Furnace wall construction
Abstract
Abstract An efficient and inexpensive wall construction is provided for an electric furnace of the resistance type in which breakage is minimized and parts are easily replaced if breakage does occur. The furnace lining extends over the inside wall of the furnace and includes ceramic panels designed to receive and support electrical resistance elements, such as resistor ribbon or the like. In one form the lining comprises a layer of fibrous ceramic insulating material which is supported on the inside of a furnace outer wall or shell. Headed fastener studs extend through the insulating material and are secured to the furnace shell with their heads spaced therefrom. The ceramic heating element support panels are removably mounted on the fastener studs and held in place by the headed ends thereof. In a preferred form of the construction the ceramic panels are disposed in horizontal rows whereby the panels of one row rest on and are partially supported by the panels of the row below.
Inventors
- 👤 Gerald W Hicks
Bibliographic Details
Claims Analysis
Total Claims: 7References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1975-12-05 | 1976-06-05 | 1976-12-05 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1979-12-05 | 1980-06-05 | 1980-12-05 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1983-12-05 | 1984-06-05 | 1984-12-05 | $7700.00 | Window Closed / Lapsed |