Claims Analysis
Total Claims: 14
Claim 1
Independent Claim
213 words
In the construction of shorelines to enclose bodies of water, the method comprising the steps of: a. excavating a trench, having opposed first and second sidewalls, along the periphery of a water body to be enclosed; b. placing elongated molding means in said trench, one side of said molding means having an irregular surface of decorative qualities and the other side being generally flat, the flat side of said molding means being held against the upper portion of the first sidewall of said trench closest to said water body to be enclosed, said molding means having an average thickness less than that of the width of the trench to form a void between the molding means and said second sidewall; c. pouring sufficient concrete into said void of said trench to substantially fill said void; d. allowing said concrete to initially set; e. excavating the soil adjacent said first sidewall so as to expose the flat side of the molding means; and f. removing the molding means subsequent to the initial setting of the poured-in concrete, whereby the concrete facing the irregular surface of the molding means has imparted to it the impressions of said irregular surface thereby resulting in a natural looking shoreline for the body of water to be retained therewithin.
Claim 2
Dependent Claim
213 words
In the construction of shorelines to enclose bodies of water, the method comprising the steps of: a. excavating a trench, having opposed first and second sidewalls, along the periphery of a water body to be enclosed; b. placing elongated molding means in said trench, one side of said molding means having an irregular surface of decorative qualities and the other side being generally flat, the flat side of said molding means being held against the upper portion of the first sidewall of said trench closest to said water body to be enclosed, said molding means having an average thickness less than that of the width of the trench to form a void between the molding means and said second sidewall; c. pouring sufficient concrete into said void of said trench to substantially fill said void; d. allowing said concrete to initially set; e. excavating the soil adjacent said first sidewall so as to expose the flat side of the molding means; and f. removing the molding means subsequent to the initial setting of the poured-in concrete, whereby the concrete facing the irregular surface of the molding means has imparted to it the impressions of said irregular surface thereby resulting in a natural looking shoreline for the body of water to be retained therewithin.
Claim 3
Dependent Claim
15 words
The method of claim 1, including excavating at least one of the trench walls angularly.
Claim 4
Dependent Claim
20 words
The method of claim 1 including excavating the trench non-linearly so as to impart an irregular apearance to the shoreline.
Claim 5
Dependent Claim
15 words
The method of claim 1, including using a polyurethane foam core in the molding means.
Claim 6
Dependent Claim
14 words
The method of claim 1 wherein said irregular surface resembles a natural rock-like surface.
Claim 7
Dependent Claim
13 words
The method of claim 1 wherein said irregular surface resembles a sandstone surface.
Claim 8
Dependent Claim
34 words
The method of claim 1, including delaying or accelerating the removal of the molding means from the concrete adhering thereto so as to vary the texture impressed by the molding means on Said concrete.
Claim 9
Dependent Claim
23 words
The method of claim 1, including pouring concrete to a level substantially above the level of the water body to be retained therewithin.
Claim 10
Dependent Claim
20 words
The method of claim 1, including providing a release agent to facilitate removal of the molding means from the concrete.
Claim 11
Dependent Claim
43 words
The method of claim 1, including placing a lining of compacted material on the bottom of the water body for control of seepage and erosion in the shoreline, said lining extending to a level substantially below the exposed concrete portion of the shoreline.
Claim 12
Dependent Claim
26 words
The method of claim 1 wherein said trench is sloped inwardly towards the body of water to be enclosed from the top to the bottom thereof.
Claim 13
Dependent Claim
193 words
In the construction of shorelines for artificial water bodies, the method comprising the steps of: a. excavating a trench in soil bordering the periphery of a water body; b. pouring a first quantity of concrete into the trench so as to fill up the lower portion of the trench and form a footing; c. placing molding means, one side of which has a surface of decorative irregularities, on said footing adjacent the wall of the trench bordering the periphery of the water body, said irregular surface of the molding means facing the oppositely situated wall of the trench; d. pouring a second quantity of concrete into the remaining void of the trench; e. excavating the soil of the wall of the trench bordering the periphery of the water body, whereby the molding means are exposed; and f. removing the molding means subsequent to the setting of the second quantity of concrete, whereby said concrete facing the side of the water body, having received a mirror image of the decorative inequalities of the molding means, is exposed so as to emerge as a natural looking shore-line for the water body to be retained therein.
Claim 14
Dependent Claim
193 words
In the construction of shorelines for artificial water bodies, the method comprising the steps of: a. excavating a trench in soil bordering the periphery of a water body; b. pouring a first quantity of concrete into the trench so as to fill up the lower portion of the trench and form a footing; c. placing molding means, one side of which has a surface of decorative irregularities, on said footing adjacent the wall of the trench bordering the periphery of the water body, said irregular surface of the molding means facing the oppositely situated wall of the trench; d. pouring a second quantity of concrete into the remaining void of the trench; e. excavating the soil of the wall of the trench bordering the periphery of the water body, whereby the molding means are exposed; and f. removing the molding means subsequent to the setting of the second quantity of concrete, whereby said concrete facing the side of the water body, having received a mirror image of the decorative inequalities of the molding means, is exposed so as to emerge as a natural looking shore-line for the water body to be retained therein.