US3775091A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Induction melting of metals in cold, self-lined crucibles
Assignee: INTERIOR
•
Filing: 1969-02-27
•
Granted: 1973-11-27
•
Expires: 1989-02-27
Abstract
Abstract Metals such as titanium and zirconium are melted and formed by induction heating within a cold segmented metal crucible having a self-generating and self-renewing insulating lining.
Inventors
- 👤 P Clites
- 👤 R Beall
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-06 12:09
CPC Classifications
F; F27; F27B; F27B14/00; F27B14/06; C; C22; C22B; C22B4/00; H; H05; H05B; H05B6/00; H05B6/02; H05B6/22; H05B6/24; Y; Y02; Y02P; Y02P10/00; Y02P10/25
Claims Analysis
Total Claims: 10
Claim 1
Independent Claim
15 words
The apparatus of claim 1 wherein the insulating lining comprises an alkaline earth metal fluoride.
Claim 2
Dependent Claim
198 words
A process for melting and forming metals which comprises: a. placing an initial solid charge of a metal chosen from the group consisting of iron and nickel base alloys, titanium, zirconium, hafnium and their alloys, together with a slagging material, said material comprising a metallic compound having electrical insulating properties when solid and having a melting point below that of the metal charge, within a metallic crucible open at the top and bottom and of uniform cross-section throughout the length thereof and having sidewalls divided by longitudinal slits into at least two segments, each segment being maintained in electrical isolation from every other segment; b. establishing a pool of molten slag and metal within the crucible by applying an alternating electrical flux supplied by a primary induction coil surrounding an upper portion of the crucible; c. maintaining the temperature within a lower portion of the crucible at a temperature substantially less than that of the upper portion; d. continuously cooling the crucible to form and maintain a frozen slag lining on the interior surfaces of the crucible and filling the longitudinal slit, and e. adding additional solid metal to the molten pool to be melted and assimilated therein.
Claim 3
Dependent Claim
70 words
The process of claim 3 wherein the pool of molten slag and metal within the crucible is established on top of a metallic starting stub positioned within the lower portion of the crucible and wherein the starting stub is withdrawn at a rate substantially equal to the rate of addition of solid metal to the molten pool to continuously form an ingot conforming to the cross-sectional shape of the crucible.
Claim 4
Dependent Claim
14 words
The process of claim 4 wherein the cross-sectional shape of the crucible is circular.
Claim 5
Dependent Claim
27 words
The process of claim 4 wherein the initial metal charge and additional solid metal is chosen from the group consisting of titanium, zirconium, hafnium, and their alloys.
Claim 6
Dependent Claim
21 words
The process of claim 6 wherein the metal is titanium and wherein the Slagging material comprises an alkaline earth metal fluoride.
Claim 7
Dependent Claim
12 words
The process of claim 7 wherein the slagging material comprises calcium fluoride.
Claim 8
Dependent Claim
20 words
The process of claim 6 wherein the melting and forming of a refractory metal is performed in a non-reactive environment.
Claim 9
Dependent Claim
12 words
The process of claim 9 wherein the non-reactive environment comprises a vacuum.
Claim 10
Dependent Claim
14 words
The process of claim 9 wherein the non-reactive environment comprises an inert gas atmosphere.
References Cited (Backward Citations)
DE518499C
Cited
US2686946A
Cited
US2871533A
Cited
US2805148A
Cited
GB808843A
Cited
US2908739A
Cited
US3223519A
Cited
US3005246A
Cited
US3206301A
Cited
US3160497A
Cited
US3318363A
Cited
US3493363A
Cited
US3476171A
Cited
US3417808A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1976-11-26 | 1977-05-28 | 1977-11-27 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1980-11-26 | 1981-05-28 | 1981-11-27 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1984-11-26 | 1985-05-28 | 1985-11-27 | $7700.00 | Window Closed / Lapsed |