← Back to Patent Explorer
US3759326A Expired / Lapsed US ⏱️ 0.0 years remaining

Secondary oil recovery method

Assignee: Texaco Inc
•
Filing: 1972-03-29
•
Granted: 1973-09-18
•
Expires: 1992-03-29
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for the production of hydrocarbons from subterranean reservoirs which comprises having at least one production well and one injection well penetrating the reservoir and injecting a fluid into the injection well to drive the hydrocarbons to the production well. The fluid comprises an intimate mixture of colloidal silica and a material which is miscible with the hydrocarbons in the reservoir.

Inventors

  • 👤 J Kolaian
  • 👤 C Christopher
  • 👤 J Allen

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 15:58
CPC Classifications
C; C09; C09K; C09K8/00; C09K8/58; E; E21; E21B; E21B43/00; E21B43/16

Claims Analysis

Total Claims: 7
Claim 1
Independent Claim 15 words
A method as in claim 1 wherein the injected fluid is injected as a slug.
Claim 2
Dependent Claim 25 words
A method as in claim 1 wherein the mobility ratio between the injected fluid and the reservior hydrocarbon is from about 0.1 to about 10.
Claim 3
Dependent Claim 17 words
A method as in claim 3 wherein the mobility ratio is from about 0.9 to about 3.
Claim 4
Dependent Claim 70 words
In a method for recovering hydrocarbons from subterranean hydrocarbon bearing reservoirs wherein at least one injection well and one production well are in fluid communication with said reservoir and an injection fluid is injected into the injection well and hydrocarbons are produced from the production well the improvement which comprises: injecting a thickened fluid comprising an intimate mixture of colloidal silica and a hydrocarbon solvent miscible with the reservoir hydrocarbons.
Claim 5
Dependent Claim 14 words
A method as in claim 5 wherein the fluid is injected as a slug.
Claim 6
Dependent Claim 25 words
A method as in claim 5 wherein the mobility ratio between the injected fluid and the reservoir hydrocarbon is from about 0.1 to about 10.
Claim 7
Dependent Claim 16 words
A method as in claim 7 wherein the mobility ratio is from about 0.9 to 3.0.

References Cited (Backward Citations)

US2816610A Cited
US2920041A Cited
US3070161A Cited
US3167118A Cited
US3326287A Cited
US3368620A Cited
US3375872A Cited
US3412792A Cited
US3515216A Cited
US3476187A Cited
US3566967A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1976-09-17 1977-03-19 1977-09-18 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1980-09-17 1981-03-19 1981-09-18 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1984-09-17 1985-03-19 1985-09-18 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag