Claim 1
Independent Claim
121 words
A method for constructing a multi-story building comprising the steps of: erecting a plurality of upwardly extending vertical columns of sufficient height to accommodate a plurality of stories of the completed building spaced along the height thereof, constructing a first structurally stable floor element at a first elevation on said columns, constructing a second structurally stable floor element directly attached to and supported solely by said columns and removably attached to said columns at a temporary elevation on said columns spaced slightly above said first elevation, elevating said second structurally stable floor element from said temporary elevation to a permanent elevation above said temporary elevation, and, permanently attaching said second structurally stable floor element to said columns at said permanent elevation.
Claim 2
Independent Claim
121 words
A method for constructing a multi-story building comprising the steps of: erecting a plurality of upwardly extending vertical columns of sufficient height to accommodate a plurality of stories of the completed building spaced along the height thereof, constructing a first structurally stable floor element at a first elevation on said columns, constructing a second structurally stable floor element directly attached to and supported solely by said columns and removably attached to said columns at a temporary elevation on said columns spaced slightly above said first elevation, elevating said second structurally stable floor element from said temporary elevation to a permanent elevation above said temporary elevation, and, permanently attaching said second structurally stable floor element to said columns at said permanent elevation.
Claim 3
Independent Claim
178 words
A method for constructing a multi-story building comprising the steps of: erecting a plurality of upwardly extending vertical columns of sufficient height to accommodate a plurality of stories of the completed building spaced along the height thereof, constructing a first structurally stable floor element directly attached to and supported solely by said columns and removably attached to said columns at a first temporary elevation, constructing a second structurally stable floor element directly attached to and supported solely by said columns and removably attached to said columns at a second temporary elevation on said columns spaced slightly above said first temporary elevation, elevating said second structurally stable floor element from said second temporary elevation to a second permanent elevation aBove said second temporary elevation, permanently attaching said second structurally stable floor element to said columns at said second permanent elevation, elevating said first structurally stable floor element from said first temporary elevation to a first permanent elevation above said first temporary elevation, and permanently attaching said first structurally stable floor element to said columns at said first permanent elevation.
Claim 4
Independent Claim
178 words
A method for constructing a multi-story building comprising the steps of: erecting a plurality of upwardly extending vertical columns of sufficient height to accommodate a plurality of stories of the completed building spaced along the height thereof, constructing a first structurally stable floor element directly attached to and supported solely by said columns and removably attached to said columns at a first temporary elevation, constructing a second structurally stable floor element directly attached to and supported solely by said columns and removably attached to said columns at a second temporary elevation on said columns spaced slightly above said first temporary elevation, elevating said second structurally stable floor element from said second temporary elevation to a second permanent elevation aBove said second temporary elevation, permanently attaching said second structurally stable floor element to said columns at said second permanent elevation, elevating said first structurally stable floor element from said first temporary elevation to a first permanent elevation above said first temporary elevation, and permanently attaching said first structurally stable floor element to said columns at said first permanent elevation.