Pile installation

Assignee: Raymond International Inc
•
Filing: 1971-10-07
•
Granted: 1973-12-18
•
Expires: 1991-10-07
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Piles are installed by driving a tubular lower pile shell section into the ground to a first location beyond which the shell section refuses to penetrate, thereafter, filling the shell with concrete, allowing the concrete to harden and stiffen the shell, and thereafter continuing to drive the concreted shell down to a final bearing depth substantially beyond the first location.

Inventors

  • 👤 A Godley
  • 👤 W Kruse

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-07 22:43
CPC Classifications
E; E02; E02D; E02D5/00; E02D5/22; E02D5/34; E02D5/38

Claims Analysis

Total Claims: 15
Claim 1
Independent Claim 82 words
A method of forming a pile in the earth comprising the steps of driving a hollow tube, closed at the bottom, down into the earth to a first location less than the depth at which penetration refusal is experienced, then filling the tube with a flowable castable material to stiffen the tube, allowing the castable material to harden and thereafter further driving the tube with the castable material hardened therein further down substantially beyond said first location to a final bearing depth.
Claim 2
Independent Claim 82 words
A method of forming a pile in the earth comprising the steps of driving a hollow tube, closed at the bottom, down into the earth to a first location less than the depth at which penetration refusal is experienced, then filling the tube with a flowable castable material to stiffen the tube, allowing the castable material to harden and thereafter further driving the tube with the castable material hardened therein further down substantially beyond said first location to a final bearing depth.
Claim 3
Dependent Claim 30 words
A method of forming a pile according to claim 1, wherein the castable material is concrete and said concrete is allowed to harden about four days before said further driving.
Claim 4
Independent Claim 59 words
A method of forming a pile in the earth comprising the steps of driving a first tube down into the earth, filling the tube with a castable material to stiffen same, allowing the castable material to harden, connecting a further tube to the top of the first tube and thereafter driving the tubes together further down into the earth.
Claim 5
Independent Claim 59 words
A method of forming a pile in the earth comprising the steps of driving a first tube down into the earth, filling the tube with a castable material to stiffen same, allowing the castable material to harden, connecting a further tube to the top of the first tube and thereafter driving the tubes together further down into the earth.
Claim 6
Dependent Claim 35 words
A method of forming a pile according to claim 3, wherein the castable material is concrete and wherein water which rises to the top of said first tube is removed and replaced with a grout.
Claim 7
Dependent Claim 28 words
A method of forming a pile according to claim 3, wherein a steel plate is positioned on top of the castable material prior to connecting said further tube.
Claim 8
Dependent Claim 27 words
A method of forming a pile according to claim 3, wherein said further tube is connected by welding its end to the top of said first tube.
Claim 9
Dependent Claim 27 words
A method of forming a pile according to claim 6, wherein said tubes are driven together further down into the earth by application of vibratory driving forces.
Claim 10
Dependent Claim 22 words
A method of forming a pile according to claim 3, wherein said further tube is connected by means of a connector sleeve.
Claim 11
Dependent Claim 25 words
A method of forming a pile according to claim 8, wherein said connector sleeve is preassembled with one of said tubes by a press fit.
Claim 12
Dependent Claim 24 words
A method of forming a pile according to claim 9, wherein said connector sleeve is fitted to the other tube with a sliding fit.
Claim 13
Dependent Claim 29 words
A method of forming a pile according to claim 3, wherein said further tube, after being driven further down into the earth, is itself filled with a castable material.
Claim 14
Dependent Claim 47 words
A method of forming a pile according to claim 11, wherein the castable material in said further tube is allowed to harden and a third tube is connected to the top of said further tube and all said tubes are together driven still further into the earth.
Claim 15
Dependent Claim 54 words
A method of forming a pile according to claim 3, wherein said driving of the tubes together into the earth is undertaken by means of a mandrel extending down the interior of said further tube to engage the castable material in the first tube to distribute the force of driving blows between said tubes.

References Cited (Backward Citations)

US1558127A Cited
US1954070A Cited
US2465557A Cited
US2698520A Cited
US2920456A Cited
US3199300A Cited
US3316724A Cited
US3395543A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1976-12-17 1977-06-18 1977-12-18 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1980-12-17 1981-06-18 1981-12-18 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1984-12-17 1985-06-18 1985-12-18 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag