US3811289A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Methods of grouting offshore structures
Assignee: Individual
•
Filing: 1973-04-16
•
Granted: 1974-05-21
•
Expires: 1993-04-16
Abstract
Abstract A predetermined amount of grouting material is introduced from the top into an annular space between a piling and a jacket of a supporting leg of an offshore structure. The amount of the material is sufficient to displace water from the space through the lower end of the jacket, and when the material sets, it forms a plug in the bottom portion of the annular space. Additional grouting material is then introduced to fill the upper portion of the annular space and is allowed to set.
Inventors
- 👤 M Bassett
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-31 05:46
CPC Classifications
E; E02; E02B; E02B17/00; E02B17/0008
Claims Analysis
Total Claims: 7
Claim 1
Independent Claim
254 words
A method of grouting an offshore structure having at least one supporting leg including a tubular jacket extending downwardly from above the water line to the sea bed and a piling driven through said jacket into the sea bed with an annular space existing between the inside of the jacket and said piling, said method comprising the steps of: a. sealing the upper end of said jacket to said piling so as to close said annular space at the upper end of the jacket; b. introducing into said annular space at a plurality of circumferentially spaced points adjacent the upper end of the jacket and above the water line a predetermined amount of grouting material which in relation to the total volume of the annular space is sufficient to form an annular column in the bottom portion of the annular space with hydrostatic pressure in excess of the sea water column on the outside, the sea bed being sufficiently porous so that sea water is displaced from the annular space through the lower end of the jacket by the introduced grouting material itself; c. allowing the introduced grouting material to set when the hydrostatic pressure is balanced, thus forming a plug in the bottom portion of the annular space; d. introducing additional grouting material into said annular space at a point adjacent the upper end of the jacket so that the additional grouting material fills the upper portion of the annular space above said plug; and e. allowing the additional grouting material to set.
Claim 2
Independent Claim
254 words
A method of grouting an offshore structure having at least one supporting leg including a tubular jacket extending downwardly from above the water line to the sea bed and a piling driven through said jacket into the sea bed with an annular space existing between the inside of the jacket and said piling, said method comprising the steps of: a. sealing the upper end of said jacket to said piling so as to close said annular space at the upper end of the jacket; b. introducing into said annular space at a plurality of circumferentially spaced points adjacent the upper end of the jacket and above the water line a predetermined amount of grouting material which in relation to the total volume of the annular space is sufficient to form an annular column in the bottom portion of the annular space with hydrostatic pressure in excess of the sea water column on the outside, the sea bed being sufficiently porous so that sea water is displaced from the annular space through the lower end of the jacket by the introduced grouting material itself; c. allowing the introduced grouting material to set when the hydrostatic pressure is balanced, thus forming a plug in the bottom portion of the annular space; d. introducing additional grouting material into said annular space at a point adjacent the upper end of the jacket so that the additional grouting material fills the upper portion of the annular space above said plug; and e. allowing the additional grouting material to set.
Claim 3
Independent Claim
221 words
A method of grouting an offshore structure having at least one supporting leg including a tubular jacket extending downwardly from above the water line to the sea bed and a piling driven through said jacket into the sea bed with an annular space existing between the inside of the jacket and said piling, said method comprising the steps of: a. sealing the upper end of said jacket to said piling so as to close said annular space at the upper end of the jacket; b. introducing a predetermined amount of grouting material into said annular space at a point adjacent the upper end of the jacket at a rate sufficient to form an annular column of grout in the upper end of said annular space, the amount of grouting material being sufficient that said annular column has a hydrostatic pressure in excess of the hydrostatic pressure of the sea water column on the outside, the sea bed being sufficiently porous so that sea water is displaced from the annular space through the lower end of the jacket by the downward movement in the annular space of the introduced grouting material itself; and c. allowing the introduced grouting material to set when it reaches the bottom of the annular space, thus forming a plug in the bottom portion of the annular space.
Claim 4
Independent Claim
221 words
A method of grouting an offshore structure having at least one supporting leg including a tubular jacket extending downwardly from above the water line to the sea bed and a piling driven through said jacket into the sea bed with an annular space existing between the inside of the jacket and said piling, said method comprising the steps of: a. sealing the upper end of said jacket to said piling so as to close said annular space at the upper end of the jacket; b. introducing a predetermined amount of grouting material into said annular space at a point adjacent the upper end of the jacket at a rate sufficient to form an annular column of grout in the upper end of said annular space, the amount of grouting material being sufficient that said annular column has a hydrostatic pressure in excess of the hydrostatic pressure of the sea water column on the outside, the sea bed being sufficiently porous so that sea water is displaced from the annular space through the lower end of the jacket by the downward movement in the annular space of the introduced grouting material itself; and c. allowing the introduced grouting material to set when it reaches the bottom of the annular space, thus forming a plug in the bottom portion of the annular space.
Claim 5
Dependent Claim
34 words
A method as defined by claim 2 and including introducing additional grouting material into said annular space at a point adjacent the upper end of the jacket, allowing the additional grouting material to set.
Claim 6
Dependent Claim
26 words
A method as defined by claim 3 wherein the additional grouting material is sufficient to fill the upper portion of the annular space above the plug.
Claim 7
Dependent Claim
24 words
A method as defined by claim 2 wherein the grouting material is introduced into said annular space at a plurality of circumferentially spaced points.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1977-05-20 | 1977-11-19 | 1978-05-21 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1981-05-20 | 1981-11-19 | 1982-05-21 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1985-05-20 | 1985-11-19 | 1986-05-21 | $7700.00 | Window Closed / Lapsed |