US3743036A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Diamond bit with annular mud distributing groove
Assignee: Shell USA Inc
•
Filing: 1972-05-10
•
Granted: 1973-07-03
•
Expires: 1992-05-10
Abstract
Abstract In a full hole diamond bit of the type provided with a core ejector an improved mud distribution system includes two sets of mud channels communicating with an annular groove concentric with the central bit axis. Mud is supplied to the groove via conduits communicating with the central mud flow passage of the bit.
Inventors
- 👤 R Feenstra
- 👤 J Hinze
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-24 02:21
CPC Classifications
E; E21; E21B; E21B10/00; E21B10/02; E21B10/04; E21B10/46; E21B10/48
Claims Analysis
Total Claims: 9
Claim 1
Independent Claim
321 words
An improved full hole diamond bit of the type which includes a shank having a side wall and a central bore; a cutting surface connected to the shank for cutting a hole during operation of the bit, the cutting surface comprising a side wall portion for scraping the wall of the hole during operation, and also comprising a core-forming portion for scraping a portion of the hole bottom during operation, the core forming portion comprising a diamond-carrying surface tapered upwardly toward the top of the bit when in the operating position; and a core ejector conduit extending from the upper end of the core-forming portion of the cutting surface through the side wall of the shank; wherein, in operation, the full hole diamond bit forms a core which passes up the core ejector conduit and is ejected through the shank side wall, and wherein the improvement comprises a system for distributing mud to the cutting surface which comprises: an annular groove provided in the core-forming part of the cutting surface; at least one fluid supply conduit connecting the annular groove with the central bore of the shank; and a plurality of channels formed in the cutting surface, said channels intersecting the annular groove; said channels being divided into at least two groups of at least one channel each, a first group of channels extending away from the annular groove along the cutting surface towards the core ejector conduit and a second group of channels extending away from the annular groove along the cutting surface toward the side wall portion thereof, whereby, in operation, drilling fluid flows from the central bore of the shank, through the fluid supply conduits, into the annular groove and then in part flows through the first group of channels in the cutting surface toward the core ejection conduit, and in part flows through the second group of channels in the cutting surface towards the side wall portion.
Claim 2
Dependent Claim
321 words
An improved full hole diamond bit of the type which includes a shank having a side wall and a central bore; a cutting surface connected to the shank for cutting a hole during operation of the bit, the cutting surface comprising a side wall portion for scraping the wall of the hole during operation, and also comprising a core-forming portion for scraping a portion of the hole bottom during operation, the core forming portion comprising a diamond-carrying surface tapered upwardly toward the top of the bit when in the operating position; and a core ejector conduit extending from the upper end of the core-forming portion of the cutting surface through the side wall of the shank; wherein, in operation, the full hole diamond bit forms a core which passes up the core ejector conduit and is ejected through the shank side wall, and wherein the improvement comprises a system for distributing mud to the cutting surface which comprises: an annular groove provided in the core-forming part of the cutting surface; at least one fluid supply conduit connecting the annular groove with the central bore of the shank; and a plurality of channels formed in the cutting surface, said channels intersecting the annular groove; said channels being divided into at least two groups of at least one channel each, a first group of channels extending away from the annular groove along the cutting surface towards the core ejector conduit and a second group of channels extending away from the annular groove along the cutting surface toward the side wall portion thereof, whereby, in operation, drilling fluid flows from the central bore of the shank, through the fluid supply conduits, into the annular groove and then in part flows through the first group of channels in the cutting surface toward the core ejection conduit, and in part flows through the second group of channels in the cutting surface towards the side wall portion.
Claim 3
Dependent Claim
58 words
The full hole diamond bit of claim 1 wherein each of the plurality of cHannels has a longitudinal axis which is arranged in a flat plane and wherein the cutting surface comprises a plurality of single rows of diamonds each row comprising a plurality of diamonds placed in one of the side walls of one of the channels.
Claim 4
Dependent Claim
33 words
The full hole diamond bit of claim 1 wherein the area of the cross-section of the annular groove is larger than the area of the cross-section of each of the plurality of channels.
Claim 5
Dependent Claim
117 words
The full hole diamond bit of claim 1 further including a plurality of channels in the core-forming part which intersect the ejector conduit but do not intersect the annular groove; wherein channels in the first group of channels do not intersect the ejector conduit; wherein at least some of the channels in the first group of channels border on sector-shaped areas of the cutting surface, said sectors being defined by adjacent channels; and wherein one of the adjacent channels bordering on each sector-shaped area is a channel which communicates with the annular groove only, and the other of the adjacent channels bordering on the sector-shaped area is a channel which communicates with the core ejector conduit only.
Claim 6
Dependent Claim
45 words
The full hole diamond bit of claim 1, wherein the fluid supply conduits intersect the annular groove from above and the channels in the second group of channels intersect the annular groove from below both directions being taken with the bit in its operative position.
Claim 7
Dependent Claim
50 words
The full hole diamond bit of claim 5, wherein the intersection of at least one fluid supply conduit with the annular groove is located between but on the opposite side of the annular groove from the respective intersections with the annular groove of two of the second group of channels.
Claim 8
Dependent Claim
47 words
The full hole diamond bit of claim 5, wherein the intersection of at least one fluid supply conduit with the annular groove is directly oppositely positioned across the annular groove from the intersection of at least one of the second group of channels with the annular groove.
Claim 9
Dependent Claim
70 words
The full hole diamond bit of claim 5, wherein the channels in the first group of channels intersect the annular groove from above when the bit is in its operating position, and wherein the intersection of at least one channel in the first group of channels is located between and on the same side of the annular groove as the intersection of the annular groove with two fluid supply conduits.
References Cited (Backward Citations)
US2708103A
Cited
US2708105A
Cited
US2990897A
Cited
US2931630A
Cited
GB900099A
Cited
US3127946A
Cited
US3215215A
Cited
US3552505A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1976-07-02 | 1977-01-01 | 1977-07-03 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1980-07-02 | 1981-01-01 | 1981-07-03 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1984-07-02 | 1985-01-01 | 1985-07-03 | $7700.00 | Window Closed / Lapsed |