← Back to Patent Explorer
US3722591A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for insulating and lining a borehole in permafrost

Assignee: ConocoPhillips Co
•
Filing: 1971-04-12
•
Granted: 1973-03-27
•
Expires: 1991-04-12
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A borehole penetrating a subterranean region is insulated and lined by hardening in place a hardenable, flowable composition consisting essentially of a hardenable, flowable, adhesive cement and a divided, solid, closed-cell material wherein the closedcell material can comprise as much as about 80 volume percent of the hardenable, flowable composition and wherein the hardened material forming the liner has a hydrostatic crush strength of about 200-5,000 psi, or more. More particularly, syntactic foams are formed in situ to line boreholes penetrating permafrost.

Inventors

  • 👤 O Maxson

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 23:21
CPC Classifications
E; E21; E21B; E21B33/00; E21B33/10; C; C09; C09K; C09K8/00; C09K8/42; Y; Y10; Y10S; Y10S166/00; Y10S166/901

Claims Analysis

Total Claims: 3
Claim 1
Independent Claim 146 words
A method for insulating and lining a borehole penetrating a subterranean region comprising forming a liner in situ by hardening in place a hardenable, flowable composition consisting essentially of a hardenable, flowable, adhesive cement and a divided, solid, closed-cell material, wherein the divided, solid, closed-cell material comprises as much as about 80 volume percent of the hardenable, flowable composition, and wherein the hardened material forming the liner has a hydrostatic crush strength of at least about 200 psi; wherein the hardenable, flowable composition contains about 10 to 60 volume percent of hollow siliceous microspheres whose diameters are in the range of 1 to 1000 microns having wall thicknesses of 0.5 to 10 percent of their diameters, and the remainder comprises a hardenable, flowable, adhesive cement, said hardenable, flowable, adhesive cement comprising a hydraulic cement, an epoxy resin, a phenolformaldehyde resin, a polyurethane resin, or a polysulfide.
Claim 2
Independent Claim 119 words
A method for insulating and lining a borehole penetrating a permafrost region comprising drilling a borehole through the permafrost region, removing extraneous material from the borehole, flowing a hardenable, flowable composition consisting essentially of a hardenable, flowable, adhesive cement and a divided, solid, close-cell material into the borehole filling said borehole, hardening the hardenable, flowable composition in the borehole, and drilling a smaller diameter borehole through the hardened material to complete the formation of the insulating liner in the original borehole; wherein the divided, solid, closed-cell material comprises as much as about 80 volume percent of the hardenable, flowable composition; and wherein the hardened material forming the liner has a hydrostatic crush strength of at least about 200 psi.
Claim 3
Independent Claim 129 words
A method for insulating and lining a borehole penetrating a permafrost region comprising forming a liner in situ by hardening in place to form hardened matter a hardenable, flowable composition consisting essentially of a hardenable, flowable, adhesive cement consisting essentially of an epoxy resin plus a hardening agent plus a divided, solid, closed-cell material; wherein the divided, solid, closed-cell material comprises as much as about 80 volume percent of a hardenable, flowable composition; wherein about 10 to 60 volume percent of the hardenable, flowable composition is hollow, siliceous, microspheres having diameters in the range of 1 to 1000 microns and wall thicknesses of 1 to 5 percent of their diameters; and wherein the hardened matter of the liner has a hydrostatic crush strength of about 200 to 15,000 psig.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1976-03-26 1976-09-25 1977-03-27 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1980-03-26 1980-09-25 1981-03-27 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1984-03-26 1984-09-25 1985-03-27 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag