Method of connecting underwater installations
Abstract
Abstract A ship is provided with a through-hull well extending from the upper deck 3 through the main deck 2 to the ship''s bottom. A derrick 4 is positioned on the upper deck above the well. To assemble a multi-unit load for lowering to the sea bottom, a sliding platform 10 at the main deck level is moved over the well opening. A sliding crane just below the upper deck then transports a first load unit from a storage area adjacent the well to the platform. The crane is then withdrawn, the load unit is restrained against lateral movement in vertical guides, and is raised up into the derrick. Additional load units are delivered in this manner to the platform and coupled to the unit(s) above it to produce the final load. The platform is then slid back from the well opening and the load is lowered by the derrick to the sea bottom.
Inventors
- 👤 B Mercier
- 👤 Serrano F De
Bibliographic Details
Claims Analysis
Total Claims: 4References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1977-06-17 | 1977-12-17 | 1978-06-18 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1981-06-17 | 1981-12-17 | 1982-06-18 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1985-06-17 | 1985-12-17 | 1986-06-18 | $7700.00 | Window Closed / Lapsed |