Method for testing units of a program controlled data processing system
Abstract
Abstract A method for testing system units or modules in a modularly constructed data processing system wherein the testing is performed by changing the supply voltage to the system unit under test. After requesting and receiving assignment of a storage cycle in the system''s central memory, a program control generates and transmits a command signal. The command signal is evaluated, and a signal datum responsive thereto is formed and transmitted to a power supply connected to the system unit being tested. Depending on the information contained in the latter transmitted signal, the operating voltage of the system unit can be adjusted to approach the limits prescribed for the particular system unit. The operability of the system unit is determined from its response to operating voltages near the outer limits of its range.
Inventors
- 👤 B Schaffer
- 👤 H Moder
- 👤 J Rabold
- 👤 F Giebler
Bibliographic Details
Claims Analysis
Total Claims: 6References Cited (Backward Citations)
No citation records indexed.
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1977-06-24 | 1977-12-24 | 1978-06-25 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1981-06-24 | 1981-12-24 | 1982-06-25 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1985-06-24 | 1985-12-24 | 1986-06-25 | $7700.00 | Window Closed / Lapsed |