← Back to Patent Explorer
US3735769A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for pumping oil through terrain containing permafrost

Assignee: Individual
•
Filing: 1971-04-08
•
Granted: 1973-05-29
•
Expires: 1991-04-08
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method of pumping oil in the Arctic in which an oil pipeline is located inside a natural gas pipeline. The cold natural gas pipeline insulates the warm oil pipeline and prevents the latter from melting the permafrost. Alternatively, alternate slugs of oil and gas can be pumped through one pipeline or through two pipelines located side-by-side, the temperatures and volumes of the gas slugs being controlled so that the temperature at the exterior of the pipeline installation remains below 32* F.

Inventors

  • 👤 J Miller

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 04:05
CPC Classifications
F; F17; F17D; F17D1/00; F17D1/08; F17D1/084; Y; Y10; Y10T; Y10T137/00; Y10T137/0318; Y10T137/0391; Y10T137/6416; Y10T137/6579

Claims Analysis

Total Claims: 7
Claim 1
Independent Claim 93 words
A method of pumping oil from an oil field to a distant collection area through terrain of a type which may contain permafrost, comprising: a. pumping said oil through pipeline means, b. pumping natural gas through said pipeline means while maintaining said oil and gas separate in masses of substantial volume, c. and heating said oil to maintain its temperature above 32* F to facilitate flow of said oil while cooling said gas to maintain the temperature at the exterior of said pipeline means below 32* F, whereby to avoid melting said permafrost.
Claim 2
Independent Claim 93 words
A method of pumping oil from an oil field to a distant collection area through terrain of a type which may contain permafrost, comprising: a. pumping said oil through pipeline means, b. pumping natural gas through said pipeline means while maintaining said oil and gas separate in masses of substantial volume, c. and heating said oil to maintain its temperature above 32* F to facilitate flow of said oil while cooling said gas to maintain the temperature at the exterior of said pipeline means below 32* F, whereby to avoid melting said permafrost.
Claim 3
Dependent Claim 28 words
A method according to claim 1 wherein said oil is pumped in an inner pipeline and said gas is pumped in an outer pipeline enclosing said inner pipeline.
Claim 4
Dependent Claim 25 words
A method according to claim 1 wherein said step c. includes pumping heat from said gas to said oil at spaced intervals along said pipeline.
Claim 5
Dependent Claim 24 words
A method according to claim 1 wherein said step c. includes utilizing said natural gas to provide energy for pumping and heating said oil.
Claim 6
Dependent Claim 19 words
A method according to claim 1 wherein alternate slugs of oil and gas are pumped through said pipeline means.
Claim 7
Dependent Claim 48 words
A method according to claim 5 wherein said pipeline means comprises two pipelines side-by-side and alternate slugs of gas and oil are pumped through each pipeline, the gas and oil slugs of one pipeline being staggered with respect to the gas and oil slugs of the other pipeline.

References Cited (Backward Citations)

US2475635A Cited
US3169576A Cited
US3110754A Cited
US3143861A Cited
US3099993A Cited
US3471177A Cited
US3494287A Cited
US3600104A Cited
US3537514A Cited
US3625258A Cited
US3620236A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1976-05-28 1976-11-27 1977-05-29 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1980-05-28 1980-11-27 1981-05-29 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1984-05-28 1984-11-27 1985-05-29 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag