← Back to Patent Explorer
US3754599A Expired / Lapsed US ⏱️ 0.0 years remaining

Use of micellar solutions to improve perforating process

Assignee: Marathon Oil Co
•
Filing: 1971-12-15
•
Granted: 1973-08-28
•
Expires: 1991-12-15
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A process of perforating an oil-bearing subterranean formation wherein the perforations in the reservoir are caused by a holeproducing apparatus, the improvement comprising perforating the reservoir in the presence of a micellar dispersion. The micellar dispersion can be at a pressure sufficient to cause the dispersion to displace out into the reservoir after the perforations are effected. Cleaning of the perforations, removing mud filtrates, etc., are effected with the dispersion. Where water sensitive reservoirs are perforated, an oil-external dispersion is used since it is compatible with such reservoirs.

Inventors

  • 👤 J Hummel
  • 👤 M Svaldi

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-03 05:29
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/11; E21B43/119; C; C09; C09K; C09K8/00; C09K8/52; C09K8/528

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 64 words
The process of claim 1 wherein the micellar dispersion contains about 2 to about 70 PERCENT by volume hydrocarbon, about 5 to about 95 percent volume aqueous medium, about 4 percent to about 20 percent by volume surfactant, and optionally about 0.01 to about 20 percent by volume cosurfactant and/or about 0.001 to about 10 percent by weight, based on the aqueous medium, electrolyte.
Claim 2
Dependent Claim 20 words
The process of claim 1 wherein the micellar dispersion contains an aqueous phase having a pH less than about 1.
Claim 3
Dependent Claim 34 words
The process of claim 1 wherein the micellar dispersion is at a pressure sufficient to cause the micellar dispersion to disperse out into the reservoir once the perforations are effected in the reservoir rock.
Claim 4
Dependent Claim 12 words
The process of claim 4 wherein the reservoir rock is unconsolidated sandstone.
Claim 5
Dependent Claim 68 words
The process of claim 1 wherein the perforating of the oil-bearing reservoir is carried out in a portion of the well bore that is packed off from the rest of the well bore and wherein a container under a pressure less than the reservoir pressure is present and wherein upon perforating the reservoir rock, a void space within the container is permitted to be filled with reservoir liquids.
Claim 6
Dependent Claim 138 words
An improved method of perforating a subterranean formation wherein a perforating tool is lowered into a well bore in communication with the reservoir and wherein the perforating tool is activated to cause perforations out into the reservoir rock, the improvement comprising carrying out the perforating process in the presence of a micellar dispersion which submerses the perforating tool therein, the micellar dispersion containing about 2 to about 70 percent by volume of hydrocarbon, about 5 to about 95 percent by volume of aqueous medium, about 4 to about 20 percent of a petroleum sulfonate having an average equivalent weight within the range of about 350 to about 525, and optionally about 0.01 to about 20 percent by volume of cosurfactant and/or about 0.001 to about 10 percent by weight, based on the aqueous medium, of an inorganic electrolyte.
Claim 7
Dependent Claim 13 words
The process of claim 7 wherein the inorganic electrolyte is an inorganic acid.
Claim 8
Dependent Claim 11 words
The process of claim 7 wherein the micellar dispersion is oil-external.
Claim 9
Dependent Claim 18 words
The process of claim 7 wherein the aqueous phase of the micellar dispersion contains a fluid loss agent.
Claim 10
Dependent Claim 12 words
The process of claim 7 wherein the reservoir is an unconsolidated sandstone.
Claim 11
Dependent Claim 23 words
The process of claim 11 wherein the micellar dispersion contains a consolidating agent to consolidate at least a portion of the unconsolidated sandstone.
Claim 12
Dependent Claim 83 words
The process of claim 7 wherein at least a portion of the reservoir to be perforated is packed off from the other portion of the well bore and wherein a container having a void space and under a pressure substantially less than the reservoir pressure is present in the portion of the well bore to be perforated and also wherein the void space within the container is permitted to fill with the reservoir fluids once the perforations are effected in the reservoir rock.

References Cited (Backward Citations)

US2356205A Cited
US2693856A Cited
US2766828A Cited
US2832415A Cited
US2837164A Cited
US2805722A Cited
US2894584A Cited
US3170517A Cited
US3437143A Cited
US3517745A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1976-08-27 1977-02-26 1977-08-28 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1980-08-27 1981-02-26 1981-08-28 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1984-08-27 1985-02-26 1985-08-28 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag