Mining method and method of land reclamation

Assignee: Individual
•
Filing: 1971-08-18
•
Granted: 1973-12-04
•
Expires: 1991-08-18
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A mining method including land reclamation and hydropower and water resources development including removing the ore from the ore body in a predetermined pattern so that the remaining ore body defines a grid network of cellular units, the ore removal being performed progressively such that adjacent cellular units are in various stages of development simultaneously and filling the mined-out cells with overburden from adjacent ore body; constructing terrace ponds above the elevation of the top of the mined-out cells, the terrace ponds being constructed from overburden material; constructing dams between adjacent terrace ponds, the dams overlying an elevated portion of the ore body previously used as a plant pillar or access entry pillar; and selectively filling the terrace ponds and pillar ponds with mill tailing slurry to a predetermined reclaimed surface elevation so that the reclaimed surface consists predominantly of a slime fraction suited to agricultural re-use of the land.

Inventors

  • 👤 C Livingston

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 06:42
CPC Classifications
E; E21; E21F; E21F16/00; E21C; E21C37/00; E21C37/16; E21C41/00; E21C41/26; E21C41/31; E21C41/32

Claims Analysis

Total Claims: 24
Claim 1
Independent Claim 158 words
In the method of land reclamation including removing overburden from an extended area of ore, removing the ore from the ore body in a predetermined pattern so that the remaining ore body defines a grid network of cellular units, said ore removal being performed progressively such that adjacent cellular units are in various stages of development simultaneously and filling the mined-out cells with overburden from adjacent ore body; the improvement comprising: a. constructing terrace ponds above the elevation of the top of the mined-out cells, said terrace ponds being constructed from overburden material; b. constructing dams between adjacent terrace ponds said dams overlying an elevated portion of the ore body previously used as a plant pillar or access entry pillar; and c. selectively filling the terrace ponds and pillar ponds with mill tailing slurry to a predetermined reclaimed surface elevation so that the reclaimed surface consists predominantly of a slime fraction suited to agricultural re-use of the land.
Claim 2
Dependent Claim 28 words
The method of claim 1, wherein the over-burden material used to construct the terrace and pillar ponds is blasted to a predetermined required size by product control blasting.
Claim 3
Dependent Claim 26 words
The method as defined in claim 1, further including the step of mining the pillars separating the cellular units of the ore body by cut-and-fill mining.
Claim 4
Dependent Claim 25 words
The method as defined in claim 3, wherein the fill material for the cut-and-fill mining steps is mill tailing slurry from an ore processing plant.
Claim 5
Dependent Claim 91 words
The method as defined in claim 1, wherein the predetermined reclaimed surface is effectively established by the height of the dykes forming the terrace and pillar ponds and the height of the terrace and pillar ponds are pre-planned to accommodate the swell factor of the material being mined, said swell factor being determined by a measurement of the volume of the material to be disposed of for a given area after the mining process is complete, as compared to the volume of the material for the area in its original state.
Claim 6
Independent Claim 501 words
A method of mining, land reclamation and hydropower and water resources development wherein a mining layout is established including a cellular mining grid having an even number of rows of mining cells, the rows being divided equally by a processing plant pillar, the processing plant pillar being a mass of the ore to be mined and centrally positioned within the cellular mining grid, the cells being separated by barrier pillars perpendicular to the plant pillar and access entry pillars parallel to the plant pillars separating the rows of cells on either side of the plant pillars, the barrier pillars and access entry pillars being of the same ore body material and having essentially the same shape and height, the said cells being mined in a step arrangement such that various adjacent cells are in different stages of mining completion, mining commencing at a face barrier pillar and proceeding parallel to the plant pillar towards an ultimate mining limit, large diameter bore holes in the form of entries being driven from the face barrier pillar into the entry and plant pillars and therethrough, cross-entries being driven from the entries perpendicular to the plant and access entry pillars through the cellular units, the level of the entries and cross-entries being designed to perform trajectory control blasting in the overburden and product control blasting in the predefined cellular units, the entries and cross-entries providing communication between adjacent cellular units after the mining has proceeded to the point that the ore is removed from the predefined cells, a processing plant for the ore mined from the predefined cells being positioned at the top of the ore body height on the processing plant pillar and adjacent the face barrier pillar, whereby the material removed from the cells may be passed upwardly to the processing plant and the refined ore recovered and the by-products, including tailings, being passed further upwardly to disposal areas, the mined-out cells being filled with overburden from the ore body adjacent the previously mined cells, and terrace ponds formed above the cells by dykes to provide chambers for disposal of the tailings, the area defined by adjacent plant pillars and bound by the face barrier pillar and the mining limit defining a hydropower and water resources development unit, termed a hydropower unit, a number of cell mining units being constructed during the course of the mining with certain of the cellular units having been completely exhausted of the ore material by cut-and-fill operations to define larger pillar recovery units separated by boundary pillars and the various cell recovery units establishing water control chambers, providing for underground water storage, the improvements comprising constructing a lower pool lake bed having a water level below the face barrier pillar, access slots on the face barrier pillar for access to the plant pillars and access pillars and ramps leading from the lower pool elevation to the access slots to provide passage for motor vehicles to pillar mining entries and cross-entries, drainage tunnels, and water quality control tunnels.
Claim 7
Independent Claim 501 words
A method of mining, land reclamation and hydropower and water resources development wherein a mining layout is established including a cellular mining grid having an even number of rows of mining cells, the rows being divided equally by a processing plant pillar, the processing plant pillar being a mass of the ore to be mined and centrally positioned within the cellular mining grid, the cells being separated by barrier pillars perpendicular to the plant pillar and access entry pillars parallel to the plant pillars separating the rows of cells on either side of the plant pillars, the barrier pillars and access entry pillars being of the same ore body material and having essentially the same shape and height, the said cells being mined in a step arrangement such that various adjacent cells are in different stages of mining completion, mining commencing at a face barrier pillar and proceeding parallel to the plant pillar towards an ultimate mining limit, large diameter bore holes in the form of entries being driven from the face barrier pillar into the entry and plant pillars and therethrough, cross-entries being driven from the entries perpendicular to the plant and access entry pillars through the cellular units, the level of the entries and cross-entries being designed to perform trajectory control blasting in the overburden and product control blasting in the predefined cellular units, the entries and cross-entries providing communication between adjacent cellular units after the mining has proceeded to the point that the ore is removed from the predefined cells, a processing plant for the ore mined from the predefined cells being positioned at the top of the ore body height on the processing plant pillar and adjacent the face barrier pillar, whereby the material removed from the cells may be passed upwardly to the processing plant and the refined ore recovered and the by-products, including tailings, being passed further upwardly to disposal areas, the mined-out cells being filled with overburden from the ore body adjacent the previously mined cells, and terrace ponds formed above the cells by dykes to provide chambers for disposal of the tailings, the area defined by adjacent plant pillars and bound by the face barrier pillar and the mining limit defining a hydropower and water resources development unit, termed a hydropower unit, a number of cell mining units being constructed during the course of the mining with certain of the cellular units having been completely exhausted of the ore material by cut-and-fill operations to define larger pillar recovery units separated by boundary pillars and the various cell recovery units establishing water control chambers, providing for underground water storage, the improvements comprising constructing a lower pool lake bed having a water level below the face barrier pillar, access slots on the face barrier pillar for access to the plant pillars and access pillars and ramps leading from the lower pool elevation to the access slots to provide passage for motor vehicles to pillar mining entries and cross-entries, drainage tunnels, and water quality control tunnels.
Claim 8
Dependent Claim 65 words
The method as defined in claim 6, further including leaving at least one mining cell adjacent the face barrier pillar open and free of any filling overburden or other material for use as an open cell water storage area, and further constructing tunnels and raises through the face barrier pillar communicating the lower pool with the upper portion of the open cell water storage area.
Claim 9
Dependent Claim 41 words
The method as defined in claim 7, further including constructing a power generation system adjacent the lower pool water level for generating power due to the passage of water from the open cell water storage tank to the lower water level.
Claim 10
Dependent Claim 23 words
The method as defined in claim 8, further including means for sUpplying water to the processing plant constructed on the processing plant pillar.
Claim 11
Dependent Claim 49 words
The method as defined in claim 8, further including reclaiming water from the ore processing plant tailings by downward percolation of the water into broken overburden-filled mining cells, thence through filter beds placed in the bottom of the mining cells and finally draining the water into the lower pool.
Claim 12
Dependent Claim 28 words
The method as defined in claim 10, further including constructing an overflow structure and mine spillway tunnels to transfer upper pool water from one hydropower unit to another.
Claim 13
Dependent Claim 449 words
The method of claim 2 wherein the product control blasting is conducted by: i. conducting test crater blasts at various depths to determine the breakage limits of the material in response to the blasts; ii. preparing a chart by plotting the slant distance to each of the types of fractures in the blasting failure process and to the doming limit from test crater blasts; iii. establishing a grid over the crater formed by each test blast and measuring the particle size of the broken material touched by the grid; iv. preparing a chart by plotting the variation of the predominant particle size with various charge depths at scaled depth ratios Delta ; v. determining in the range Delta d to Delta o from the chart of (iv) the value in the controlling burden direction at which the desired predominant particle size can be achieved, Delta d is the Delta value at which doming begins and Delta o is the value of do/N for the given charge weight, do being the depth of placement of a charge of the given weight which produces upon explosion of the charge maximum pressure rise within the material, and N being the depth of placement of a charge of the given weight which first begins to produce upon explosion of the charge fractures on the surface of the material in which the charge is placed; or in the range Delta o to Delta equals 0 the value at which the desired particle size can be achieved where predominant particle size from autogenous blasting ranges from near zero to that measured at Delta 0 of the crater tests; vi. decreasing the crater chart value (v) by subtracting for bench geometry a Delta increment adjustment ranging linearly from a maximum at Delta bo - Delta o for a controlling burden of magnitude Delta o to zero for a controlling burden Delta a or less or for a controlling burden Delta ss or greater, Delta increment being Delta bo minus Delta o, Delta bo being the value of dbo/N for the given charge weight, dbo being the perpendicular distance from the vertical free face to the center of gravity of explosive charge which produces upon explosion of said charge maximum pressure rise within the material, a is the Delta value at which the volume of the apparent crater is maximum, and Delta ss being the Delta value at which cratering begins; vii. placing the charge at a distance from the controlling burden toward the face of the bench corresponding to the adjusted Delta value; viii. placing the charge at a distance from the non-controlling free face at the crater test determined value; and i. detonating the charge.
Claim 14
Dependent Claim 124 words
A mining method including: a removing overburden from the ore body by trajectory control blasting; b. establishing a cellular grid structure including planned ore body cells separated by barrier pillars perpendicular to entry pillars; c. driving entries in the ore body perpendicular to the free face in said entry pillars; d. driving cross-entries from said entries through said planned ore body cells perpnedicular to said entries and at the same ore body level; e. constructing over cells filled with overburden and mill tailing, ramps and terraces forming an embankment to re-establish the terrain of the mined region; f. placing explosive charges in said cross-entries wIthin the area defined by the planned ore body cells for product control blasting; and g. detonating said explosive charges.
Claim 15
Dependent Claim 124 words
A mining method including: a removing overburden from the ore body by trajectory control blasting; b. establishing a cellular grid structure including planned ore body cells separated by barrier pillars perpendicular to entry pillars; c. driving entries in the ore body perpendicular to the free face in said entry pillars; d. driving cross-entries from said entries through said planned ore body cells perpnedicular to said entries and at the same ore body level; e. constructing over cells filled with overburden and mill tailing, ramps and terraces forming an embankment to re-establish the terrain of the mined region; f. placing explosive charges in said cross-entries wIthin the area defined by the planned ore body cells for product control blasting; and g. detonating said explosive charges.
Claim 16
Dependent Claim 178 words
The method of claim 13, wherein the trajectory control blasting is conducted by controlling the trajectory of material formed as bench geometry surrounding a blast charge in response to explosion of the charge by: i. placing a charge of weight W at a vertical depth Delta v, wherein Delta v dv/N wherein dv is the vertical depth, N being the depth of placement of a charge of given weight which first begins to produce upon explosion of the charge fractures on the surface of the material in which the charge is placed; ii. positioning said charge of weight W along a rearward extension of a line perpendicular to the bench free face at a burden Delta b wherein Delta b db/N wherein db is the burden distance and Delta b Delta v + Delta diff wherein Delta diff is a predetermined positive value, the trajectory being substantially in a vertical direction when Delta v is less than Delta b and substantially in the horizontal face direction when Delta b is less than v; and iii. detonating the charge.
Claim 17
Dependent Claim 18 words
The method of claim 13, wherein the material for constructing the embankment is produced by product control blasting.
Claim 18
Dependent Claim 94 words
A mining method including: a. clearing overburden from an extended area of underlying ore; b. excavating in a stepped fashion a grid of cellular units in the exposed ore body, said units separated by barrier pillars; c. forming ramps in the pillars as mining progresses downwardly for access to the ore; and d. providing means for removing water from streams adjacent the area being mined during periods of high stream flow to an upper pool formed as a reuslt of the mining operation and returning the water to the stream during low flow periods.
Claim 19
Dependent Claim 94 words
A mining method including: a. clearing overburden from an extended area of underlying ore; b. excavating in a stepped fashion a grid of cellular units in the exposed ore body, said units separated by barrier pillars; c. forming ramps in the pillars as mining progresses downwardly for access to the ore; and d. providing means for removing water from streams adjacent the area being mined during periods of high stream flow to an upper pool formed as a reuslt of the mining operation and returning the water to the stream during low flow periods.
Claim 20
Dependent Claim 40 words
The mining method claim 16, further including removing water contained within the overburden and ore body and storing the removed water in drainage collection cells and void storage cells which are constituted as previously mined cells filled with broken overburden.
Claim 21
Dependent Claim 41 words
The mining method of claim 17, further including constructing terrace ponds and pillar ponds above the previously filled mining cells for collecting surface run-off water and passing the surface run-off water downwardly into the previously mined cells filled with broken overburden.
Claim 22
Dependent Claim 73 words
The mining method of claim 18, further including controlling the flow of water from the drainage collection cells by valves positioned within the entries and cross-entries communiating between the mining cells to thereby direct the water through filter beds and water quality and drainage tunnels for use in irrigation and the milling process and collection of portions of the water in a lower pool for return as desired to augment low stream flow.
Claim 23
Dependent Claim 104 words
A mining method including: a. clearing overburden from an extended area of underlying ore; b. excavating in a stepped fashion a grid of cellular units in the exposed ore body, said units separated by barrier pillars; c. forming ramps in the pillars as mining progresses downwardly for access to the ore; d. drilling drain holes through the barrier pillars to provide water control tunnels communicating between said cells; and e. recovering water used in the ore processing plant by pumping a slurry of tailings to terrace and pillar ponds constructed above previously mined cells and filtering water from the slurry into void storage cells.
Claim 24
Dependent Claim 104 words
A mining method including: a. clearing overburden from an extended area of underlying ore; b. excavating in a stepped fashion a grid of cellular units in the exposed ore body, said units separated by barrier pillars; c. forming ramps in the pillars as mining progresses downwardly for access to the ore; d. drilling drain holes through the barrier pillars to provide water control tunnels communicating between said cells; and e. recovering water used in the ore processing plant by pumping a slurry of tailings to terrace and pillar ponds constructed above previously mined cells and filtering water from the slurry into void storage cells.

References Cited (Backward Citations)

US1103351A Cited
US1924721A Cited
US2874945A Cited
FR1385793A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1976-12-03 1977-06-04 1977-12-04 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1980-12-03 1981-06-04 1981-12-04 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1984-12-03 1985-06-04 1985-12-04 $7700.00 Window Closed / Lapsed