← Back to Patent Explorer
US3745453A Expired / Lapsed US ⏱️ 0.0 years remaining

Instruments for checking the operation of earth leakage circuit breakers

Assignee: ZF International UK Ltd
•
Filing: 1971-04-27
•
Granted: 1973-07-10
•
Expires: 1991-04-27
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An instrument for checking the operation of earth leakage circuit breakers comprises terminals for connection to an a.c. circuit, a first capacitor which when the instrument is connected to the circuit is charged through a rectifier to provide a power source and a test switch which is operable to present to the a.c. circuit a predetermined live to earth leakage current. A second capacitor which is charged when the test switch is operated, charging of the second capacitor terminating when the circuit breaker being tested operates, provides an input to an amplifier powered by the first capacitor, and the amplifier operates warning means for giving the required indication.

Inventors

  • 👤 M Wright

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 05:26
CPC Classifications
H; H02; H02H; H02H3/00; H02H3/26; H02H3/32; H02H3/33; H02H3/334; H02H3/335

Claims Analysis

Total Claims: 8
Claim 1
Independent Claim 314 words
An instrument for checking the operation of an earth leakage circuit breaker, said earth leakage circuit breaker being incorporated in a three wire a.c. circuit presenting live, neutral, and earth output lines for connection of loads thereto and detecting a predetermined leakage current between the live and earth lines in said a.c. circuit, and then automatically breaking the circuit when a predetermined leakage current exists, said checking instrument comprising in combination a terminal for connection to each line in said a.c. circuit such that the instrument constitutes a load, a first capacitor, means including a rectifier coupling said first capacitor across said terminals for connection to the live and neutral lines, said first capacitor thereby being charged through said rectifier when the instrument is connected to said a.c. circuit to provide a power source, a test switch connected in series with an impedance across said terminals for connection to the live and earth lines, said test switch when closed providing a shunt circuit path between said live and earth terminals simulating a predetermined live line to earth line leakage current, a second capacitor connected in circuit with said test switch between said terminals for connection to the live and neutral lines of the a.c. circuit, such that said second capacitor charges only when said test switch is closed, whereby said earth leakage circuit breaker being tested serves upon proper operation thereof to break the a.c. circuit whereupon said second capacitor ceases to charge, said first capacitor thereafter continuing to provide a power source for the instrument after disconnection of the a c circuit, said instrument further including an amplifier powered by said first capacitor, and means coupling said second capacitor to the input of said amplifier, said amplifier operating warning means for indicating the state of charge of said second capacitor, which is a measure of satisfactory operation of the circuit breaker being tested.
Claim 2
Dependent Claim 314 words
An instrument for checking the operation of an earth leakage circuit breaker, said earth leakage circuit breaker being incorporated in a three wire a.c. circuit presenting live, neutral, and earth output lines for connection of loads thereto and detecting a predetermined leakage current between the live and earth lines in said a.c. circuit, and then automatically breaking the circuit when a predetermined leakage current exists, said checking instrument comprising in combination a terminal for connection to each line in said a.c. circuit such that the instrument constitutes a load, a first capacitor, means including a rectifier coupling said first capacitor across said terminals for connection to the live and neutral lines, said first capacitor thereby being charged through said rectifier when the instrument is connected to said a.c. circuit to provide a power source, a test switch connected in series with an impedance across said terminals for connection to the live and earth lines, said test switch when closed providing a shunt circuit path between said live and earth terminals simulating a predetermined live line to earth line leakage current, a second capacitor connected in circuit with said test switch between said terminals for connection to the live and neutral lines of the a.c. circuit, such that said second capacitor charges only when said test switch is closed, whereby said earth leakage circuit breaker being tested serves upon proper operation thereof to break the a.c. circuit whereupon said second capacitor ceases to charge, said first capacitor thereafter continuing to provide a power source for the instrument after disconnection of the a c circuit, said instrument further including an amplifier powered by said first capacitor, and means coupling said second capacitor to the input of said amplifier, said amplifier operating warning means for indicating the state of charge of said second capacitor, which is a measure of satisfactory operation of the circuit breaker being tested.
Claim 3
Dependent Claim 15 words
An instrument as claimed in claim 1 in which the warning means is a meter.
Claim 4
Dependent Claim 33 words
An instrument as claimed in claim 1 in which the first capacitor is charged through said rectifier from the secondary winding of a transformer having its primary winding connected in the a.c. circuit.
Claim 5
Dependent Claim 14 words
An instrument as claimed in claim 1 including means for varying the leakage current.
Claim 6
Dependent Claim 33 words
An instrument as claimed in claim 2 including a resistor in series with the meter, said resistor being variable so that the circuit can be calibrated to allow for tolerance in the components.
Claim 7
Dependent Claim 24 words
An instrument as claimed in claim 1 in which said second capacitor is charged through a second rectifier by the a.c. supply in use.
Claim 8
Dependent Claim 42 words
An instrument as claimed in claim 6 in which the second rectifier is a full wave rectifier having its input terminals connected across a resistor which determines said live to earth leakage current, and the second capacitor connected across its output terminals.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1976-07-09 1977-01-08 1977-07-10 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1980-07-09 1981-01-08 1981-07-10 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1984-07-09 1985-01-08 1985-07-10 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag