-07 | 1986-07-09 | $7700.00 | Window Closed / Lapsed |