← Back to Patent Explorer
US3706031A Expired / Lapsed US ⏱️ 0.0 years remaining

Test circuit for exploding bridgewire power supply

Assignee: United States Department of the Army
•
Filing: 1971-04-05
•
Granted: 1972-12-12
•
Expires: 1991-04-05
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A TEST CIRCUIT FOR DETERMINING IF AN OUTPUT PULSE FROM AN EXPLODING BRIDGEWIRE POWER SOURCE HAS SUFFICIENT VOLTAGE AND ENERGY TO FIRE A BRIDGEWIRE. A GAS FILLED TUBE SUCH AS A COLD-CATHODE TRIGGER AND REGULATING TUBE IN SERIES WITH A FUSIBLE TEST LINK SIMULATES AND EXPLODING BRIDGEWIRE WITH A SERIES SPARK GAP. IF A PULSE FROM THE POWER SOURCE IS OF SUFFICIENT VOLTAGE AND ENERGY, THE TUBE CONDUCTS, AND THE TEST LINK FUSES. IF THE PULSE HAS SUFFICIENT VOLTAGE TO MAKE THE TUBE CONDUCT BUT HAS INSUFFICIENT ENERGY, THE TEST LINK WILL NOT FUSE. INDICATORS ARE LIT DEPENDING ON WHETHER THE TUBE CONDUCTS AND THE TEST LINK FUSES. IN THE EVENT THAT THE PULSE DOES NOT FUSE THE TEST LINK, THE LINK IS AUTOMATICALLY FUSED BY THE TEST CIRCUIT, TO PREVENT REUSE OF THE LINK.

Inventors

  • 👤 Ernest D Boutwell
  • 👤 Jack M Longfellow

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 21:19
CPC Classifications
F; F42; F42D; F42D1/00; F42D1/04; F42D1/045; F42D1/05

Claims Analysis

Total Claims: 0
No claims parsed yet. Click Sync Now above to re-index claims from Google Patents.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1975-12-12 1976-06-12 1976-12-12 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1979-12-12 1980-06-12 1980-12-12 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1983-12-12 1984-06-12 1984-12-12 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag